Exhibits A-F - Contract Data Requirements List.pdf
PDF 1 MB Posted
- Attached to
- UNITED STATES MARINE CORPS (USMC) MARINE COMMON AIRCREW TRAINER MODERNIZATION PROGRAM (MCAT MP)
- Solicitation number
- N6134024R0007
About this file
This document is a Contract Data Requirements List (CDRL) related to the United States Marine Corps (USMC) Marine Common Aircrew Trainer Modernization Program (MCAT MP) solicitation N6134024R0007.
The CDRL details the data items that must be delivered by the contractor throughout the course of the contract, including requirements traceability, test procedures, test/inspection reports, software design, program management reports, conference materials, logistics data, security plans, and other technical documentation. Key delivery dates, submission requirements, distribution details, and approval processes are specified for each data item. The solicitation is seeking modernization services for MCAT devices 2H166A and 2H166B, with the government having 30 calendar days to review and accept/reject each submission. The contract will be awarded to small business TSC IV IDIQ MAC prime contract holders, who must rerepresent as part of their proposal.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 37
DATA
ITEM NO.
MCAT PRODUCTION CDRLS
AUTHORITY DATE
A001 REQUIREMENTS TRACEABILITY VERIFICATION MATRIX (RTVM) DI-MGMT-82133
A002 REVISIONS TO EXISTING GOVERNMENT DOCUMENTS - TEST PROCEDURE (TP) DI-ADMN-80925A
A003 TEST/INSPECTION REPORT (TIR) DI-NDTI-80809B
A004
REVISIONS TO EXISTING GOVERNMENT DOCUMENTS - SOFTWARE PRODUCT
PACKAGE (SPP)
DI-ADMN-80925A
A005 DOD RISK MANAGEMENT FRAMEWORK (RMF) PACKAGE DI-MGMT-82001A
A006 ENGINEERING CHANGE PROPOSAL (ECP) DI-SESS-80639E
A007 REQUEST FOR VARIANCE (RFV) DI-SESS-80640E
A008 SYNTHETIC ENVIRONMENT DATABASE DESIGN DOCUMENT (SEDDD) DI-MSSM-82158A
A009
REVISIONS TO EXISTING GOVERNMENT DOCUMENTS – SYSTEM/SUBSYSTEM
SPECIFICATION (SSS)
DI-ADMN-80925A
A00A
REVISIONS TO EXISTING GOVERNMENT DOCUMENTS – SYSTEM/SUBSYSTEM
DESIGN DESCRIPTION (SSDD)
DI-ADMN-80925A
A00B
REVISIONS TO EXISTING GOVERNMENT DOCUMENTS - SOFTWARE PRODUCT
DESIGN (SPD)
DI-ADMN-80925A
B001 CONTRACTORS PROGRESS, STATUS, AND MANAGEMENT REPORT (CPSMR) DI-MGMT-81928
B002
INTEGRATED PROGRAM MANAGEMENT DATA AND ANALYSIS REPORT
(IPMDAR)- INTEGRATED MASTER SCHEDULE (IMS)
DI-MGMT-81861C
B003 CONFERENCE AGENDA DI-ADMN-81249C
B004 CONFERENCE MINUTES DI-ADMN-81250C
B005 PRESENTATION MATERIAL DI-ADMN-81373
B006 OPERATIONS SECURITY (OPSEC) PLAN DI-MGMT-80934C
C001 LOGISTICS PRODUCT DATA (LDP) DI-SESS-81758A
C002 ENGINEERING DATA FOR PROVISIONING (EDFP) DI-SESS-81874
C003
BILL OF MATERIALS (BOM) FOR DIMINISHING MANUFACTURING SOURCES
AND MATERIAL SHORTAGES (DMSMS) MANAGEMENT- DIMINISHING
MANUFACTURING SOURCES AND MATERIAL SHORTAGES (DMSMS) REPORT
DI-PSSS-81656B
C004
DIMINISHING MANUFACTURING SOURCES AND MATERIAL SHORTAGES
(DMSMS) MANAGEMENT PLAN
DI-MGMT-81948
D001
REVISION TO EXISTING GOVERNMENT DOCUMENTS – BASELINE DESCRIPTION
DOCUMENT (BDD)
DI-ADMN-80925A
D002 TRAINING DEVICE INVENTORY CHECKLIST/ RECORD (TD ICL/R) DI-MISC-81191B
D003
ITEM UNIQUE IDENTIFICATION (IUID) MARKING ACTIVITY, VALIDATION AND
VERIFICATION REPORT
DI-MGMT-81804A
D004
REVISION TO EXISTING GOVERNMENT DOCUMENTS - TRAINER FACILITIES
REPORT (TFR)
DI-ADMN-80925A
D005 TRAINING DEVICE INTERIM SUPPORT REPORT (TDISR) DI-MGMT-81997A
D006 WARRANTY PERFORMANCE REPORT DI-SESS-81639B
E001
REVISIONS TO EXISTING GOVERNMENT DOCUMENTS - OPERATION &
MAINTENANCE (O&M) MANUAL
DI-ADMN-80925A
E002
REVISIONS TO EXISTING GOVERNMENT DOCUMENTS - PRODUCT
ENGINEERING DESIGN DATA AND ASSOCIATED LISTS (PEDDAL)
DI-ADMN-80925A
E003
REVISIONS TO EXISTING GOVERNMENT DOCUMENTS - MAINTENANCE
REQUIREMENT CARDS (MRC)
DI-ADMN-80925A
E004
REVISIONS TO EXISTING GOVERNMENT DOCUMENTS - COMMERCIAL OFF THE
SHELF MANUALS (COTS)
DI-ADMN-80925A
E005
REVISIONS TO EXISTING GOVERNMENT DOCUMENTS - HANDBOOK DEVICE
UTILIZATION FOR NAVY TRAINING DEVICES, INSTRUCTOR/OPERATOR
HANDBOOK (I/OH)
DI-ADMN-80925A
F001 INTENTIONALLY LEFT BLANK
F002
REVISIONS TO EXISTING GOVERNMENT DOCUMENTS - TRAINING PROGRAM
STRUCTURE DOCUMENT (TPSD), INSTRUCTOR/OPERATOR TRAINING COURSE
DI-ADMN-80925A
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 2 of 37
C O N T R A C T D A T A R E Q U I R E M E N T S L I S T (1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
CLIN 0002, 1002, 2002, 3002,
4002, 5002, 6002
A TDP _____ TM _____ OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
MCAT MODERNIZATION PROGRAM –
DEVICE 2H166A & 2H166B
N6134024R0007 N/A
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A001
REQUIREMENTS TRACEABILITY VERIFICATION
MATRIX (RTVM)
N/A
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MGMT-82133 SOW 230027, PARA 3.2.4.2 PMA205
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION
14. DISTRIBUTION
DD
REQUIRED
4TIMES SEE BLK 16
8. APP CODE D
11. AS OF DATE 13. DATE OF SUBSEQUENT SUBM.
a. ADDRESSEE
b. COPIES
Final
A N/A SEE BLK 16 draft reg repr
16. REMARKS
1. BLK 8: TECHNICAL APPROVAL SHALL BE FOR COMPLETE, COMPLIANT
FULFILLMENT OF CONTENT AND REQUIREMENTS OF BLOCK 4 AUTHORITY. THE
GOVERNMENT WILL HAVE 30 CALENDAR DAYS FOR REVIEW AND ACCEPTANCE/
REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 15
CALENDAR DAYS TO CORRECT AND RESUBMIT REJECTED MATERIALS.
