F16SOL1044_Ammendment_3.pdf
PDF 3 MB Posted
- Attached to
- Renewal of the Police Station and replacement of the public restrooms, pavilion and site utilities
- Solicitation number
- F16SOL10044
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
F16SOL10044
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
OCON
Washington DC 20013-7012
MRC 1200
P.O. BOX 37012
OCON
OCON
Washington DC 20013-7012
MRC 1200
P.O. BOX 37012
SMITHSONIAN INSTITUTION
06/10/2016000003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/10/2016
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Solicitation Number F16SOL1004 is hereby amended as follows:
A. Section J shall be amended by the addition of the following attachment:
J.18 Addendum, DATE: 7.1.2016, PROJECT NAME: Renew Police Station, Replace Public Restrooms and Pavilion and
Electrical Substation - attached hereto.
Outside of the changes referenced above, Solicitation F16SOL10044 remains unchanged.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Dorothy A. Leffler
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
F16SOL10044 1 of 18
SUMMARY OF REVISIONS TO CONTRACT DOCUMENTS
ISSUE: Addendum
DATE: 7.1.2016
PROJECT NAME: Renew Police Station, Replace Public Restrooms and Pavilion and Electrical Substation
PROJECT NUMBER: 1633109
OWNER: Smithsonian Institution / National Zoological Park
The first table below contains line-by-line revisions made to the specifications that were issued with the Bid Documents dated 6/3/2016.
The second table below provides a summary of revisions to the drawings that were issued with the Bid Documents dated 6/3/2016. Please refer to the clouded drawings issued with the Addendum for the substance of the revisions.
CHANGES TO SPECIFICATIONS
Section Description
Volume 1
024119 SELECTIVE DEMOLITION – Part 3, Article 3.1, Paragraph E - Delete in its entirety.
Volume 2
071413 Add New Specification - 071413 HOT FLUID-APPLIED RUBBERIZED ASPHALT WATERPROOFING for plaza roof deck and exterior walls of underground mechanical, electrical, AV, and IT rooms.
075423 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING - Part 1, Article 1.2, Paragraph A, No. 3 - delete reference, and protection mat at plaza deck in its entirety.
077273 MEMBRANE LEAK DETECTION SYSTEM – Delete specification section in its entirety.
F16SOL10044 2 of 18
SUMMARY OF CHANGES TO DRAWINGS
Sheet Number Description
CIVIL
Not Used
LANDSCAPE
ARCHITECTURAL
Volume 2
2A 5 03 Revise detail J1 to add roof deck membrane flashing continuous under light fixture back box.
STRUCTURAL
PLUMBING
MECHANICAL
ELECTRICAL
Volume 1
1E 3 01 Reissue sheet – revise revision 1, dated 6/24/2016 “Not for Construction” to “For Construction”.
1E 8 03 Reissue sheet – revise revision 1, dated 6/24/2016 “Not for Construction” to “For Construction”.
FIRE ALARM / FIRE SUPRESSION
F16SOL10044 3 of 18
Sheet Number Description
Not Used
TECHNOLOGY / AV-IT
Volume 2
2AV-101 Remove 1½” EMT conduit riser at column line 3A. All speaker conduit is now being fed from riser located at 1C. Adjusted notes and detail callouts to reflect this change.
2AV-102 Remove 1½” EMT conduit riser at column line 3A. All speaker conduit is now being fed from riser located at 1C. Adjusted notes and detail callouts to reflect this change.
2AV-202 Relocated speaker EMT conduit to be concealed behind steel beam.
Provided new note to further clarify routing of speaker conduit.
2AV-501 Relocated speaker conduit to behind steel beam on all details. Adjusted notes to clarify design intent.
2AV-501 Adjusted conduit and junction box in Exterior Wall Mounted Speaker detail to be concealed within curtain wall spandrel panel.
2AV-501 Adjusted Speaker Conduit Detail to show just speaker conduit routing as the speaker conduit riser is no longer located at that location.
2AV-501 Provide new detail to show new speaker conduit riser routing.
SECURITY
1 TY 002
Narrative only
Transitions Notes – Replace Note 1 in entirety as provided:
1. Prior to demolition or construction starting in the police station, the field hardware connections for the security equipment not located in the building will need to be connected to the field panel (iStar Pro NZ:17) currently located in the equipment room of the existing security command center. This equipment includes the following:
a. Access Control Reader (NH IS:002 A2 D:1 :##) Hay Barn Vehicle Gate
b. Access Control Reader (NH IS:002 A2 D:2 :##) Hay Barn Pedestrian Gate
c. Access Control Reader (NH IS:002 A2 D:3 :##) American Trail Gate
d. CCTV camera for Hay Barn Vehicle Gate
e. CCTV camera for Hay Barn Pedestrian Gate
F16SOL10044 4 of 18
Sheet Number Description
f. CCTV camera for American Trail Gate
g. Input Point (NZ IS:002 A2 8:1: 1 PF) Hay Barn
h. Input Point (NZ IS:002 A2 8:1: 2 LB) Hay Barn
i. Input Point (NZ IS:002 A2 8:1: 3 TS) Hay Barn
j. Input Point (NZ IS:002 A2 8:1: 4 TS) Hay Barn
k. Input Point (NZ IS:002 A2 8:1: 5 CF) Hay Barn
l. Input Point (NZ IS:002 A2 8:2: 1 PF) American Trail
m. Input Point (NZ IS:002 A2 8:2: 2 LB) American Trail
n. Input Point (NZ IS:002 A2 8:2: 3 TS) American Trail
o. Input Point (NZ IS:002 A2 8:2: 4 TS) American Trail
p. Input Point (NZ IS:002 A2 8:2: 5 CF) American Trail
1 TY 002
Narrative only
Transitions Notes – Replace Note 8 in entirety as provided:
8. When all construction is completed and the new Security Command
Center is operational then the field hardware connections for the security equipment not located in the building will need to be connected to the new field panel (NZ:002) which is now located in the new Security Equipment Room. This equipment includes the following:
a. Access Control Reader (NH IS:002 A2 D:1 :##) Hay Barn Vehicle Gate
b. Access Control Reader (NH IS:002 A2 D:2 :##) Hay Barn Pedestrian Gate
c. Access Control Reader (NH IS:002 A2 D:3 :##) American Trail Gate
d. CCTV camera for Hay Barn Vehicle Gate
e. CCTV camera for Hay Barn Pedestrian Gate
f. CCTV camera for American Trail Gate
g. Input Point (NZ IS:002 A2 8:1: 1 PF) Hay Barn
h. Input Point (NZ IS:002 A2 8:1: 2 LB) Hay Barn
i. Input Point (NZ IS:002 A2 8:1: 3 TS) Hay Barn
j. Input Point (NZ IS:002 A2 8:1: 4 TS) Hay Barn
k. Input Point (NZ IS:002 A2 8:1: 5 CF) Hay Barn
l. Input Point (NZ IS:002 A2 8:2: 1 PF) American Trail
m. Input Point (NZ IS:002 A2 8:2: 2 LB) American Trail
n. Input Point (NZ IS:002 A2 8:2: 3 TS) American Trail
o. Input Point (NZ IS:002 A2 8:2: 4 TS) American Trail
p. Input Point (NZ IS:002 A2 8:2: 5 CF) American Trail
F16SOL10044 5 of 18
Sheet Number Description
1 TY 002
Narrative only
Transitions Notes – Add Note 9 as provided:
Prior to demo of any security equipment from the police station basement equipment room, security contractor must be ensure all active security devices are patched over via active fiber patches to the racks to be protected in place, to include but not limited to wall mounted fiber optic enclosures, cameras, alarm panels etc. Perform PVT and acceptance testing per
280500.10 requirements for the reconnected devices.
1 TY 002
Narrative only
Add Control Room Sequencing/Cut Over Notes:
1. Security Contractor must provide a complete sequencing-cut over plan to include but not limited to down times, schedules and device cut over, to be approved by OPS as part of their pre-project submittal package. Animal buildings will need to be coordinated with OPS and animal programs to minimize impact on animals.
2. New control room must be completed, fully operational and ready to be manned BEFORE anything from the existing control room is disconnected, relocated or moved.
3. Both control rooms will be required to be manned until existing control room has had all required items relocated, moved or disconnected and tested.
4. Security Contractor shall have new panels and electronic security devices fully programmed, ready to accept existing panels and electronic security devices before any existing items are disconnected or moved.
5. Contractor must move 1 item at a time, ensure that each item is programmed, fully functional and tested before moving to the next item. This must be coordinated with OPS to verify. If that cannot be accomplished, security contractor is responsible for paying overtime for Zoo police, or contract guard force to secure the area until area is fully functional.
End of Summary
F16SOL10044 6 of 18
JUNE 3, 2016
FINAL CONSTRUCTION DOCUMENTS-
Addendum, July 1, 2016
SMITHSONIAN FACILITIES
PROJECT #1633109
VOLUME 2 - RESTROOMS
HOT FLUID-APPLIED RUBBERIZED ASPHALT
WATERPROOFING
071413 - 1
SECTION 071413 - HOT FLUID-APPLIED RUBBERIZED ASPHALT WATERPROOFING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Rubberized-asphalt waterproofing membrane, reinforced at plaza deck above underground mechanical room.