2. BLK 9: SEE ATTACHMENT: (7) TITLED ‘CONTRACT DATA REQUIREMENTS LIST
(CDRL) CONTROLLED UNCLASSIFIED INFORMATION (CUI) BLOCK 9 RELATED
ANNOTATIONS’.
3. BLK 12: FIRST SUBMISSION SHALL BE DUE 21 CALENDAR DAYS PRIOR TO SRR-
II/SFR IPR AND SHALL INCORPORATE ALL REQUIREMENTS AND INCLUDE
TRACEABILITY (DECOMPOSED AND DERIVED REQUIREMENTS) TO THE
FUNCTIONAL BASELINE.
4. BLK 13: SUBSEQUENT SUBMISSIONS SHALL BE DUE AS FOLLOWS:
a. SECOND SUBMISSION SHALL BE DUE 21 CALENDAR DAYS PRIOR TO
CDR IPR.
b. THIRD SUBMISSION FOR THE FIRST DEVICE LOCATION SHALL BE DUE
21 CALENDAR DAYS PRIOR TO TRR FOR IT-C1 AND THIRD SUBMISSION
FOR THE REMAINING DEVICES SHALL BE 21 CALENDAR DAYS PRIOR
TO TRR IPR FOR IT-C2 AND THE THIRD SUBMISSION SHALL
INCORPORATE TRACEABILITY BETWEEN ALL REQUIREMENTS
(DECOMPOSED AND DERIVED REQUIREMENTS).
c. FOURTH (FINAL) SUBMISSION SHALL BE DUE 15 CALENDAR DAYS
AFTER IT-C1 FOR FIRST DEVICE LOCATION AND FOURTH (FINAL)
SUBMISSION SHALL BE 15 CALENDAR DAYS AFTER IT-C2 FOR ALL
REMAINING DEVICES.
5. BLK 14: THIS DELIVERABLE SHALL BE SUBMITTED IN DIGITAL IAVA SCANNED
FORMAT COMPATIABLE WITH NAVY MARINE CORPS INTRANET
(https://www.homeport.navy.mil/services/ngen-core-build); ONE COPY AS ADOBE
ACROBAT DOCUMENT FORMAT (PDF) AND ONE COPY OF TECHNICAL DOCUMENT
SHALL BE PROVIDED IN MICROSOFT OFFICE 2016 COMPATIBLE FORMAT. THE
EXCRYPTED DELIVERABLES SHALL BE PROVIDED TO PMA-205 VIA DOD SAFE
(SECURE ACCESS FILE EXCHANGE) (https://safe.apps.mil). WITH NOTIFICATION
EMAIL OF CDRL AVAILABILITY TO MCAT DATA MANAGER. THE MCAT DM WILL
PERFORM THE FILE REQUEST FROM CONTRACTOR, VIA DOD SAFE, AFTER
RECEIPT OF EMAIL NOTIFICATION.
SEE BLK 16 0 1 0
15. TOTAL → 0 1 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
T. NACHTRAB, MCAT LSE 14 March 2024 https://www.homeport.navy.mil/services/ngen-core-build https://safe.apps.mil/
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 3 of 37
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
CLIN 0002, 1002, 2002, 3002,
4002, 5002, 6002
A TDP _____ TM _____ OTHER ADMN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
MCAT MODERNIZATION PROGRAM –
DEVICE 2H166A & 2H166B
N6134024R0007
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A002
REVISIONS TO EXISTING GOVERNMENT
DOCUMENTS
TEST PROCEDURE (TP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-ADMN-80925A SOW 230027, PARA 3.2.12.4 PMA205
3TIMES SEE BLK 16
a. ADDRESSEE
b. COPIES
Final
1. BLK 8: TECHNICAL APPROVAL REQUIRED FOR NEW AND/OR REVISED PRODUCT
TO DEVICE CONFIGURATION ALIGNMENT AND CONFORMANCE TO PRIOR TEST
PROCEDURES SUBMITTED UNDER RELATED DI-MGMT-82133 CDRL SUBMITTALS.
THE GOVERNMENT WILL HAVE 30 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL
HAVE 15 CALENDAR DAYS AFTER RECEIPT OF GOVERNMENT REJECTION OF
SUBMITTAL TO REVISE AND RESUBMIT.
2. BLK 9: SEE ATTACHMENT: (7) TITLED ‘CONTRACT DATA REQUIREMENTS LIST
(CDRL) CONTROLLED UNCLASSIFIED INFORMATION (CUI) BLOCK 9 RELATED
ANNOTATIONS’.
3. BLK 10 AND 12: FIRST SUBMISSION SHALL BE DUE 30 CALENDAR DAYS PRIOR
TO DT-C1 FOR THE FIRST DEVICE LOCATION AND FIRST SUMBISSION SHALL BE
30 CALENDAR DAYS PRIOR TO DT-C2 FOR EACH REMAINING DEVICE.
4. BLK 10 AND 13: SUBSEQUENT SUBMISSIONS SHALL BE DUE AS FOLLOWS:
a. SECOND SUBMISSION FOR THE FIRST DEVICE LOCATION SHALL BE DUE
SEVEN CALENDAR DAYS PRIOR TO TRR FOR IT-C1 AND SECOND
SUBMISSION FOR EACH REMAINING DEVICE SHALL BE DUE SEVEN
CALENDAR DAYS PRIOR TRR IPR FOR IT-C2.
b. THIRD (FINAL) SUBMISSION FOR THE FIRST DEVICE LOCATION SHALL BE
DUE SEVEN CALENDAR DAYS AFTER IT-C1 AND THIRD (FINAL)
SUBMISSION FOR EACH REMAINING DEVICE SHALL BE SEVEN CALENDAR
DAYS AFTER IT-C2.
5. BLK 14: THIS DELIVERABLE SHALL BE SUBMITTED IN DIGITAL IAVA SCANNED
FORMAT COMPATIABLE WITH NAVY MARINE CORPS INTRANET
(https://www.homeport.navy.mil/services/ngen-core-build); ONE COPY AS ADOBE
ACROBAT DOCUMENT FORMAT (PDF) AND ONE COPY OF TECHNICAL
DOCUMENT SHALL BE PROVIDED IN MICROSOFT OFFICE 2016 COMPATIBLE
FORMAT. THE EXCRYPTED DELIVERABLES SHALL BE PROVIDED TO PMA-205
VIA DOD SAFE (SECURE ACCESS FILE EXCHANGE) (https://safe.apps.mil). WITH
NOTIFICATION EMAIL OF CDRL AVAILABILITY TO MCAT DATA MANAGER. THE
MCAT DM WILL PERFORM THE FILE REQUEST FROM CONTRACTOR, VIA DOD
SAFE, AFTER RECEIPT OF EMAIL NOTIFICATION.
SEE BLK 16 0 0 1
15. TOTAL → 0 0 1
T. NACHTRAB, MCAT LSE 14 March 2024
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 4 of 37
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
CLIN 0002, 1002, 2002, 3002,
4002, 5002, 6002
A TDP _____ TM _____ OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
MCAT MODERNIZATION PROGRAM –
DEVICE 2H166A & 2H166B
N6134024R0007
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A003 TEST/INSPECTION REPORT (TIR) N/A
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-NDTI-80809B SOW 230027, PARA 3.2.12.4 PMA205
LT
a. ADDRESSEE
b. COPIES
Final
GOVERNMENT WILL HAVE 30 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE
15 CALENDAR DAYS TO CORRECT AND RESUBMIT REJECTED MATERIALS.
2. BLK 9: SEE ATTACHMENT: (7) TITLED ‘CONTRACT DATA REQUIREMENTS LIST
(CDRL) CONTROLLED UNCLASSIFIED INFORMATION (CUI) BLOCK 9 RELATED
ANNOTATIONS’.
3. BLK 12: FIRST (DRAFT) SUBMISSION SHALL BE DUE 15 CALENDAR DAYS AFTER
PRE-MODIFICATION INSPECTION (PMI) FOR EACH DEVICE LOCATION.
4. BLK 13: SUBSEQUENT SUBMISSIONS SHALL BE DUE AS FOLLOWS:
a. SECOND SUBMISSION SHALL BE DUE 15 CALENDAR DAYS AFTER DT-C1
FOR THE FIRST DEVICE LOCATION AND SECOND SUBMISSION SHALL BE 15
CALENDAR DAYS AFTER DT-C2 FOR EACH REMAINING DEVICE.
b. THIRD (FINAL) SUBMISSION SHALL BE DUE 15 CALENDAR DAYS AFTER IT-C1
FOR THE FIRST DEVICE LOCATION AND THIRD (FINAL) SUBMISSION SHALL
BE 15 CALENDAR DAYS AFTER IT-C2 FOR EACH REMAINING DEVICE.
5. BLK 14: THIS DELIVERABLE SHALL BE SUBMITTED IN DIGITAL IAVA SCANNED
FORMAT COMPATIABLE WITH NAVY MARINE CORPS INTRANET
(https://www.homeport.navy.mil/services/ngen-core-build); ONE COPY AS ADOBE
ACROBAT DOCUMENT FORMAT (PDF) AND ONE COPY OF TECHNICAL DOCUMENT
SHALL BE PROVIDED IN MICROSOFT OFFICE 2016 COMPATIBLE FORMAT. THE
EXCRYPTED DELIVERABLES SHALL BE PROVIDED TO PMA-205 VIA DOD SAFE
(SECURE ACCESS FILE EXCHANGE) (https://safe.apps.mil). WITH NOTIFICATION
EMAIL OF CDRL AVAILABILITY TO MCAT DATA MANAGER. THE MCAT DM WILL
PERFORM THE FILE REQUEST FROM CONTRACTOR, VIA DOD SAFE, AFTER
SEE BLK 16 1 1 0
15. TOTAL → 1 1 0
T. NACHTRAB, MCAT LSE 14 March 2024
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 5 of 37
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
CLIN 0002, 1002, 2002, 3002,
4002, 5002, 6002
A TDP _____ TM _____ OTHER ADMN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
MCAT MODERNIZATION PROGRAM –
DEVICE 2H166A & 2H166B
N6134024R0007
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A004
REVISIONS TO EXISTING GOVERNMENT
DOCUMENTS
SOFTWARE PRODUCT PACKAGE (SPP)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-ADMN-80925A
SOW 230027, PARA 3.2.4.4 &
3.2.4.10
PMA205
2TIMES SEE BLK 16
a. ADDRESSEE
b. COPIES
Final
1. BLK 4: EACH SUBMISSION SHALL CONTAIN THE DELIVERABLE SOURCE CODE AND
THE DOCUMENTATION.
2. BLK 8: TECHNICAL APPROVAL REQUIRED FOR PRODUCT TO DEVICE
CONFIGURATION ALIGNMENT AND CONFORMANCE TO DI-IPSC-82090C. THE
GOVERNMENT WILL HAVE 30 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE/REJECTION OF EACH SUBMISSION. MATERIAL ACCEPTED
CONDITIONALLY, ACCEPTED WITH COMMENTS, OR REJECTED SHALL BE
CORRECTED AND RESUBMITTED WITHIN 15 CALENDAR DAYS. THE CONTRACTOR
SHALL FOLLOW NAWCTSD GUIDELINES FOR RESUBMISSION DAYS PER
AGREEMENT WITH THE GOVERNMENT PROGRAM MANAGER.
3. BLK 9: SEE ATTACHMENT: (7) TITLED ‘CONTRACT DATA REQUIREMENTS LIST
(CDRL) CONTROLLED UNCLASSIFIED INFORMATION (CUI) BLOCK 9 RELATED
ANNOTATIONS’.
4. BLK 10 AND 12: REVISIONS TO PREVIOUS DEVICE’S SPP AS NEEDED AT DT-C1
AND SHALL NOT INCLUDE MEDIA FOR COMMERCIAL ITEM SOFTWARE.
5. BLK 12: FIRST SUBMISSION SHALL BE DUE FIVE CALENDAR DAYS PRIOR TO DT-C1
FOR DEVICE 2H166A-3 AND SUBMISSIONS FOR SUBSEQUENT DEVICES SHALL BE
FIVE CALENDAR DAYS PRIOR TO TRR-IPR FOR EACH REMAINING DEVICE.
6. BLK 13: SECOND SUBMISSION SHALL BE DUE FIVE CALENDAR DAYS PRIOR TO
TRR FOR DEVICE 2H166A-3
7. BLK 14: THIS DELIVERABLE SHALL BE SUBMITTED IN DIGITAL IAVA SCANNED
FORMAT COMPATIABLE WITH NAVY MARINE CORPS INTRANET
(https://www.homeport.navy.mil/services/ngen-core-build); ONE COPY AS ADOBE
ACROBAT DOCUMENT FORMAT (PDF) AND ONE COPY OF TECHNICAL DOCUMENT
SHALL BE PROVIDED IN MICROSOFT OFFICE 2016 COMPATIBLE FORMAT. THE
EXCRYPTED DELIVERABLES SHALL BE PROVIDED TO PMA-205 VIA DOD SAFE
(SECURE ACCESS FILE EXCHANGE) (https://safe.apps.mil). WITH NOTIFICATION
EMAIL OF CDRL AVAILABILITY TO MCAT DATA MANAGER. THE MCAT DM WILL
PERFORM THE FILE REQUEST FROM CONTRACTOR, VIA DOD SAFE, AFTER
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 6 of 37
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
CLIN 0002, 1002, 2002, 3002,
4002, 5002, 6002
A TDP _____ TM _____ OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
MCAT MODERNIZATION PROGRAM –
DEVICE 2H166A & 2H166B
N6134024R0007
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A005
DOD RISK MANAGEMENT FRAMEWORK (RMF)
PACKAGE DELIVERABLES
N/A
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MGMT-82001A
SOW 230027, PARA 3.2.3, 3.2.3.2,
3.2.3.4, & 3.2.3.5
PMA205
ASREQ SEE BLK 16
a. ADDRESSEE
b. COPIES
Final
1. BLK 4: FORMAT REFERENCED IN DID IS INCLUDED IN RFP SECTION J AND IS
ATTACHMENT 8 TO THE RFP: “ATTACHMENT8_RMF_PACKAGE_FORMAT”.