B. Related Requirements:
1. Section 079200 "Joint Sealants" for joint sealants, joint fillers, and joint preparation.
2. Section 321400 "Unit Paving" for plaza-deck pavers set on setting beds.
1.3 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1. Review waterproofing requirements, including surface preparation, substrate condition and pretreatment, minimum curing period, forecasted weather conditions, special details and sheet flashings, installation procedures, testing and inspection procedures, and protection and repairs.
1.4 ACTION SUBMITTALS
A. Product Data: For each type of product. Include manufacturer's written instructions for evaluating, preparing, and treating substrate, technical data, and tested physical and performance properties of waterproofing.
B. Shop Drawings: Show locations and extent of waterproofing. Include details for substrate joints and cracks, sheet flashings, penetrations, inside and outside corners, tie-ins to adjoining waterproofing, and other termination conditions.
1. Include setting drawings showing layout, sizes, sections, profiles, and joint details of pedestal-supported concrete pavers.
1.5 INFORMATIONAL SUBMITTALS
A. Qualification Data: For Installer and testing agency.
F16SOL10044 7 of 18
Addendum, July 1, 2016
SMITHSONIAN FACILITIES
071413 - 2
B. Field quality-control reports.
C. Sample Warranties: For special warranties.
1.6 QUALITY ASSURANCE
A. Installer Qualifications: An authorized representative who is trained and approved by manufacturer.
B. Mockups: Install waterproofing to 100 sq. ft. (9.3 sq. m) of deck and wall to demonstrate surface preparation, crack and joint treatment, corner treatment, thickness, texture, and execution quality. Install pavers to demonstrate aesthetic effects, and set quality standards for materials and execution.
1. Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless Architect specifically approves such deviations in writing.
2. Subject to compliance with requirements, approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Store liquid materials in their original undamaged containers in a clean, dry, protected location and within the temperature range required by waterproofing manufacturer.
B. Remove and replace liquid materials that cannot be applied within their stated shelf life.
C. Protect stored materials from direct sunlight.
1.8 FIELD CONDITIONS
A. Weather Limitations: Apply waterproofing within the range of ambient and substrate temperatures recommended by waterproofing manufacturer. Do not apply waterproofing to a damp or wet substrate, or when temperature is below zero deg F (minus 18 deg C).
1. Do not apply waterproofing in snow, rain, fog, or mist.
B. Maintain adequate ventilation during application and curing of waterproofing materials.
1.9 WARRANTY
A. Special Warranty: Manufacturer agrees to repair or replace waterproofing and sheet flashings that do not comply with requirements or that fail to remain watertight within specified warranty period.
1. Warranty includes removing and reinstalling protection board, bituminous setting bed,and unit , pavers on plaza decks.
2. Warranty Period: 10 years from date of Substantial Completion.
F16SOL10044 8 of 18
Addendum, July 1, 2016
SMITHSONIAN FACILITIES
071413 - 3
B. Special Installer's Warranty: Contractor to provide 5-year labor and material warranty to cover all installer workmanship and materials along with the manufacturer’s warranty, excluding 3rd party damage and acts of god. Specified formsigned by Installer, covering Work of this Section, for warranty period of 5 years.
1. Warranty includes removing and reinstalling protection board, bituminous setting bed and unit pavers on plaza deck.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Source Limitations: Obtain waterproofing materials sheet flashings protection course from single source from single manufacturer.
2.2 WATERPROOFING MEMBRANE
A. Hot Fluid-Applied, Rubberized-Asphalt Waterproofing Membrane: Single component;
100 percent solids; hot fluid-applied, rubberized asphalt.
1. Products: Subject to compliance with requirements, provide one of the following:
a. Carlisle Coatings & Waterproofing Inc; CCW-500R.
b. Henry Company; 790-11.
c. Tremco Incorporated; Tremproof 150.
2.3 AUXILIARY MATERIALS
A. General: Auxiliary materials recommended by waterproofing manufacturer for intended use and compatible with waterproofing.
B. Primer: ASTM D 41/D 41M, asphaltic primer.
C. Elastomeric Sheet: 50-mil- (1.3-mm-) minimum, uncured sheet neoprene with manufacturer's recommended contact adhesives as follows:
1. Tensile Strength: 53 lb/in minimum; ASTM D 882.
2. Elongation: 350 percent minimum; ASTM D 882.
3. Permeance: 0.1 perms; ASTM E96 (B).
4. Pliability: Pass @ -25 degrees F, 1/4" mandrel.
5. Tear Resistance: 125 psi (860 kPa) minimum; ASTM D 624, Die C.
6. Brittleness: Does not break at minus 30 deg F (34 deg C); ASTM D 2137.
7. Puncture Resistance: 200 lbs.; ASTM E154.
D. Metal Termination Bars: Manufacturer's standard, predrilled stainless-steel or aluminum termination bars; approximately 1 by 1/8 inch (25 by 3 mm) thick; with stainless-steel anchors.
E. Sealants and Accessories: Manufacturer's recommended sealants and accessories.
F16SOL10044 9 of 18
Addendum, July 1, 2016
SMITHSONIAN FACILITIES
071413 - 4
F. Protection Course: Heavy-duty modified bitumen protection board consisting of a medium-weight fiberglass matt with a high quality SBS rubber and asphalt blend; Basis of Design is Carlisle CCW Protection Board-HS or equivelent. :
1. Thickness: 1/8 inch (6 mm), nominal.
G. Protection Course: Manufacturer's standard, 80- to 90-mil- (2.0- to 2.3-mm-) thick, fiberglass-reinforced rubberized asphalt or modified bituminous sheet.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.
1. Verify that concrete has cured and aged for minimum time period recommended by waterproofing manufacturer.
2. Verify that substrate is visibly dry and free of moisture. Test for capillary moisture by plastic sheet method according to ASTM D 4263.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Clean and prepare substrates according to manufacturer's written instructions. Provide clean, dust-free, and dry substrate for waterproofing application.
B. Mask off adjoining surfaces not receiving waterproofing to prevent spillage and overspray affecting other construction.
C. Close off deck drains and other deck penetrations to prevent spillage and migration of waterproofing fluids.
D. Remove grease, oil, form-release agents, paints, curing compounds, and other penetrating contaminants or film-forming coatings from concrete.
E. Remove fins, ridges, and other projections, and fill honeycomb, aggregate pockets, and other voids.
3.3 JOINTS, CRACKS, AND TERMINATIONS
A. Prepare and treat substrates to receive waterproofing membrane, including joints and cracks, deck drains, corners, and penetrations according to manufacturer's written instructions.
1. Rout and fill joints and cracks in substrate. Before filling, remove dust and dirt according to ASTM D 4258.
F16SOL10044 10 of 18
Addendum, July 1, 2016
SMITHSONIAN FACILITIES
071413 - 5
2. Adhere strip of elastomeric sheet to substrate in a layer of hot rubberized asphalt. Extend elastomeric sheet a minimum of 6 inches (150 mm) on each side of moving joints and cracks or joints and cracks exceeding 1/8 inch (3 mm) thick, and beyond deck drains and penetrations. Apply second layer of hot fluid-applied, rubberized asphalt over elastomeric sheet.
3. Embed strip of reinforcing fabric into a layer of hot rubberized asphalt. Extend reinforcing fabric a minimum of 6 inches (150 mm) on each side of nonmoving joints and cracks not exceeding 1/8 inch (3 mm) thick, and beyond roof drains and penetrations.
a. Apply second layer of hot fluid-applied, rubberized asphalt over reinforcing fabric.
B. At expansion joints and discontinuous deck-to-wall or deck-to-deck joints, bridge joints with elastomeric sheet extended a minimum of 6 inches (150 mm) on each side of joints and adhere to substrates in a layer of hot rubberized asphalt. Apply second layer of hot fluid-applied, rubberized asphalt over elastomeric sheet.
3.4 FLASHING INSTALLATION
A. Install elastomeric sheets at terminations of waterproofing membrane according to manufacturer's written instructions.
B. Prime substrate with asphalt primer.
C. Install elastomeric sheet and adhere to deck and wall substrates in a layer of hot rubberized asphalt.
D. Extend elastomeric sheet up walls or parapets a minimum of 8 inches (200 mm) above plaza-deck pavers and 6 inches (150 mm) onto deck to be waterproofed.
E. Install termination bars and mechanically fasten to top of elastomeric flashing sheet at terminations and perimeter of waterproofing.
3.5 MEMBRANE APPLICATION
A. Apply primer, at manufacturer's recommended rate, over prepared substrate and allow it to dry.
B. Heat and apply rubberized asphalt according to manufacturer's written instructions.
1. Heat rubberized asphalt in an oil- or air-jacketed melter with mechanical agitator specifically designed for heating rubberized asphalt.