2. BLK 8: TECHNICAL APPROVAL SHALL BE FOR COMPLETE, COMPLIANT FULFILLMENT OF
CONTENT AND REQUIREMENTS OF BLOCK 4 AUTHORITY. THE GOVERNMENT WILL HAVE
30 CALENDAR DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION.
THE CONTRACTOR SHALL HAVE 15 CALENDAR DAYS TO CORRECT AND RESUBMIT
REJECTED MATERIALS.
3. BLK 9: SEE ATTACHMENT: (7) TITLED ‘CONTRACT DATA REQUIREMENTS LIST (CDRL)
CONTROLLED UNCLASSIFIED INFORMATION (CUI) BLOCK 9 RELATED ANNOTATIONS’.
4. BLK 12/13 – SEE TABLE BELOW
MCAT RMF PACKAGE ELEMENTS DATE DUE
• SYSTEM REGISTRATION TAB
• ALL COLUMNS OF THE DATA FLOW WORKSHEET
EXCEPT PROTOCOL AND PORTS
• ALL COLUMNS OF THE SYSTEM INTERFACES
WORKSHEET EXCEPT PORTS
• REQUIREMENTS SELECTION TAB
FIRST SUBMISSION DUE 15 CALENDAR
DAYS PRIOR TO SRR II/SFR IPR
• INVENTORY AND SYSTEM INFORMATION TAB
• COMPLETE ALL COLUMNS OF THE DATA FLOW
WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB
• COMPLETE ALL COLUMNS OF THE SYSTEM INTERFACES
WORKSHEET WITHIN THE SYSTEM REGISTRATION TAB
• MFR TAB (DRAFT)
• DRAFT SANITATION PROCEDURE
SECOND SUBMISSION DUE 30 CALENDAR
DAYS AFTER CDR IPR
• DRAFT CYBERSECURITY SYSTEM ADMINISTRATOR
GUIDE (CSAG)
• FINAL SANITATION PROCEDURE
THIRD SUBMISSION DUE 25 CALENDAR
DAYS PRIOR TO THE START OF IT-C1 FOR
THE FIRST DEVICE LOCATION AND 25
CALENDAR DAYS PRIOR TO IT-C1 FOR THE
REMAINING DEVICE.
• SELF ASSESSMENT TAB
• PLAN OF ACTION AND MILESTONES (POA&M) RESULTS
FROM SELF ASSESSMENT (TO INCLUDE ALL FINDINGS
FROM VULNERABILITY ASSESSMENT TOOLS AND
DETAILED JUSTIFICATION FOR ANY OPEN FINDINGS)
• DRAFT VENDOR COMPLIANCE TEST REPORT FOR
SOFTWARE (VCTRS)
• MFR TAB (DRAFT)
FOURTH SUBMISSION DUE 25 CALENDAR
DAYS AFTER THE START OF IT-C1 FOR
THE FIRST DEVICE LOCATION AND 25
CALENDAR DAYS AFTER THE START OF
IT-C2 FOR EACH REMAINING DEVICE.
• FINAL CSAG
FIFTH SUBMISSION DUE 10 CALENDAR
DAYS PRIOR TO THE START OF IT-C2 FOR
THE FIRST DEVICE AND 10 CALENDAR
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 7 of 37
DAYS PRIOR TO THE START OF IT-C2 FOR
THE REMAINING DEVICES.
• PLAN OF ACTION AND MILESTONES (POA&M) RESULTS
FROM FINAL VALIDATION (TO INCLUDE ALL FINDINGS
FROM VULNERABILITY ASSESSMENT TOOLS AND
DETAILED JUSTIFICATION FOR ANY OPEN FINDINGS)
• MFR TAB (FINAL)
• VCTRS (FINAL)
SIXTH SUBMISSION (FINAL) DUE 25
CALENDAR DAYS AFTER THE START OF IT-
C1 FOR THE FIRST DEVICE LOCATION AND
25 CALENDAR DAYS AFTER THE START
OF IT-C2 FOR EACH REMAINING DEVICE.
5. BLK 14: NOTIFICATION LETTERS ONLY OF DELIVERABLE BEING SENT WILL BE
PROVIDED TO NAWCTSD PCO, NAWDTSD IPTL, AND NAWCTSD ENGR. THIS
DELIVERABLE SHALL BE SUBMITTED IN DIGITAL IAVA SCANNED FORMAT COMPATIABLE
WITH NAVY MARINE CORPS INTRANET (https://www.homeport.navy.mil/services/ngen-core-build); ONE COPY AS ADOBE ACROBAT DOCUMENT FORMAT (PDF) AND ONE COPY OF
TECHNICAL DOCUMENT SHALL BE PROVIDED IN MICROSOFT OFFICE 2016 COMPATIBLE
FORMAT. THE EXCRYPTED DELIVERABLES SHALL BE PROVIDED TO PMA-205 VIA DOD
SAFE (SECURE ACCESS FILE EXCHANGE) (https://safe.apps.mil). WITH NOTIFICATION
EMAIL OF CDRL AVAILABILITY TO MCAT DATA MANAGER. THE MCAT DM WILL PERFORM
THE FILE REQUEST FROM CONTRACTOR, VIA DOD SAFE, AFTER RECEIPT OF EMAIL
NOTIFICATION.
J. VARGAS OCASIO, MCATS ISSO 14 March 2024
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 8 of 37
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
CLIN 0002, 1002, 2002, 3002, 4002, 5002,
A TDP _____ TM _____ OTHER SESS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
MCAT MODERNIZATION PROGRAM –
DEVICE 2H166A & 2H166B
N6134024R0007
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A006 ENGINEERING CHANGE PROPOSAL (ECP) N/A
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-SESS-80639E SOW 230027, PARA 3.2.1.9.2 PMA205
a. ADDRESSEE
b. COPIES
Final
1. BLK 8: TECHNICAL APPROVAL SHALL BE FOR COMPLETE, COMPLIANT FULFILLMENT OF
30 CALENDAR DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION.
THE CONTRACTOR SHALL HAVE 15 CALENDAR DAYS TO CORRECT AND RESUBMIT
REJECTED MATERIALS. APPROVAL OF THE FINAL DELIVERABLE SHALL NOT BE
CONSIDERED AS APPROVAL OF THE ENGINEERING CHANGE PROPOSAL. NOTIFICATION
OF ENGINEERING CHANGE PROPOSAL APPROVAL/DISAPPROVAL SHALL BE BY SECOR
AND REQUIRED CONTRACTING ACTIONS SHOULD THE ECP BE APPROVED.
2. BLK 9: SEE ATTACHMENT: (7) TITLED ‘CONTRACT DATA REQUIREMENTS LIST (CDRL)
CONTROLLED UNCLASSIFIED INFORMATION (CUI) BLOCK 9 RELATED ANNOTATIONS’.
3. BLK 10, BLK 12, BLK 13: SUBMISSION SHALL BE DUE AS REQUIRED, WITHIN 30 CALENDAR
DAYS AFTER THE IDENTIFICATION OF AN ENGINEERING CHANGE, THROUGH END OF
CONTRACT.