C. Start application with manufacturer's authorized representative present.
D. Reinforced Membrane: Apply hot rubberized asphalt to substrates and adjoining surfaces indicated. Spread to a thickness of 90 mils (2.3 mm); embed reinforcing fabric, overlapping sheets 2 inches (50 mm); spread another 125-mil- (3.2-mm-) thick layer to provide a uniform, reinforced, seamless membrane 215 mils (5.5 mm) thick.
F16SOL10044 11 of 18
Addendum, July 1, 2016
SMITHSONIAN FACILITIES
071413 - 6
E. Apply waterproofing over prepared joints and up wall terminations and vertical surfaces to heights indicated or required by manufacturer.
F. Cover waterproofing with protection course with overlapped joints before membrane is subject to construction or vehicular traffic.
3.6 FIELD QUALITY CONTROL
A. Engage a full-time site representative qualified by waterproofing membrane manufacturer to inspect substrate conditions; surface preparation; and application of membrane, flashings, protection, and drainage components; furnish daily reports to Architect.
1. Site representative shall measure membrane thickness with pin tester or other suitable device at least once for every 100 sq. ft. (10 sq. m) and include measurements in reports.
B. Testing Agency: Engage a qualified testing agency to inspect substrate conditions, surface preparation, waterproofing application, protection, and drainage components, and to furnish reports to Architect.
1. Flood Testing: Flood test each deck area for leaks, according to recommendations in ASTM D 5957, after completing and protecting waterproofing but before overlaying construction is placed. Install temporary containment assemblies, plug or dam drains, and flood with potable water.
Testing agency shall observe flood testing.
a. Flood to an average depth of 2-1/2 inches (65 mm) with a minimum depth of 1 inch (25 mm) and not exceeding a depth of 4 inches (100 mm).
Maintain 2 inches (50 mm) of clearance from top of sheet flashings.
b. Flood each area for 24 hours.
c. After flood testing, repair leaks, repeat flood tests, and make further repairs until waterproofing installation is watertight.
3.7 CLEANING AND PROTECTION
A. Protect waterproofing from damage and wear during remainder of construction period.
B. Clean spillage and soiling from adjacent construction using cleaning agents and procedures recommended by manufacturer of affected construction.
END OF SECTION 071413
F16SOL10044 12 of 18
UPPER FLOOR
68' - 0"
21A
F2A
F5
GALVANIZED STL BENT
PLATE - CONTINUOUS
2 1/2"6"8"
COPPER FLASHING
WITH HEMMED EDGE
- CONT CLEAT
ALUMINUM CURTAIN
WALL SYSTEM
2"
11"
FIBERGLASS
THERMAL ISOLATOR
DECORATIVE COPPER
TRIM - CONTINUOUSLY
CLEATED BOTH ENDS
ELECTRIC
PERIMETER HEATER -
PEDESTAL MOUNT
/2
FRT WD BLOCKING - TYP
CONT SEALANT
CONT SEALANT - TYP
CONT 1/4"
SEALANT
FLEXIBLE FLASHING - LAP
OVER AIR BARRIER 4" MIN
5" 7"
AIR BARRIER
CONT CLEAT
A-503
A10
ROOF BEARING
79' - 0"
AIR CURTAIN -
WALL MOUNTED
TO STL ANGLE
STL ANGLE -
INTERMITTENT -
PAINTED - ANCHOR
TO STL BEAM
STL BEAM -
PAINTED
ALIGN
SPRINKLER PIPE
CURTAINWALL
MULLION CAP
EXTENSION - WHERE
OCCURS - SEE
WINDOW SCHEDULE2
1/ 2"
ALUM ENTRANCE
EXIT SIGN - FASTEN
TO UNDERSIDE STL
BEAM - ROUTE
CONDUIT ABOVE
BEAM FLANGE
LIGHT SCONCE ON
1/2" PT WD BLOCKING
- PAINTED BLACK
E Q
E Q
1/
2"
6" X 6" METAL
TRANSOM CLOSURE
BY CURTAINWALL
MANUFACTURER -
FILL CAVITY WITH
MINERAL WOOL
INSULATION
ADA OPERATOR
(WHERE OCCURS)
DASHED
6"
CLIP BY
CURTAINWALL
MANUFACTURER
ROOF BEARING
79' - 0"
INSULATED
SPANDREL PANEL
8" 6"
ALUM BACKPAN -
VENTED - PAINTED
1/ 2"
T Y
P
1/ 2"
T Y
P
ALUM CURTAIN
WALL SYSTEM
CLIP BY
CURTAINWALL
MANUF
UPPER FLOOR
68' - 0"
F2B F2A
12A
CURB
6" 8"
2"
F5
ALIGN
WALK-OFF MAT ON
SOLID SUBSTRATE OF
MULTIPLE FRT MARINE
GRADE PLYWOOD
LAYERS
ALUM ENTRANCE
THERMALLY BROKEN
ALUM THRESHOLD WITH
EXTENSION SET IN A
BED OF SEALANT
TPO MEMBRANE -
LAP OVER
CONCRETE CURB
SST 2"X2" ANGLE
AROUND ENTIRE
PERIMETER OF
WALK-OFF MAT-
FASTEN TO
CONCRETE
UPPER FLOOR
68' - 0"
6" 8"
STL PLATE - GALV
- PAINTED - SEE
STRUCTURAL
3/4" CORK
EXPANSION JOINT
CONT SECONDARY
WEATHER SEAL
ELECTRIC
PERIMETER HEATER
ON PEDESTAL - SEE
MECH
ALUMINUM
CURTAINWALL SYSTEM
- ANCHOR TO STL
PLATE
F5F2B
2"
COPPER FLASHING
WITH HEMMED EDGE -
CONTINUOUS CLEAT
AT EXTERIOR SIDE
FLASHING - LAP
OVER CONCRETE
CURB
CONT PRIMARY
SEALANT AND BACKER
ROD - ENTIRE
PERIMETER - TYP
INTERIOR AIR SEALANT
AND BACK ROD - ENTIRE
PERIMETER - TYP
SEALANT
6"
2"
MEMBRANE 1
UPPER FLOOR
68' - 0"
A
CAVITY DRAINAGE
MESH
WEEP VENT AT 24"
O.C. MAX
GROUT SOLID
23A
21B
22A
8" M
IN
8"
M
IN
AIR BARRIER
FLEXIBLE FLASHING
- LAP OVER COPPER
FLASHING 4" MIN
THRU WALL COPPER
FLASHING WITH
HEMMED EDGE - SEAL
TO STONE
GRADE - VARIES -
SEE CIVIL DWGS
7"
SELF ADHERED
WATERPROOFING
SYSTEM (WITH
DRAINAGE BOARD)
LAP OVER FLEXIBLE
FLASHING 4" MIN
2"
LOWER FLOOR
57' - 0"
25C
SLAB INSULATION -
EXTEND 24" AT
PERIMETER - TYP
DRAINAGE BOARD
ON SELF ADHERED
WATERPROOFING
SYSTEM
COARSE GRAVEL
FILTER FABRIC
F1
FOUNDATION
DRAIN 2'
M
IN
LOWER FLOOR
57' - 0"
C
F1
5" 2 1/2"
5"
PAVERS - SEE
LANDSCAPE DRAWINGS -
SLOPE AWAY FROM
BUILDING
EXPANSION JOINT - SEE
LANDSCAPE DRAWINGS
STONE BASE IN EPOXY
MORTAR SETTING BED
ALUMINUM THRU WALL
FLASHING WITH
HEMMED EDGE BY
METAL PANEL
MANUFACTURER
METAL PANEL WEEP
SELF ADHERED
WATERPROOFING
SYSTEM
1/2" BACKER ROD AND
SEALANT
SEALANT
FLEXIBLE FLASHING -
LAP OVER ALUMINUM
THRU WALL FLASHING 4"
MIN
AIR BARRIER - LAP OVER
FLEXIBLE FLASHING 4"
MIN
FLEXIBLE FLASHING - LAP
OVER SELF ADHERED
WATERPROOFING 4" MIN
UPPER FLOOR
68' - 0"
GALVANIZED STL BENT PLATE -
CONTINUOUS
2 1/2"6"
COPPER FLASHING WITH HEMMED
EDGE - CONT CLEAT - EXTEND TO
PRIMARY SEALANT
ALUMINUM CURTAIN
WALL SYSTEM
DECORATIVE COPPER TRIM -
CONTINUOUS CLEAT
1/
2"
FRT WD BLOCKING - TYP
CONT SEALANT
CONT SECONDARY WEATHER
SEAL
FLEXIBLE FLASHING - LAP
OVER AIR BARRIER 4" MIN
1/2" GAP MAX
CONT PRIMARY SEALANT
AND BACKER ROD - ENTIRE
PERIMETER - TYP
FIBERGLASS THERMAL
ISOLATOR - SEE STRUCTURAL
DRAWINGS
AIR BARRIER
1/ 2"
2" 2"
INTERIOR AIR SEALANT AND BACKER
ROD - ENTIRE PERIMETER - TYP
5 1/2" WIDE T&G
WD DECKING
EXTERIOR INTERIOR
T Y
P
1/
2"
CURTAINWALL
SYSTEM
GLULAM TRUSS
5 1/4" WIDE
WOOD CEILING
1/4" GAP - TYP
T Y
P 1/
8"
T Y
P 1/
8"
1/
4" T
Y P
VARIES
1" 3"
RECESS LIGHT FIXTURE
IN 3-3/8" PAVER FLANGE
BY LIGHT FIXTURE
MANUF- ADJUST O-RING
GASKETING TO MAINTAIN
WATERPROOFING - CORE
INTO CENTER OF PAVER
8" X 8" X 2" DEEP
SQUARE PAVER - SEE
LANDSCAPE DRAWINGS
MK2 MOUNTING PLATE
SYSTEM BY LIGHT
FIXTURE
MANUFACTURER
MEMBRANE WITH
PROTECTION BOARD
CONCRETE SLAB
LIGHT FIXTURE BACK
BOX
8" x 8" SQUARE PAVERS
11 1/2"4 1/2"
BITUMINOUS SETTING
BED
REBAR TO ADJUST
HEIGHT OF BACK BOX
HEXAGONAL PAVER -
SEE LANDSCAPE
DRAWINGS
1/2" SEALANT
7 1/2"
FLASHING - WRAP
BLOCKING AND SLAB
DEPRESSION AT
BACK BOX
5/ 8"
3/
8"
PT WD BLOCKING TO
RETAIN SETTING BED
SEALANT AT CONDUIT
PENETRATION
1"=1"
1" 2"
1/4"=1'-0"
2' 4' 8'
1/8"=1'-0"
4' 8' 16'
1/16"=1'-0"
8' 16' 32'
TRUE NORTH
1"=50'-0"
50' 100'
Smithsonian Facilities 600 Maryland Avenue S.W. Suite 5001
Washington, DC 20024-2520
Smithsonian Institution
KEY PLAN
GRAPHIC SCALE(S)
A
1 2 3 4 5 6 7 8 9 10 11 12
B
C
D
E
F
G
H
J
K
L
M
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
L
M
SHEET NO.
OF
PROJECT TITLE
A/E PROJECT NUMBER
ADDRESS
BUILDING NAME
PROJECT NUMBER
DRAWING TITLE
DRAWING TYPE
WORKING STAFF
STAMP
DATE
REVISION # DATE
SUBMISSION
REVISION DESCRIPTION
PROJECT NORTH
FOR
CONSTRUCTION
TYPE
DRAWN BY
SEQUENCEDISCIPLINE
CHECKED BYDESIGNED BY
:1 :4
A M
RENEW POLICE STATION,
REPLACE PUBLIC RESTROOMS
AND PAVILION, AND
ELECTRICAL SUBSTATION
RESTROOMS - EXTERIOR SECTION
DETAILS
21445
ARCHITECTURAL
232 319
RENEW POLICE STATION, REPLACE
PUBLIC RESTROOMS AND PAVILION,
AND ELECTRICAL SUBSTATION
06/03/16 FINAL CONSTRUCTION DOCUMENTS
A
B Y
A p p ro ve r
F
IN
A L C O N S
TR
U C
TI
O N
D O C U M E N
TS
NZP
3001 Connecticut Avenue, NW Washington, DC 20008
NZP
1633109
CHO BENN HOLBACK + ASSOCIATES
100 N. CHARLES ST, BALITMORE, MD 21201
CBH
2A
CBHCBH
5 03
SCALE = 1 1/2" = 1'-0"A-311 A-503
E10 DETAIL - SECTION
SCALE = 1 1/2" = 1'-0"A-103 A-503
J7 DETAIL - SECTION - DOOR HEAD
SCALE = 1 1/2" = 1'-0"A-311 A-503
J10 DETAIL - SECTION - SPANDREL
SCALE = 1 1/2" = 1'-0"A-211 A-503
E7 DETAIL - SECTION - ENTRANCE
SCALE = 3" = 1'-0"A-102 A-503
E4 DETAIL - CW SILL 2
SCALE = 1 1/2" = 1'-0"A-311 A-503
E1 DETAIL - SECTION - THRU WALL
SCALE = 1 1/2" = 1'-0"A-311 A-503
A1 DETAIL - SECTION - FOOTING
SCALE = 3" = 1'-0"A-311 A-503
A7 DETAIL - SECTION - METAL PANEL
3" = 1'-0"A-503
A10 DETAIL - SECTION
1 1/2" = 1'-0"A-503
J4 DETAIL - RCP
1 06/24/16 Addendum 2 07/01/16 Addendum
3" = 1'-0"A-503
J1 DETAIL - SECTION
F16SOL10044 13 of 18 cbrady CBHA - Holback rev2
CONTINUED FROM
SHEET 1E-002
CONTINUED FROM
SHEET 1E-002
CONTINUED FROM
SHEET 1E-002
CONTINUED FROM
SHEET 1E-002
DOWN CONDUCTORS SHALL BE #
1/0 BARE COPPER, STRANDED,
ROUTED IN 1"C DOWN EXTERIOR
OF BUILDING (TYP OF 4)
AIR TERMINAL - COORDINATE
ROUTING OF LIGHTNING
PROTECTION CONDUCTORS
WITH ARCHITECT (TYP)
LIGHTNING PROTECTION NOTES
A. PROVIDE LIGHTNING PROTECTION SYSTEM IN ACCORDANCE WITH NFPA 780, AND UL 96 STANDARDS. THE MASTER LABEL SHALL BE FURNISHED
TO THE OWNER UPON COMPLETION.
B. COPPER LIGHTNING PROTECTION SYSTEM COMPONENTS SHALL NOT BE MOUNTED TO ALUMINUM SURFACES. ALUMINUM COMPONENTS SHALL BE
USED TO AVOID ELECTROLYTIC CORROSION.
C. AIR TERMINALS SHALL BE PLACED 20'-0" MAXIMUM SPACING AROUND THE ROOF PERIMETER OR ALONG ROOF RIDGES AND WITHIN 2'-0" OF
OUTSIDE CORNER EDGE.
D. NOTES AS WRITTEN HEREIN FOR THESE SYSTEMS ARE SCHEMATIC & ARE INTENDED TO INDICATE BASIC SYSTEM DESIGN. CONTRACTOR SHALL VERIFY DIMENSIONS & SITE CONDITIONS & PROVIDE SYSTEM COMPLYING WITH CODE REQUIREMENTS.
E. CONDUCTORS SHALL MAINTAIN A HORIZONTAL OR DOWNWARD COURSE, FREE FROM "U" OR "V" (DOWN AND UP) POCKETS.
F. NO BEND OF A CONDUCTOR SHALL FORM AN ANGLE OF LESS THAN 90° NOR SHALL HAVE A RADIUS OF BEND LESS THAN 8 INCHES.
G. JOB SITE CONDITIONS MAY REQUIRE ALTERATIONS IN AIR TERMINAL, DOWN CONDUCTORS, AND GROUND ROD LOCATIONS.
H. ALL LIGHTNING PROTECTION CONDUCTORS SHALL BE FASTENED HORIZONTALLY AND VERTICALLY NOT MORE THAN 3'-0" O.C. MAXIMUM SPACING.
COORDINATE FASTENING OF CONDUCTORS WITH ROOFING CONTRACTOR.
I. METALLIC BODIES OF INDUCTANCE SITUATED WITHIN 6'-0" OF LIGHTNING CONDUCTOR OR ANOTHER BONDED METAL BODY SHALL BE
INTERCONNECTED TO THE LIGHTNING CONDUCTOR SYSTEM, UNLESS INHERENTLY GROUNDED (I.E. ROOF DRAINS, SMALL ROOF VENTS, FLASHING, ETC.).
J. BOND TO ALL METAL BODIES OF CONDUCTANCE WITHIN 6'-0" OF THE MAIN LIGHTNING CONDUCTOR SUCH AS EXHAUST FANS, LARGE ROOF VENTS, HVAC UNITS, LADDERS, RAILING, ANTENNAS, METAL STACKS AND ANY OTHER LARGE METAL BODY WHOSE HEIGHT EXCEEDS THAT OF THE AIR
TERMINAL IN USE, UNLESS PROTECTED BY HIGHER ROOF ELEVATIONS.
K. CONNECTIONS TO GROUND ROD SHALL BE MADE AT A POINT NOT LESS THAN 1'-0" BELOW FINISHED GRADE AND 2'-0" AWAY FROM FOUNDATION
WALL.