4. BLK 14: NOTIFICATION LETTERS ONLY OF DELIVERABLE BEING SENT WILL BE PROVIDED
TO NAWCTSD PCO, NAWDTSD IPTL, AND NAWCTSD ENGR. THIS DELIVERABLE SHALL BE
SUBMITTED IN DIGITAL IAVA SCANNED FORMAT COMPATIABLE WITH NAVY MARINE
CORPS INTRANET (https://www.homeport.navy.mil/services/ngen-core-build); ONE COPY AS
ADOBE ACROBAT DOCUMENT FORMAT (PDF) AND ONE COPY OF TECHNICAL DOCUMENT
SHALL BE PROVIDED IN MICROSOFT OFFICE 2016 COMPATIBLE FORMAT. THE EXCRYPTED
DELIVERABLES SHALL BE PROVIDED TO PMA-205 VIA DOD SAFE (SECURE ACCESS FILE
EXCHANGE) (https://safe.apps.mil). WITH NOTIFICATION EMAIL OF CDRL AVAILABILITY TO
MCAT DATA MANAGER. THE MCAT DM WILL PERFORM THE FILE REQUEST FROM
CONTRACTOR, VIA DOD SAFE, AFTER RECEIPT OF EMAIL NOTIFICATION.
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 9 of 37
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
CLIN 0002, 1002, 2002, 3002,
4002, 5002, 6002
A TDP _____ TM _____ OTHER SESS
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
MCAT MODERNIZATION PROGRAM –
DEVICE 2H166A & 2H166B
N6134024R0007
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A007 REQUEST FOR VARIANCE (RFV) N/A
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-SESS-80640E SOW 230027, PARA 3.2.1.9.2 PMA205
a. ADDRESSEE
b. COPIES
Final
A N/A N/A draft reg repr
16. REMARKS
1. BLK 8: TECHNICAL APPROVAL SHALL BE FOR COMPLETE, COMPLIANT FULFILLMENT
OF CONTENT AND REQUIREMENTS OF BLOCK 4 AUTHORITY. THE GOVERNMENT WILL
HAVE 30 CALENDAR DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH
SUBMISSION. THE CONTRACTOR SHALL HAVE 15 CALENDAR DAYS TO CORRECT AND
RESUBMIT REJECTED MATERIALS.
2. BLK 9: SEE ATTACHMENT: (7) TITLED ‘CONTRACT DATA REQUIREMENTS LIST (CDRL)
CONTROLLED UNCLASSIFIED INFORMATION (CUI) BLOCK 9 RELATED ANNOTATIONS’.
3. BLK 10, BLK 12, AND BLK 13: SUBMISSION SHALL BE DUE AS REQUIRED, WITHIN 30
CALENDAR DAYS AFTER THE IDENTIFICATION OF A VARIANCE, THROUGH END OF
CONTRACT. BLK 14: DIGITAL MEDIA SHALL BE IN MICROSOFT WORD 2016
COMPATIBLE FORMAT. SUBMISSIONS SHALL BE VIA EMAIL ADDRESSES PROVIDED IN
THE CONTRACT OR CD/DVD-ROM.
4. NOTIFICATION LETTER ONLY OF DELIVERABLE BEING SENT WILL BE PROVIDED TO
NAWCTSD PCO. THIS DELIVERABLE SHALL BE SUBMITTED IN DIGITAL IAVA SCANNED
FORMAT COMPATIABLE WITH NAVY MARINE CORPS INTRANET
(https://www.homeport.navy.mil/services/ngen-core-build); ONE COPY AS ADOBE ACROBAT
DOCUMENT FORMAT (PDF) AND ONE COPY OF TECHNICAL DOCUMENT SHALL BE
PROVIDED IN MICROSOFT OFFICE 2016 COMPATIBLE FORMAT. THE EXCRYPTED
DELIVERABLES SHALL BE PROVIDED TO PMA-205 VIA DOD SAFE (SECURE ACCESS
FILE EXCHANGE) (https://safe.apps.mil). WITH NOTIFICATION EMAIL OF CDRL
AVAILABILITY TO MCAT DATA MANAGER. THE MCAT DM WILL PERFORM THE FILE
REQUEST FROM CONTRACTOR, VIA DOD SAFE, AFTER RECEIPT OF EMAIL
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 10 of 37
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
CLIN 0002, 1002, 2002, 3002,
4002, 5002, 6002
A TDP _____ TM _____ OTHER MSSM
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
MCAT MODERNIZATION PROGRAM –
DEVICE 2H166A & 2H166B
N6134024R0007
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A008
SYNTHETIC ENVIRONMENT DATABASE DESIGN
DOCUMENT (SEDDD)
N/A
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MSSM-82158A SOW 230027, PARA 3.1.1 PMA205
2TIMES/R SEE BLK 16
a. ADDRESSEE
b. COPIES
Final
GOVERNMENT WILL HAVE 30 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE
15 CALENDAR DAYS TO CORRECT AND RESUBMIT REJECTED MATERIALS.
2. BLK 9: SEE ATTACHMENT: (7) TITLED ‘CONTRACT DATA REQUIREMENTS LIST
(CDRL) CONTROLLED UNCLASSIFIED INFORMATION (CUI) BLOCK 9 RELATED
ANNOTATIONS’.
3. THE SEDDD SHALL BE FREE OF ALL PROPRIETARY MARKINGS.
4. BLK 12: FIRST (DRAFT) SUBMITTAL SHALL BE DUE 30 CALENDAR DAYS PRIOR TO
CRITICAL DESIGN REVIEW (CDR) AND SHALL INCLUDE THE CONTENT REQUIRED
IN SECTIONS 3.1, 3.2, 3.3, 3.4, 3.5, AND 3.6.
5. BLK 13: FINAL SUBMITTAL SHALL BE A COMPLETE DELIVERY DUE 30 CALENDAR
DAYS AFTER ACCEPTANCE OF THE SYNTHETIC ENVIRONMENT DATABASE
(CLOSURE OF ALL SYNTHETIC ENVIRONMENT DATABASE STRs AND DRs) AND
SHALL INCLUDE UPDATES TO SECTIONS 3.1, 3.2, 3.3, 3.4, 3.5, AND 3.6.
6. BLK 13: REVISIONS SHALL BE DUE AS REQUIRED THROUGH THE END OF THE
CONTRACT.
7. BLK 14: NOTIFICATION LETTER ONLY OF DELIVERABLE BEING SENT WILL BE
PROVIDED TO NAWCTSD PCO AND NAWCTSD PM. THIS DELIVERABLE SHALL BE
SUBMITTED IN DIGITAL IAVA SCANNED FORMAT COMPATIABLE WITH NAVY
MARINE CORPS INTRANET (https://www.homeport.navy.mil/services/ngen-core-build);
ONE COPY AS ADOBE ACROBAT DOCUMENT FORMAT (PDF) AND ONE COPY OF
TECHNICAL DOCUMENT SHALL BE PROVIDED IN MICROSOFT OFFICE 2016
COMPATIBLE FORMAT. THE EXCRYPTED DELIVERABLES SHALL BE PROVIDED TO
PMA-205 VIA DOD SAFE (SECURE ACCESS FILE EXCHANGE) (https://safe.apps.mil).