L. BOND TO DOMESTIC & FIRE WATER LINES.
M. DOWN CONDUCTORS SHALL BE #1/0 BARE COPPER, STRANDED, ROUTED IN 1"C DOWN EXTERIOR OF BUILDING.
N. ADDITIONAL LIGHTNING PROTECTION DETAILS WILL BE PROVIDED WITH FORTHCOMING ADDENDUM.
2" WIDE COPPER STRAP
COPPER CONDUCTOR (CONNECT TO
BUILDING GROUNDING BAR)
ALUMINUM BASE
PRESSURE-TYPE CABLE CONNECTOR
LIGHTNING PROTECTION CONDUCTOR
1/2" X1/2" ALUMINUM
AIR TERMINAL
NOTE: ADHESIVE COMPOUND SHALL BE
PROVIDED BY OTHERS - ELECTRICAL
CONTRACTOR SHALL COORDINATE. THE
ADHESIVE COMPOUND SHALL BE
COMPATIBLE WITH THE ROOFING SYSTEM.
SYMBOL:
M
BONDING PLATE
LIGHTNING
PROTECTION
CONDUCTOR
CABLE CONNECTOR
LIGHTNING PROTECTION
CONDUCTOR
LIGHTNING PROTECTION
CONDUCTOR
LIGHTNING PROTECTION
CONDUCTOR
CROSSOVER CABLE
CONNECTOR
1/8"=1'-0"
4' 8' 16' pãáíÜëçåá~å=c~ÅáäáíáÉë SMM=j~êóä~åÇ=^îÉåìÉ=pKtK=pìáíÉ=RMMN t~ëÜáåÖíçåI=a`=OMMOQJOROM pãáíÜëçåá~å fåëíáíìíáçå
KEY PLAN
GRAPHIC SCALE(S)
A
1 2 3 4 5 6 7 8 9 10 11 12
B
C
D
E
F
G
H
J
K
L
M
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
L
M
SHEET NO.
OF
PROJECT TITLE
A/E PROJECT NUMBER
ADDRESS
BUILDING NAME
OFEO PROJECT NUMBER
DRAWING TITLE
DRAWING TYPE
WORKING STAFF
STAMP
DATE
REVISION # DATE
SUBMISSION
REVISION DESCRIPTION
clo `lkpqor`qflk
TYPE
DRAWN BY
SEQUENCEDISCIPLINE
CHECKED BYDESIGNED BY
:3 :5
P M obkbt=mlif`b=pq^qflkI obmi^`b=mr_if`=obpqolljp
^ka=m^sfiflkI=^ka=bib`qof`^i pr_pq^qflk
POLICE
LIGHTNING PROTECTION PLAN
21445
ELECTRICAL
129 319
RENEW POLICE STATION, REPLACE
PUBLIC RESTROOMS AND PAVILION,
AND ELECTRICAL SUBSTATION
05/27/16 FINAL CONSTRUCTION DOCUMENTS
E
B Y
A p p ro v e r
F
IN
A L
C O N S T R U C T
IO
N
D O C U M E N T S
NZP
3001 Connecticut Avenue, NW Washington, DC kwm
1633109
CHO BENN HOLBACK + ASSOCIATES
100N. CHARLES ST, BALTIMORE, MD 21201
MUELLER ASSOCIATES
1306 CONCOURSE DRIVE,
SUITE 100
LINTHICUM, MD 21090
DMvB
1E
KHRDMvB
3 01
1/8" = 1'-0"1E-301
1 ROOF PLAN - LIGHTNING PROTECTION
1/8" = 1'-0"1E-301
2 DETAIL - WATER LINE BONDING STRAP
1/8" = 1'-0"1E-301
3 DETAIL - AIR TERMINAL BASE
1/8" = 1'-0"1E-301
4 DETAIL - BONDING PLATE
1/8" = 1'-0"1E-301
5 DETAIL - CABLE CONNECTION
1/8" = 1'-0"1E-301
6 DETAIL - CROSSOVER CABLE CONNECTOR
1 06/24/16 Addendum
2 07/01/16 Addendum
STAMP
CHO BENN HOLBACK + ASSOCIATES
100N. CHARLES ST, BALTIMORE, MD 21201
MUELLER ASSOCIATES
1306 CONCOURSE DRIVE,
SUITE 100
LINTHICUM, MD 21090
F16SOL10044 14 of 18 pãáíÜëçåá~å=c~ÅáäáíáÉë SMM=j~êóä~åÇ=^îÉåìÉ=pKtK=pìáíÉ=RMMN t~ëÜáåÖíçåI=a`=OMMOQJOROM pãáíÜëçåá~å fåëíáíìíáçå
GRAPHIC SCALE(S)
A
1 2 3 4 5 6 7 8 9 10 11 12
B
C
D
E
F
G
H
J
K
L
M
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
L
M
SHEET NO.
OF
PROJECT TITLE
A/E PROJECT NUMBER
ADDRESS
BUILDING NAME
OFEO PROJECT NUMBER
DRAWING TITLE
DRAWING TYPE
WORKING STAFF
STAMP
DATE
REVISION # DATE
SUBMISSION
REVISION DESCRIPTION
clo `lkpqor`qflk
TYPE
DRAWN BY
SEQUENCEDISCIPLINE
CHECKED BYDESIGNED BY
:3 :5
P M obkbt=mlif`b=pq^qflkI obmi^`b=mr_if`=obpqolljp
^ka=m^sfiflkI=^ka=bib`qof`^i pr_pq^qflk
POLICE
PANELBOARD SCHEDULES
21445
ELECTRICAL
133 319
RENEW POLICE STATION, REPLACE
PUBLIC RESTROOMS AND PAVILION,
AND ELECTRICAL SUBSTATION
06/03/16 FINAL CONSTRUCTION DOCUMENTS
E
B Y
A p p ro v e r
F
IN
A L
C O N S T R U C T
IO
N
D O C U M E N T S
NZP
3001 Connecticut Avenue, NW Washington, DC kwm
1633109
CHO BENN HOLBACK + ASSOCIATES
100N. CHARLES ST, BALTIMORE, MD 21201
MUELLER ASSOCIATES
1306 CONCOURSE DRIVE,
SUITE 100
LINTHICUM, MD 21090
DMvB
1E
KHRDMvB
8 03
TOTAL DEMAND: 225.5 kVA 271.2 A
TOTAL CONNECTED: 262.9 kVA 316.2 A
TOTAL: PHASE A: 87.3 PHASE B: 84.5 PHASE C: 88.5
53 8.0 15.8 54
51 8.0 15.1 52
DWH-1 - MECHANICAL 107 3 45
8.0 14.7
90 3 PANEL RP1SB (VIA XFMR TP1SB)
47 0.9 27.8 48
45 0.9 24.0 46
P-HHW-2 - MECHANICAL 107 3 15
0.9 26.9
150 3 PANEL RP1SA (VIA XFMR TP1SA)
41 0.9 0.0 -- -- SPACE 42
39 0.9 0.0 -- -- SPACE 40
P-HHW-1 - MECHANICAL 107 3 15
0.9 0.0 -- -- SPACE 38
35 0.6 0.3 36
33 0.6 0.3 34
AC-2 - SEC/DATA EQUIP 109 3 20
0.6 0.3
15 3 F-EF-2 - VEHICLE STORAGE 132
29 3.7 0.9 30
27 3.7 0.9 28
AC-1 - SEC/DATA EQUIP 109 3 20
3.7 0.9
15 3 F-EF-1 - MECHANICAL 107
23 0.3 18.6 24
21 0.3 18.6 22
CONDENSATE RETURN UNIT - MECHANICAL 107 3 15
0.3 18.6
90 3 ACCU-AHU-1 - MECHANICAL 107
17 SPARE 1 20 0.0 2.0 18
15 SPARE 1 20 0.0 2.0 16
13 SPARE 1 20 0.0 2.0
15 3 ACCU-2 - MECHANICAL 107
11 SPARE 1 20 0.0 2.0 12
9 SPARE 1 20 0.0 2.0 10
7 SPARE 1 20 0.0 2.0
15 3 ACCU-1 - MECHANICAL 107
5 LIGHTING - UPPER FLOOR NORTH 1 20 1.3 5.6 6
3 LIGHTING - UPPER FLOOR SOUTH 1 20 1.7 5.6 4
1 LIGHTING - LOWER LEVEL 1 20 2.0 5.6
40 3 F-SA-1 - MECHANICAL 107
# P TA A B C A B C TA P #
CKT ITEM SERVED ITEM SERVED CKT
CB LOAD (kVA) CB
LOCATION: MECHANICAL 107 NOTES:
ENCLOSURE: NEMA 1 MOUNTING: SURFACE FED FROM: ATS2
MIN AIC: 35,000 VOLTS: 480Y/277V PHASES: 3 WIRES: 4
PANELBOARD: HP1S BUS RATING: 400 A MAIN: 400A MCB
TOTAL DEMAND: 66.2 kVA 183.7 A
TOTAL CONNECTED: 81.3 kVA 225.6 A
TOTAL: PHASE A: 27.9 PHASE B: 25.0 PHASE C: 28.4
65 1.0 0.0 66
LION/TIGER KIOSK 2 20
1.0 0.0 64
61 SPACE -- -- 0.0 0.0
30 3 SURGE PROTECTIVE DEVICE
59 SPARE 1 20 0.0 9.6 60
57 SPARE 1 20 0.0 9.9 58
55 SPARE 1 20 0.0 9.7
100 3 PANEL RP2S
53 GENERATOR LIGHTS 1 20 0.4 0.0 -- -- SPACE 54
51 GENERATOR RECEPTACLES 1 20 0.4 0.0 -- -- SPACE 52
49 GENERATOR ALTERNATOR HEATER 1 20 0.4 2.6 50
47 GENERATOR BATTERY CHARGER 1 20 0.4 2.6
45 2 ACCU-4
45 GENERATOR JACKET WATER HEATER 1 20 0.4 2.6 46
43 EXTERIOR RECEPT 1 20 0.5 2.6
45 2 ACCU-3
41 ELEVATOR CAB LIGHTS 1 20 0.4 3.8 42
39 POWER - BREAK ROOM 101 1 20 0.8 3.8
50 2 EUH-2 - VEHICLE STORAGE 132
37 MICROWAVE - BREAK ROOM 101 1 20 0.5 3.8 38
35 VENDING - BREAK ROOM 101 1 20 1.2 3.8
50 2 EUH-1 - VEHICLE STORAGE 132
33 VENDING - BREAK ROOM 101 1 20 0.2 0.1 34
31 REFRIGERATOR - BREAK ROOM 101 1 20 1.0 0.1
15 2 AC-3 - OCIO CLOSET 110
29 RECEPT - BREAK ROOM 101 1 20 0.5 0.1 30
27 RECEPT - OFFICER WORKSTATIONS 102 1 20 1.4 0.1
15 2 AC-4 - ELEVATOR MACHINE ROOM 116
25 HAND DRYER - TOILET 108B 1 20 1.4 0.5 20 1 ATC PANEL - MECHANICAL 107 26
23 RECEPT - LOCKER ROOMS, TOILET 1 20 1.1 0.8 20 1 P-PHC-1 - MECHANICAL 107 24
21 RECEPT - ARMORY 114, EVIDENCE 115 1 20 0.5 0.5 20 1 AHU-1 LTS & RECEPTS - MECHANICAL 107 22
19 RECEPT - MECHANICAL 107 1 20 0.5 0.5 20 1 IRRIGATION SYSTEM CONTROLLER 20
17 COUNTER RECEPT - CONTROL ROOM 108 1 20 0.4 0.0 20 1 PUH-1 18
15 COUNTER RECEPT - CONTROL ROOM 108 1 20 0.5 0.8 20 1 P-ELEV-1 16
13 REFRIGERATOR - CONTROL ROOM 108 1 20 1.3 0.8 20 1 P-DWHR-1 14
11 RECEPT - CORRIDORS 1 20 0.9 0.5 20 1 TRAP PRIMING PANEL - MECHANICAL 107 12
9 CORD REELS - VEHICLE STORAGE 132 1 20 0.9 0.0 20 1 CUH-5 - STAIRS 130A 10
7 CORD REELS - VEHICLE STORAGE 132 1 20 0.5 0.0 20 1 CUH-4 - OPS CORRIDOR 100 8
5 RECEPT - VEHICLE STORAGE 132 1 20 1.1 0.0 20 1 CUH-2 - VESTIBULE 130 6
3 RECEPT - VEHICLE STORAGE 132 1 20 1.1 0.0 20 1 CUH-3 - VESTIBULE 230 4
1 RECEPT - VEHICLE STORAGE 132 1 20 1.1 0.0 20 1 CUH-1 - MECH VESTIBULE 107B 2
# P TA A B C A B C TA P #
CKT ITEM SERVED ITEM SERVED CKT
CB LOAD (kVA) CB
LOCATION: MECHANICAL 107 NOTES: PROVIDE INTEGRAL SURGE PROTECTIVE DEVICE
ENCLOSURE: NEMA 1 MOUNTING: SURFACE FED FROM: TP1SA
MIN AIC: 10,000 VOLTS: 208Y/120V PHASES: 3 WIRES: 4
PANELBOARD: RP1SA BUS RATING: 225 A MAIN: 225A MCB
TOTAL DEMAND: 28.3 kVA 78.5 A
TOTAL CONNECTED: 45.6 kVA 126.5 A
TOTAL: PHASE A: 14.7 PHASE B: 15.1 PHASE C: 15.8
65 0.0 1.5 30 1 EQUIP RACK - SEC DATA / EQUIP 109 66
63 0.0 1.5 30 1 EQUIP RACK - SEC DATA / EQUIP 109 64
SURGE PROTECTIVE DEVICE 3 30
0.0 1.5 30 1 EQUIP RACK - SEC DATA / EQUIP 109 62
59 SPACE -- -- 0.0 1.5 30 1 EQUIP RACK - SEC DATA / EQUIP 109 60
57 SPACE -- -- 0.0 1.5 30 1 EQUIP RACK - SEC DATA / EQUIP 109 58
55 SPACE -- -- 0.0 1.5 30 1 EQUIP RACK - SEC DATA / EQUIP 109 56
53 1.1 1.5 30 1 EQUIP RACK - SEC DATA / EQUIP 109 54
L6-30R RECEPT - OCIO CLOSET 110 2 30
1.1 1.5 30 1 EQUIP RACK - SEC DATA / EQUIP 109 52
49 1.1 1.5 30 1 EQUIP RACK - SEC DATA / EQUIP 109 50
L6-30R RECEPT - OCIO CLOSET 110 2 30
1.1 1.5 30 1 EQUIP RACK - SEC DATA / EQUIP 109 48
45 0.8 1.5 30 1 EQUIP RACK - SEC DATA / EQUIP 109 46
L6-20R RECEPT - OCIO CLOSET 110 2 20
0.8 1.5 30 1 EQUIP RACK - SEC DATA / EQUIP 109 44
41 0.8 1.5 30 1 EQUIP RACK - SEC DATA / EQUIP 109 42
L6-20R RECEPT - OCIO CLOSET 110 2 20
0.8 1.5 30 1 EQUIP RACK - SEC DATA / EQUIP 109 40
37 0.8 0.5 20 1 RECEPT - SEC DATA / EQUIP 109 38
L6-20R RECEPT - OCIO CLOSET 110 2 20
0.8 0.5 20 1 RECEPT - SEC DATA / EQUIP 109 36
33 0.8 0.4 20 1 RECEPT - SEC DATA / EQUIP 109 34
L6-20R RECEPT - OCIO CLOSET 110 2 20
0.8 0.5 20 1 ACCESS CONTROL PANEL - SEC DATA / EQUIP 109 32
29 SPARE 1 20 0.0 0.0 20 1 SPARE 30
27 SPARE 1 20 0.0 0.0 20 1 SPARE 28
25 SPARE 1 20 0.0 0.0 20 1 SPARE 26
23 SPARE 1 20 0.0 0.0 20 1 SPARE 24
21 SPARE 1 20 0.0 0.0 20 1 SPARE 22
19 SPARE 1 20 0.0 0.5 20 1 GENERATOR STATUS PANEL - CONTROL ROOM 108 20
17 QUAD RECEPT - OCIO CLOSET 110 1 20 0.4 0.8 20 1 CONSOLE RECEPT - CONTROL ROOM 108 18
15 QUAD RECEPT - OCIO CLOSET 110 1 20 0.4 0.8 20 1 CONSOLE RECEPT - CONTROL ROOM 108 16
13 RECEPT - OCIO CLOSET 110 1 20 0.5 0.5 20 1 RECEPT - CONTROL ROOM 108 14
11 EQUIP RACK - OCIO CLOSET 110 1 20 1.0 0.5 20 1 RECEPT - CONTROL ROOM 108 12
9 EQUIP RACK - OCIO CLOSET 110 1 20 1.0 0.4 20 1 RECEPT - CONTROL ROOM 108 10
7 EQUIP RACK - OCIO CLOSET 110 1 20 1.0 0.4 20 1 RECEPT - CONTROL ROOM 108 8
5 EQUIP RACK - OCIO CLOSET 110 1 20 1.0 0.4 20 1 RECEPT - CONTROL ROOM 108 6
3 EQUIP RACK - OCIO CLOSET 110 1 20 1.0 0.4 20 1 RECEPT - CONTROL ROOM 108 4
1 EQUIP RACK - OCIO CLOSET 110 1 20 1.0 0.4 20 1 RECEPT - CONTROL ROOM 108 2
# P TA A B C A B C TA P #
CKT ITEM SERVED ITEM SERVED CKT
CB LOAD (kVA) CB
LOCATION: SEC DATA / EQUIP 109 NOTES: PROVIDE 200% NEUTRAL BUS AND INTEGRAL SURGE PROTECTIVE DEVICE IN SINGLE ENCLOSURE
ENCLOSURE: NEMA 1 MOUNTING: SURFACE FED FROM: TP1SB
MIN AIC: 10,000 VOLTS: 208Y/120V PHASES: 3 WIRES: 4
PANELBOARD: RP1SB BUS RATING: 225 A MAIN: 150A MCB
TOTAL DEMAND: 21.7 kVA 60.3 A
TOTAL CONNECTED: 29.2 kVA 81.1 A
TOTAL: PHASE A: 9.7 PHASE B: 9.9 PHASE C: 9.6
53 SPARE 1 20 0.0 0.0 54
51 SPARE 1 20 0.0 0.0 52
49 SPARE 1 20 0.0 0.0
30 3 SURGE PROTECTIVE DEVICE
47 HAND DRYER - TOILET 214 1 20 1.4 0.0 20 1 SPARE 48
45 HAND DRYER - TOILET 213 1 20 1.4 0.0 20 1 SPARE 46