WITH NOTIFICATION EMAIL OF CDRL AVAILABILITY TO MCAT DATA MANAGER.
THE MCAT DM WILL PERFORM THE FILE REQUEST FROM CONTRACTOR, VIA DOD
SAFE, AFTER RECEIPT OF EMAIL NOTIFICATION.
T. NGUYEN, MCAT VSE 14 March 2024
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 11 of 37
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
CLIN 0002, 1002, 2002, 3002,
4002, 5002, 6002
A TDP _____ TM _____ OTHER ADMN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
MCAT MODERNIZATION PROGRAM –
DEVICE 2H166A & 2H166B
N6134024R0007
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A009
REVISIONS TO EXISTING GOVERNMENT
DOCUMENTS
SYSTEM /SUBSYSTEM SPECIFICATION (SSS)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-ADMN-80925A SOW 230027, PARA 3.2.4.1 PMA205
a. ADDRESSEE
b. COPIES
Final
1. BLK 8: TECHNICAL APPROVAL REQUIRED FOR PRODUCT TO DEVICE
CONFIGURATION ALIGNMENT AND CONFORMANCE TO DI-IPSC-81431A. THE
GOVERNMENT WILL HAVE 30 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE
20 CALENDAR DAYS TO CORRECT AND RESUBMIT REJECTED MATERIALS.
2. BLK 9: SEE ATTACHMENT: (7) TITLED ‘CONTRACT DATA REQUIREMENTS LIST
(CDRL) CONTROLLED UNCLASSIFIED INFORMATION (CUI) BLOCK 9 RELATED
ANNOTATIONS’.
3. BLK10: REVISIONS SHALL BE DUE AS REQUIRED THROUGH THE END OF
CONTRACT WHEN THERE IS ADDITIONAL REQUIREMENT(S) OR REQUIREMENT
CHANGE(S).
4. BLK 12: FIRST SUBMISSION SHALL BE DUE 21 CALENDAR DAYS PRIOR TO SRR-
II/SFR IPR.
5. BLK 13: SECOND SUBMISSION SHALL BE DUE 21 CALENDAR DAYS PRIOR TO CDR
IPR.
6. BLK 14: NOTIFICATION LETTER ONLY OF DELIVERABLE BEING SENT WILL BE
PROVIDED TO NAWCTSD PCO AND NAWCTSD IPTL. THIS DELIVERABLE SHALL BE
SUBMITTED IN DIGITAL IAVA SCANNED FORMAT COMPATIABLE WITH NAVY MARINE
CORPS INTRANET (https://www.homeport.navy.mil/services/ngen-core-build); ONE COPY
AS ADOBE ACROBAT DOCUMENT FORMAT (PDF) AND ONE COPY OF TECHNICAL
DOCUMENT SHALL BE PROVIDED IN MICROSOFT OFFICE 2016 COMPATIBLE
FORMAT. THE EXCRYPTED DELIVERABLES SHALL BE PROVIDED TO PMA-205 VIA
DOD SAFE (SECURE ACCESS FILE EXCHANGE) (https://safe.apps.mil). WITH
NOTIFICATION EMAIL OF CDRL AVAILABILITY TO MCAT DATA MANAGER. THE MCAT
DM WILL PERFORM THE FILE REQUEST FROM CONTRACTOR, VIA DOD SAFE,
AFTER RECEIPT OF EMAIL NOTIFICATION.
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 12 of 37
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
CLIN 0002, 1002, 2002, 3002, 4002,
5002, 6002
A TDP _____ TM _____ OTHER ADMN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
MCAT MODERNIZATON PROGRAM –
DEVICE 2H166A & 2H166B
N6134024R0007
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A00A
REVISIONS TO EXISTING GOVERNMENT
DOCUMENTS
SYSTEM/SUBSYSTEM DESIGN DESCRIPTION
(SSDD)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-ADMN-80925A SOW 230027, PARA 3.2.4.3 PMA205
a. ADDRESSEE
b. COPIES
Final
CONFIGURATION ALIGNMENT AND CONFORMANCE TO DI-IPSC-81432A.THE
GOVERNMENT WILL HAVE 30 CALENDAR DAYS FOR REVIEW AND
ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 15
CALENDAR DAYS TO CORRECT AND RESUBMIT REJECTED MATERIALS.
2. BLK 9: SEE ATTACHMENT: (7) TITLED ‘CONTRACT DATA REQUIREMENTS LIST (CDRL)
CONTROLLED UNCLASSIFIED INFORMATION (CUI) BLOCK 9 RELATED
ANNOTATIONS’.
3. BLK10: REVISIONS SHALL BE DUE AS REQUIRED THROUGH THE END OF CONTRACT
WHEN THERE IS A DESIGN CHANGE.
4. BLK 12: FIRST (DRAFT) SUBMISSION SHALL BE DUE 21 CALENDAR DAYS PRIOR TO
CDR IPR.
5. BLK 13: SUBSEQUENT SUBMISSIONS SHALL BE DUE 120 CALENDAR DAYS AFTER
CDR IPR
6. BLK 14: NOTIFICATION LETTER ONLY OF DELIVERABLE BEING SENT WILL BE
PROVIDED TO NAWCTSD PCO AND NAWCTSD IPTL. THIS DELIVERABLE SHALL BE
SUBMITTED IN DIGITAL IAVA SCANNED FORMAT COMPATIABLE WITH NAVY MARINE
CORPS INTRANET (https://www.homeport.navy.mil/services/ngen-core-build); ONE COPY
AS ADOBE ACROBAT DOCUMENT FORMAT (PDF) AND ONE COPY OF TECHNICAL
DOCUMENT SHALL BE PROVIDED IN MICROSOFT OFFICE 2016 COMPATIBLE FORMAT.
THE EXCRYPTED DELIVERABLES SHALL BE PROVIDED TO PMA-205 VIA DOD SAFE
(SECURE ACCESS FILE EXCHANGE) (https://safe.apps.mil). WITH NOTIFICATION EMAIL
OF CDRL AVAILABILITY TO MCAT DATA MANAGER. THE MCAT DM WILL PERFORM
THE FILE REQUEST FROM CONTRACTOR, VIA DOD SAFE, AFTER RECEIPT OF EMAIL
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 13 of 37
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
CLIN 0002, 1002, 2002, 3002,
4002, 5002, 6002
A TDP _____ TM _____ OTHER ADMN
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
MCAT MODERNIZATION PROGRAM –
DEVICE 2H166A & 2H166B
N6134024R0007
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A00B
REVISIONS TO EXISTING GOVERNMENT
DOCUMENTS
SOFTWARE PRODUCT DESIGN (SPD)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-ADMN-80925A SOW 230027, PARA 3.2.4.9.1 PMA205
a. ADDRESSEE
b. COPIES
Final
A N/A SEE BLK 16 draft reg repr
16. REMARKS
1. BLK 8: TECHNICAL APPROVAL REQUIRED FOR PRODUCT TO DEVICE CONFIGURATION
ALIGNMENT AND CONFORMANCE TO DI-SESS-82036 THE GOVERNMENT WILL HAVE 30
CALENDAR DAYS FOR REVIEW AND ACCEPTANCE/ REJECTION OF EACH SUBMISSION.
REJECTED MATERIAL SHALL BE CORRECTED AND RESUBMITTED WITHIN 15
CALENDAR DAYS. ACCEPTED MATERIAL WITH COMMENTS SHALL BE INCOPORATED
INTO THE NEXT SCHEDULED SUBMISSION
2. BLK 9: SEE ATTACHMENT: (7) TITLED ‘CONTRACT DATA REQUIREMENTS LIST (CDRL)
CONTROLLED UNCLASSIFIED INFORMATION (CUI) BLOCK 9 RELATED ANNOTATIONS’.
3. BLK 10: AFTER THE COMPLETION OF SIRM, REVISIONS SHALL BE DUE 30 DAYS AFTER
DESIGN CHANGES ARE IDENTIFIED OR ADDITIONAL REQUIREMENT CHANGES ARE
INCORPORATED INTO THE CONTRACT.
4. BLK 12: FIRST SUBMISSION SHALL BE DUE 30 CALENDAR DAYS PRIOR TO CDR IPR.
5. BLK 13: SECOND SUBMISSION SHALL BE DUE 15 CALENDAR DAYS PRIOR TO SIRM.
6. BLK 14: THIS DELIVERABLE SHALL BE SUBMITTED IN DIGITAL IAVA SCANNED FORMAT
COMPATIABLE WITH NAVY MARINE CORPS INTRANET
(https://www.homeport.navy.mil/services/ngen-core-build); ONE COPY AS ADOBE ACROBAT
DOCUMENT FORMAT (PDF) AND ONE COPY OF TECHNICAL DOCUMENT SHALL BE
PROVIDED IN MICROSOFT OFFICE 2016 COMPATIBLE FORMAT. THE EXCRYPTED
DELIVERABLES SHALL BE PROVIDED TO PMA-205 VIA DOD SAFE (SECURE ACCESS
FILE EXCHANGE) (https://safe.apps.mil). WITH NOTIFICATION EMAIL OF CDRL
AVAILABILITY TO MCAT DATA MANAGER. THE MCAT DM WILL PERFORM THE FILE
REQUEST FROM CONTRACTOR, VIA DOD SAFE, AFTER RECEIPT OF EMAIL
T. NACHTRAB, MCAT LSE 14 March 2024
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 14 of 37
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
CLIN 0002, 1002, 2002, 3002, 4002,
5002, 6002
B TDP _____ TM _____ OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
MCAT MODERNIZATION PROGRAM –
DEVICE 2H166A & 2H166B
N6134024R0007
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
B001
CONTRACTOR PROGRESS, STATUS, AND
MANAGEMENT REPORT (CPSMR)
N/A
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MGMT-81928 SOW 230027, PARA 3.2.1 PMA205
MTHLY SEE BLK 16
a. ADDRESSEE
b. COPIES
Final
A N/A SEE BLK 16 draft reg repr
16. REMARKS
1. BLK 8: TECHNICAL APPROVAL SHALL BE FOR COMPLETE, COMPLIANT FULFILLMENT
OF CONTENT AND REQUIREMENTS OF BLOCK 4 AUTHORITY. THE GOVERNMENT
WILL HAVE 14 CALENDAR DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF
EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 15 CALENDAR DAYS TO
CORRECT AND RESUBMIT REJECTED MATERIALS. ACCEPTED MATERIAL WITH
COMMENTS SHALL BE INCOPORATED INTO THE NEXT SCHEDULED SUBMISSION.
2. BLK 9: SEE ATTACHMENT: (7) TITLED ‘CONTRACT DATA REQUIREMENTS LIST (CDRL)
CONTROLLED UNCLASSIFIED INFORMATION (CUI) BLOCK 9 RELATED
ANNOTATIONS’.
3. BLK 12: FIRST SUBMISSION SHALL BE DUE 45 CALENDAR DAYS AFTER CONTRACT
AWARD.
4. BLK 13: SUBSEQUENT SUBMISSIONS SHALL BE DUE NO LATER THAN THE 15TH OF
EACH MONTH THROUGH END OF CONTRACT.
5. BLK 14: DIGITAL MEDIA SHALL BE IN MICROSOFT WORD 2010 COMPATIBLE FORMAT.
SUBMISSIONS SHALL BE VIA EMAIL ADDRESSES PROVIDED IN THE CONTRACT OR
CD/DVD-ROM.
6. MULTIPLE DEVICE CPSMR EXHIBITS MAY BE COMBINED INTO A SINGLE REPORT
WITH SUBSECTIONS DESCRIBING THE STATUS OF EACH TRAINING DEVICE.
7. BLK 14: NOTIFICATION LETTER ONLY OF DELIVERABLE BEING SENT WILL BE
PROVIDED TO NAWCTSD PCO. THIS DELIVERABLE SHALL BE SUBMITTED IN DIGITAL
IAVA SCANNED FORMAT COMPATIABLE WITH NAVY MARINE CORPS INTRANET
(https://www.homeport.navy.mil/services/ngen-core-build); ONE COPY AS ADOBE ACROBAT
DOCUMENT FORMAT (PDF) AND ONE COPY OF TECHNICAL DOCUMENT SHALL BE
PROVIDED IN MICROSOFT OFFICE 2016 COMPATIBLE FORMAT. THE EXCRYPTED
DELIVERABLES SHALL BE PROVIDED TO PMA-205 VIA DOD SAFE (SECURE ACCESS
FILE EXCHANGE) (https://safe.apps.mil). WITH NOTIFICATION EMAIL OF CDRL
AVAILABILITY TO MCAT DATA MANAGER. THE MCAT DM WILL PERFORM THE FILE
REQUEST FROM CONTRACTOR, VIA DOD SAFE, AFTER RECEIPT OF EMAIL
A. BERMUDEZ, MCAT IPTL 14 March 2024
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 15 of 37
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.
Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in BLK E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
CLIN 0002, 1002, 2002, 3002, 4002,
5002, 6002
B TDP _____ TM _____ OTHER MGMT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
MCAT MODERNIZATION PROGRAM –
DEVICE 2H166A & 2H166B
N6134024R0007
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
B002
INTEGRATED PROGRAM MANAGEMENT DATA AND
ANALYSIS REPORT (IPMDAR)
INTEGRATED MASTER SCHEDULE (IMS)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MGMT-81861C
SOW 230027, PARA 3.2.1.1 &
3.2.1.7
PMA205
MTHLY SEE BLK 16
a. ADDRESSEE
b. COPIES
Final
N/A N/A SEE BLK 16 draft reg repr
BLOCK 4 “AUTHORITY” - THE CONTRACTOR SHALL PROVIDE MONTHLY IPMDARS PER DID DI-
MGMT-81861C EXCEPT AS MODIFIED AND SPECIFIED PER THE FOLLOWING:
1. PARAGRAPH 1.2.1 CONTRACT PERFORMANCE DATASET (CPD)’: CONTRACT
PERFORMANCE DATASET (CPD) IS NOT APPLICABLE TO THIS CDRL.
2. PARAGRAPH 1.2.2 SCHEDULE (COMPRISED OF BOTH THE NATIVE SCHEDULE FILE AND
THE SCHEDULE PERFORMANCE DATASET (SPD))’: SCHEDULE PERFORMANCE DATASET
(SPD) IS NOT APPLICABLE TO THIS CDRL.