43 TELEVISION - NZPP TRAINING ROOM 211 1 20 0.6 0.0 20 1 SPARE 44
41 TELEVISION - ROLL CALL 224 1 20 0.6 0.0 20 1 SPARE 42
39 EWC - CORRIDOR 210 1 20 0.6 0.0 20 1 PUH-3 - SGT WORKSTATIONS 223 40
37 RECEPT - RECEPTION 201 1 20 0.7 0.0 20 1 PUH-2 - JANITOR 212 38
35 RECEPT - RECEPTION 201 1 20 0.9 0.5 20 1 COPIER - WORKSTATIONS 202 36
33 RECEPT - EXAM 2 207 1 20 0.4 0.7 20 1 RECEPT - WORKSTATIONS 202 34
31 AUDITORY CHAMBER - EXAM 2 207 1 20 0.2 0.7 20 1 RECEPT - WORKSTATIONS 202 32
29 COUNTER RECEPT - EXAM 2 207 1 20 0.5 0.5 20 1 MICROWAVE - BREAK ROOM 208 30
27 BED RECEPT - EXAM 2 207 1 20 0.9 0.4 20 1 COUNTER RECEPT - BREAK ROOM 208 28
25 HAND DRYER - TOILET 203 1 20 1.4 1.0 20 1 REFRIGERATOR - BREAK ROOM 208 26
23 RECEPT - TOILETS 1 20 0.5 0.5 20 1 COUNTER RECEPT - EXAM 1 205 24
21 RECEPT - SGT. WORKSTATIONS 223 1 20 0.7 0.9 20 1 BED RECEPT - EXAM 1 205 22
19 RECEPT - SGT. WORKSTATIONS 223 1 20 0.7 0.4 20 1 RECEPT - EXAM 1 205, EXAM 3 / SPEC LAB 209 20
17 RECEPT - ROLL CALL 224 1 20 0.7 0.5 20 1 ICE MAKER - EXAM 3 / SPEC LAB 209 18
15 RECEPT - ROLL CALL 224 1 20 0.7 0.5 20 1 U/C REFRIGERATOR - EXAM 3 / SPEC LAB 209 16
13 RECEPT - LIEUTENANT'S OFFICE 215 1 20 0.7 0.5 20 1 COUNTER RECEPT - EXAM 3 / SPEC LAB 209 14
11 RECEPT - ASST. CHIEF'S OFFICE 216 1 20 0.7 0.9 20 1 BED RECEPT - EXAM 3 / SPEC LAB 209 12
9 RECEPT - CORRIDORS 1 20 0.7 0.4 20 1 RECEPT - NZPP TRAINING ROOM 211 10
7 RECEPT - ID OFFICE 220 1 20 0.7 0.5 20 1 RECEPT - NZPP TRAINING ROOM 211 8
5 RECEPT - SUPERVISOR'S OFFICE 219 1 20 0.7 0.5 20 1 RECEPT - NZPP TRAINING ROOM 211 6
3 RECEPT - SPACE 112 1 20 0.7 1.0 20 1 MEDICAL REFRIGERATOR - OHS SUITE 204 4
1 RECEPT - CHIEF'S OFFICE 217 1 20 0.7 0.7 20 1 RECEPT - CORRIDORS 2
# P TA A B C A B C TA P #
CKT ITEM SERVED ITEM SERVED CKT
CB LOAD (kVA) CB
LOCATION: NOTES: PROVIDE INTEGRAL SURGE PROTECTIVE DEVICE, SINGLE ENCLOSURE
ENCLOSURE: NEMA 1 MOUNTING: SURFACE FED FROM: RP1SA
MIN AIC: 10,000 VOLTS: 208Y/120V PHASES: 3 WIRES: 4
PANELBOARD: RP2S BUS RATING: 100 A MAIN: MLO
2 07/01/16 Addendum
STAMP
CHO BENN HOLBACK + ASSOCIATES
100N. CHARLES ST, BALTIMORE, MD 21201
MUELLER ASSOCIATES
1306 CONCOURSE DRIVE,
SUITE 100
LINTHICUM, MD 21090
F16SOL10044 15 of 18
MEP
VEST.
FAMILY
VEST.
MEN'S
WOMEN'S
MEP
CUST.
CUST.
MECH /
ELEC
IT ROOM
103A
3 5
A
B
C
72 4 6
A.9
AV ROOM
103C
VESTIBULE
103DSEC
CLOSET
103B
4"ø
4"ø
1 1/2"ø
/2 "ø
2AV-101
F
2AV-5012AV-101
/2 "ø
1 1/2"ø
E
2AV-5012AV-101
C
AV ROOM
103C
SEC
CLOSET
103B
12"x2"ø
LT
12"x4"ø
LT
2AV-501
A
4"ø
12"x4"ø
LT
1/2"=1'-0"1/2"=1'-0"1/2"=1'-0"1/2"=1'-0"
1'1'1'1' 2'2'2'2' 4'4'4'4'
TRUE NORTH
1/8"=1'-0"1/8"=1'-0"1/8"=1'-0"1/8"=1'-0"
4'4'4'4' 8'8'8'8' 16'16'16'16'
Smithsonian Facilities 600 Maryland Avenue S.W. Suite 5001
Washington, DC 20024-2520
Smithsonian Institution
GRAPHIC SCALE(S)GRAPHIC SCALE(S)GRAPHIC SCALE(S)GRAPHIC SCALE(S)
AAAA
1111 2222 3333 4444 5555 6666 7777 8888 9999 10101010 11111111 12121212
BBBB
CCCC
DDDD
EEEE
FFFF
GGGG
HHHH
JJJJ
KKKK
LLLL
MMMM
1111 2222 3333 4444 5555 6666 7777 8888 9999 10101010 11111111 12121212
AAAA
BBBB
CCCC
DDDD
EEEE
FFFF
GGGG
HHHH
JJJJ
KKKK
LLLL
MMMM
SHEET NO.SHEET NO.SHEET NO.SHEET NO.
OFOFOFOF
PROJECT TITLEPROJECT TITLEPROJECT TITLEPROJECT TITLE
A/E PROJECT NUMBERA/E PROJECT NUMBERA/E PROJECT NUMBERA/E PROJECT NUMBER
ADDRESSADDRESSADDRESSADDRESS
BUILDING NAMEBUILDING NAMEBUILDING NAMEBUILDING NAME
OFEO PROJECT NUMBEROFEO PROJECT NUMBEROFEO PROJECT NUMBEROFEO PROJECT NUMBER
DRAWING TITLEDRAWING TITLEDRAWING TITLEDRAWING TITLE
DRAWING TYPEDRAWING TYPEDRAWING TYPEDRAWING TYPE
WORKING STAFFWORKING STAFFWORKING STAFFWORKING STAFF
STAMP
DATE
REVISION # DATE
SUBMISSION
REVISION DESCRIPTION
PROJECT NORTH
FOR
CONSTRUCTION
TYPE
DRAWN BY
SEQUENCEDISCIPLINE
CHECKED BYDESIGNED BY
RENEW POLICE STATION,
REPLACE PUBLIC
RESTROOMS
AND PAVILION, AND
ELECTRICAL SUBSTATION
:5 :3
P M
:5 :3
P M
:5 :3
P M
:5 :3
P M RESTROOMS - LOWER LEVEL FLOORRESTROOMS - LOWER LEVEL FLOORRESTROOMS - LOWER LEVEL FLOORRESTROOMS - LOWER LEVEL FLOOR
PLANPLANPLANPLAN
21445214452144521445
FPFPFPFP
315315315315 319319319319
RENEW POLICE STATION, REPLACERENEW POLICE STATION, REPLACERENEW POLICE STATION, REPLACERENEW POLICE STATION, REPLACE PUBLIC RESTROOMS AND PAVILION,PUBLIC RESTROOMS AND PAVILION,PUBLIC RESTROOMS AND PAVILION,PUBLIC RESTROOMS AND PAVILION, AND ELECTRICAL SUBSTATIONAND ELECTRICAL SUBSTATIONAND ELECTRICAL SUBSTATIONAND ELECTRICAL SUBSTATION
06/03/1606/03/1606/03/1606/03/16 FINAL CONSTRUCTION DOCUMENTSFINAL CONSTRUCTION DOCUMENTSFINAL CONSTRUCTION DOCUMENTSFINAL CONSTRUCTION DOCUMENTS
A V
B Y
A p p ro v e r
F
IN
A L
C O N S T R U C T
IO
N
D O C U M E N T S
A V
B Y
A p p ro v e r
F
IN
A L
C O N S T R U C T
IO
N
D O C U M E N T S
A V
B Y
A p p ro v e r
F
IN
A L
C O N S T R U C T
IO
N
D O C U M E N T S
A V
B Y
A p p ro v e r
F
IN
A L
C O N S T R U C T
IO
N
D O C U M E N T S
NZPNZPNZPNZP
3001 Connecticut Avenue, NW3001 Connecticut Avenue, NW3001 Connecticut Avenue, NW3001 Connecticut Avenue, NW Washington, DC 20008Washington, DC 20008Washington, DC 20008Washington, DC 20008
NZP
1633109163310916331091633109
GHD, INC.GHD, INC.GHD, INC.GHD, INC.