3. PARAGRAPH 1.2.3 PERFORMANCE NARRATIVE REPORT (COMPRISED OF BOTH THE
EXECUTIVE SUMMARY AND THE DETAILED ANALYSIS REPORT)’: ONLY NARRATIVE
ANALYSIS OF DATA PROVIDED IN THE SCHEDULE IS APPLICABLE TO THIS CDRL.
4. PARAGRAPH 2.4.2.20 DATA DICTIONARY FOR NATIVE SCHEDULE FILE: THE FIRST
MONTHLY ANALYSIS NARRATIVE SUBMISSION FOR THE NATIVE SCHEDULE SHALL
INCLUDE THE ‘SCHEDULE ASSUMPTIONS’ AND ‘DATA DICTIONARY’. ANY CHANGE, POST-
FIRST SUBMISSION, TO THE ‘SCHEDULE ASSUMPTIONS’ OR ‘DATA DICTIONARY’
REQUIRES RE-SUBMITTAL OF THE INFORMATION WITH THE AFFECTED IPMDAR
DELIVERABLE.
5. PARAGRAPH 2.4.2.21 SCHEDULE RISK ASSESSMENT (SRA):
SRAS SHALL BE CONDUCTED ON A SEMIANNUAL BASIS. ADDITIONALLY, AN SRA CAN
BE PERFORMED OUTSIDE OF ROUTINE SCHEDULED OCCURRENCES, AT THE
REQUEST OF THE GOVERNMENT, PARTICULARLY WHEN SCHEDULE IS A
SIGNIFICANT CONCERN FOR THE GOVERNMENT DUE TO OPERATIONAL
REQUIREMENTS, FUNDING LIMITATIONS, OR WHEN SCHEDULING IS CONSIDERED A
MAJOR RISK ELEMENT TO THE ACQUISITION EFFORT.
UNLESS OTHERWISE DIRECTED BY THE GOVERNMENT, THE FOLLOWING SHALL
APPLY:
INDIVIDUAL, VICE ‘GLOBAL’, RISK INPUTS (E.G. THREE-POINT ESTIMATES) AND
RATIONALE SHALL BE DEVELOPED AND APPLIED TO ALL TASKS ON THE FOLLOWING
PATHS:
1) PRIMARY CRITICAL PATH TO THE AGREED-UPON FINAL MAJOR PROGRAM
MILESTONE
2) DRIVING PATH TO AGREED-UPON MILESTONE(S) AND NEAR DRIVING
PATH(S) WITH LESS THAN OR EQUAL TO 10 DAYS OF FLOAT OR AS
DIRECTED BY THE GOVERNMENT.
REMAINING TASKS’ RISK INPUTS (E.G. THREE-POINT ESTIMATES) AND RATIONALE
SHALL BE INDIVIDUALLY OR GLOBALLY APPLIED.
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 16 of 37
RISK/OPPORTUNITY ITEMS THAT HAVE THE POTENTIAL TO IMPACT SCHEDULE
SHALL BE EVALUATED AS PART OF THE SRA PROCESS AND MODELED AS
NECESSARY.
6. PARAGRAPH 2.4.3.2 RESOURCES’: THE NATIVE SCHEDULE DELIVERABLE SHALL INCLUDE
ALL RESOURCE LOADED INFORMATION UTILIZED BY THE CONTRACTOR’S BUSINESS
SYSTEM(S) PRACTICES. THE ‘DATA DICTIONARY’ WILL DEFINE APPLICABLE FIELDS AND
THE ‘SCHEDULE ASSUMPTIONS’ WILL DESCRIBE WHEN THE RESOURCE LOADED
INFORMATION IS UTILIZED AND UPDATED.
7. BLK 8: TECHNICAL APPROVAL SHALL BE FOR COMPLETE, COMPLIANT FULFILLMENT OF
14 CALENDAR DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION.
THE CONTRACTOR SHALL HAVE 7 CALENDAR DAYS TO CORRECT AND RESUBMIT
REJECTED MATERIALS. ACCEPTED MATERIAL WITH COMMENTS SHALL BE INCOPORATED
INTO THE NEXT SCHEDULED SUBMISSION.
8. BLK 9: SEE ATTACHMENT: (7) TITLED ‘CONTRACT DATA REQUIREMENTS LIST (CDRL)
CONTROLLED UNCLASSIFIED INFORMATION (CUI) BLOCK 9 RELATED ANNOTATIONS’.
9. BLK 12: “DATE OF FIRST SUBMISSION” – INCREMENTAL DELIVERY INSTRUCTIONS:
PARAGRAPH 1.8.1 MONTHLY SUBMISSIONS REQUIREMENT’: THE IPMDAR AUTHORITATIVE
DATA CONSISTING OF THE SCHEDULE (NATIVE SCHEDULE FILE) AND PERFORMANCE
NARRATIVE (EXECUTIVE SUMMARY AND DETAILED ANALYSIS) SHALL BE SUBMITTED NO
LATER THAN 15 CALENDAR DAYS AFTER THE END OF THE FIRST FULL ACCOUNTING
PERIOD FOLLOWING AUTHORIZATION TO PROCEED (ATP).
10. BLK 13: “DATE OF SUBSEQUENT SUBMISSIONS” - INSTRUCTIONS: PARAGRAPH 1.8.1
MONTHLY SUBMISSION REQUIREMENT’: IPMDAR AUTHORITATIVE DATA CONSISTING OF
THE SCHEDULE (NATIVE SCHEDULE FILE) AND PERFORMANCE NARRATIVE (EXECUTIVE
SUMMARY AND DETAILED ANALYSIS) SHALL BE SUBMITTED NO LATER THAN 15
CALENDAR DAYS AFTER THE CLOSE OF THE CONTRACTOR’S MONTHLY ACCOUNTING
PERIOD.
11. BLK 14: NOTIFICATION LETTER ONLY OF DELIVERABLE BEING SENT WILL BE PROVIDED
TO NAWCTSD PCO. THIS DELIVERABLE SHALL BE SUBMITTED IN DIGITAL IAVA SCANNED
FORMAT COMPATIABLE WITH NAVY MARINE CORPS INTRANET
(https://www.homeport.navy.mil/services/ngen-core-build); ONE COPY AS ADOBE ACROBAT
DOCUMENT FORMAT (PDF) AND ONE COPY OF TECHNICAL DOCUMENT SHALL BE
PROVIDED IN MICROSOFT OFFICE 2016 COMPATIBLE FORMAT. THE EXCRYPTED
DELIVERABLES SHALL BE PROVIDED TO PMA-205 VIA DOD SAFE (SECURE ACCESS FILE
EXCHANGE) (https://safe.apps.mil). WITH NOTIFICATION EMAIL OF CDRL AVAILABILITY TO
MCAT DATA MANAGER. THE MCAT DM WILL PERFORM THE FILE REQUEST FROM
CONTRACTOR, VIA DOD SAFE, AFTER RECEIPT OF EMAIL NOTIFICATION..
12. IPMDAR EXHIBITS SHALL BE COMBINED INTO A SINGLE IMS FOR MUTLIPLE DEVICES.
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 17 of 37
(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.
Send completed form to the…
This is the start of the file's text. The full file is on GovTribe.