14858 Avion Pkwy Ste 15014858 Avion Pkwy Ste 15014858 Avion Pkwy Ste 15014858 Avion Pkwy Ste 150
Chantilly, Virginia 20151Chantilly, Virginia 20151Chantilly, Virginia 20151Chantilly, Virginia 20151
ACJACJACJACJ
2AV2AV2AV2AV
VLWVLWVLWVLWVLWVLWVLWVLW
1111 01010101
SHEET NOTES
KEYNOTES
1 TELECOM GROUND BUS 18" AFF.
2 PROVIDE (3) 18"x18x12" PULL BOXES AT CEILING
LEVEL.
3 2" SLEEVE WITH 1 1/2" EMT CONDUIT WITHIN WALL
FURRING FOR SMART TV'S.
4 6" POKE THRU TO RECESSED FLOOR BOX IN SLAB
FOR LECTERN LOCATION.
5 1900 BOX IN WALL 18"AFF FOR MICROPHONE AND
AUDIO INPUT + FACEPLATE
6 1900 BOX IN WALL 54" AFF FOR WALL MOUNTED A/V
CONTROL BOX.
7 12"X2" LADDER TRAY 6" ABOVE NEW CABINET.
8 2" SLEEVE WITH 1 1/2" EMT CONDUIT FOR
SPEAKERS. ROUTE TO STEEL BEAM AT "ROOF
BEARING" LEVEL WITH CONCEALED CONDUIT
BEHIND STEEL BEAM. SEE DETAIL E/2AV501.
SCALE = 1/8" = 1'-0"2AV-101
1 LOWER LEVEL - AUDIO VISUAL - CONDUIT
1. REFER TO SHEET 2AV 102 FOR AV DEVICE
LOCATIONS.
SCALE = 1/2" = 1'-0"2AV-101
2 ENLARGED PLAN A/V ROOM 103C
2 07/01/16 Addendum
F16SOL10044 16 of 18
JB
F
JB
F
72"
LCD
L C D
72"
LCD
72"
LCD
L C D
72"
LCD C
S
C S
C S
W S
W S
W S
C S
W S
WOMEN'S
LOUNGE
MEN'S
SERVICE /
STAGING
EVENT
SPACE
JAN
1 2
3 5
A
B
C
72 4 6
A.9
C
2AV-5012AV-102
2AV-501
B
2AV-501
B
5 8
F
2AV-5012AV-101 1 1/2"ø
E
2AV-5012AV-101
2 9
2 9 2 914
EVENT
SPACE
LOUNGE
WOMEN'S
MEN'S
SERVICE /
STAGING
3 5
A
B
C
72 4 6
A.9
JAN
VESTIBULE
C
2AV-5012AV-102
2AV-501
D
2AV-501
D
2AV-501
D
2AV-501
D
3 8
F
2AV-5012AV-101
E
2AV-5012AV-101
TRUE NORTH
1/8"=1'-0"1/8"=1'-0"1/8"=1'-0"1/8"=1'-0"
4'4'4'4' 8'8'8'8' 16'16'16'16'
Smithsonian Facilities 600 Maryland Avenue S.W. Suite 5001
Washington, DC 20024-2520
Smithsonian Institution
KEY PLAN
GRAPHIC SCALE(S)GRAPHIC SCALE(S)GRAPHIC SCALE(S)GRAPHIC SCALE(S)
AAAA
1111 2222 3333 4444 5555 6666 7777 8888 9999 10101010 11111111 12121212
BBBB
CCCC
DDDD
EEEE
FFFF
GGGG
HHHH
JJJJ
KKKK
LLLL
MMMM
1111 2222 3333 4444 5555 6666 7777 8888 9999 10101010 11111111 12121212
AAAA
BBBB
CCCC
DDDD
EEEE
FFFF
GGGG
HHHH
JJJJ
KKKK
LLLL
MMMM
SHEET NO.SHEET NO.SHEET NO.SHEET NO.
OFOFOFOF
PROJECT TITLEPROJECT TITLEPROJECT TITLEPROJECT TITLE
A/E PROJECT NUMBERA/E PROJECT NUMBERA/E PROJECT NUMBERA/E PROJECT NUMBER
ADDRESSADDRESSADDRESSADDRESS
BUILDING NAMEBUILDING NAMEBUILDING NAMEBUILDING NAME
OFEO PROJECT NUMBEROFEO PROJECT NUMBEROFEO PROJECT NUMBEROFEO PROJECT NUMBER
DRAWING TITLEDRAWING TITLEDRAWING TITLEDRAWING TITLE
DRAWING TYPEDRAWING TYPEDRAWING TYPEDRAWING TYPE
WORKING STAFFWORKING STAFFWORKING STAFFWORKING STAFF
STAMP
DATE
REVISION # DATE
SUBMISSION
REVISION DESCRIPTION
PROJECT NORTH
FOR
CONSTRUCTION
TYPE
DRAWN BY
SEQUENCEDISCIPLINE
CHECKED BYDESIGNED BY
RENEW POLICE STATION,
REPLACE PUBLIC
RESTROOMS
AND PAVILION, AND
ELECTRICAL SUBSTATION
:5 :4
P M
:5 :4
P M
:5 :4
P M
:5 :4
P M RESTROOMS - UPPER LEVEL FLOORRESTROOMS - UPPER LEVEL FLOORRESTROOMS - UPPER LEVEL FLOORRESTROOMS - UPPER LEVEL FLOOR
PLANPLANPLANPLAN
21445214452144521445
FPFPFPFP
316316316316 319319319319
RENEW POLICE STATION, REPLACERENEW POLICE STATION, REPLACERENEW POLICE STATION, REPLACERENEW POLICE STATION, REPLACE PUBLIC RESTROOMS AND PAVILION,PUBLIC RESTROOMS AND PAVILION,PUBLIC RESTROOMS AND PAVILION,PUBLIC RESTROOMS AND PAVILION, AND ELECTRICAL SUBSTATIONAND ELECTRICAL SUBSTATIONAND ELECTRICAL SUBSTATIONAND ELECTRICAL SUBSTATION
06/03/1606/03/1606/03/1606/03/16 FINAL CONSTRUCTION DOCUMENTSFINAL CONSTRUCTION DOCUMENTSFINAL CONSTRUCTION DOCUMENTSFINAL CONSTRUCTION DOCUMENTS
A V
B Y
A p p ro v e r
F
IN
A L
C O N S T R U C T
IO
N
D O C U M E N T S
A V
B Y
A p p ro v e r
F
IN
A L
C O N S T R U C T
IO
N
D O C U M E N T S
A V
B Y
A p p ro v e r
F
IN
A L
C O N S T R U C T
IO
N
D O C U M E N T S
A V
B Y
A p p ro v e r
F
IN
A L
C O N S T R U C T
IO
N
D O C U M E N T S
NZPNZPNZPNZP
3001 Connecticut Avenue, NW3001 Connecticut Avenue, NW3001 Connecticut Avenue, NW3001 Connecticut Avenue, NW Washington, DC 20008Washington, DC 20008Washington, DC 20008Washington, DC 20008
NZP
1633109163310916331091633109
GHD, INC.GHD, INC.GHD, INC.GHD, INC.
14858 Avion Pkwy Ste 15014858 Avion Pkwy Ste 15014858 Avion Pkwy Ste 15014858 Avion Pkwy Ste 150
Chantilly, Virginia 20151Chantilly, Virginia 20151Chantilly, Virginia 20151Chantilly, Virginia 20151
ACJACJACJACJ
2AV2AV2AV2AV
VLWVLWVLWVLWVLWVLWVLWVLW
1111 02020202
SHEET NOTES
KEYNOTES
1 RECESSED FLOOR BOX IN SLAB FLUSH MOUNT FOR
LECTERN AND A/V INPUTS.
2 1900 BOX IN WALL FOR SPEAKER.
3 1900 BOX IN WALL FOR 90" LCD 4K SMART TV.
4 PROVIDE (1) 1900 BOX 18" AFF AND (1) 1900 BOX
BEHIND 90" TV CONNECT BOTH 1900 BOXES WITH 1"
EMT CONDUIT INSIDE WALL FOR USB TO USB
CONNECTION. RUN WIRING WITHIN EXPOSED
WIREMOLD, SEE ARCHITECTURAL DRAWINGS FOR
LOCATION.
5…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .