This document contains a finish plan and schedule for a Fisher House facility renovation project. The plan specifies all interior and exterior finish materials, fixtures, and furnishings down to the brand and color, including wood flooring, wall and ceiling treatments, countertops, hardware, lighting, and plumbing fixtures. Renovation work includes installing wood flooring, carpeting, ceramic and vinyl tile, wallcoverings, paint, and crown molding. The project involves upgrading life safety systems for Fisher House 1 in support of veterans. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration VISN 21 for corrections to the life safety system at the specified Fisher House location.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BEDROOM
116 113
BEDROOM
BEDROOM
HALL
112a
OFFICE
MECHANICAL
ELEVATOR
EQUIP.
ROOM
FAMILY ROOM
STORAGE
105 LAUNDRY
KITCHEN
BEDROOM
BEDROOM
HALL
125a
BEDROOM
BEDROOM
BEDROOM
121 BEDROOM
HALL
LIVING ROOM
HALL HALL
DINING ROOM
FOYER
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
DN
BEDROOM
LINEN CLOS.
200b
HALL
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
DN
HALL
HALL
200a
BEDROOM
All Trim, All Shutters
Storage, Mechanical
Granite
Storage, Mechanical
All walls w/out wall cover (Bedroom, Laundry, Storage)
Kitchen, Laundry, All Bathrooms, Cabinet Paint
If Applicable - Living Room Built-In Bookshelves
Cover Plates
(W-A) Guest Toilet (104)
(W-B) Living Rm (101) & Dining Rm (102)
(W-C) Foyer, 1st & 2nd floor Halls (100, 103/Stairwell, 112, 112a, 125, 125a, 200/back stairwell, 200a, 200b)
(W-D) Kitchen (108) Family Rm (109) Office (110)
(W-E) Bathrooms (114, 118, 122, 127, 131, 136, 205, 210, 215)
Ceilings in all Public Rms-LR, DR, Halls, Kitchen, Offices, Hall Toilet, Family Rm, All Bathrooms
White
See Lighting SpecificationsInterior Lighting
Exterior Lighting
Kitchen/Bath Countertops
Pedestal Top for Bust
Granite
Granite (Pedestal top)
White Housing
Shutter Paint
Benjamin Moore or equal - regal satin finish
Selection to follow upon installation (will arrive w/furniture)
Toilet Paper Holder
Hook
Handicap Grab Bars
Towel Bar 30"
Towel Ring
Stainless
Satin Nickel/Brass combination
Laundry Room Countertops
JVJ Hardware
JVJ Hardware - 24606 (satin nickel/polish brass)
JVJ Hardware - 24605 (satin nickel/polish brass)
JVJ Hardware - 24607 (satin nickel/polish brass)
JVJ Hardware - 24630 (satin nickel/polish brass)
JVJ Hardware - 34446 (satin nickel)
White Housing
White
Exit Lights
Emergency Lights
Sinks, Toilets, Tubs
Bust Pedastal Base Paint
Bathroom Mirrors (22)
Cabinet Knobs
Guest Toilet Mirror (1)
(P-2) Trim Paint
(P-3) Paint-Kitchen, Bath, Laundry Rm, Cabinet Paint
(P-4) LR Built In Bkcase Paint
(P-5) Ceiling Paint
(W-A) Wall Cover
All Floor and deco tile
Diagonal Layout- LR, DR, Foyer, 1st Floor Halls, Guest Toilet, All Bathrooms, Kitchen, Laundry, Family Rms
Marble Thresholds
Sculpture Pedestal Top
Vinyl Floor Edging
(P-1) Wall Paint
Vinyl Tile
Floor Tile
Grout Color
Carpeting
Decorative Tile
Wall Tile
All Bedrooms, Office
Kitchen backsplash
DalTile - 21x21 Porcelain Tile-Style:
Portenza (bid on diagonal layout)
Armstrong or equal
Roppe or equal
DalTile - 12 x 12 Porcelain Tile-Style:
Portenza (bid on diagonal layout)
Kitchen, Bath Door/ Drawer Hardware
Upstair HallwaysWood Floor
Bigelow, Mohawk, Shaw or like w/Lifeloc Laminate Backing Pad
Stair Runner Install
Tie Rods- Stair Runner
Wood Stain Color
Stairwell Wood
(W-B) Wall Cover
(W-C) Wall Cover
(W-D) Wall Cover
(W-E) Wall Cover
(W-F) Wall Cover
See Lighting Specifications
See allowance
See allowance
See allowance
See allowance
Stair Railing-Stain or Paint Handrail-Stained equal stairs Duraseal or equal -semi-gloss polyeurathane seal
JVJ Hardware
JVJ Hardware
JVJ Hardware
JVJ Hardware
JVJ Hardware
See allowance
See allowanceSelection to follow upon installation (will arrive w/furniture)
Upstairs Hallway
Stairwell
Wood Flooring
Wood Treads and Risers
Benjamin Moore or equal -regal satin finish
Duraseal or equal -semi-gloss polyeurathane seal
White or Grey- Transition Carpet to Wood/Tile
Granite
Install runners to include tie rods
Shaw or Zaroufy Tie Rods or equal
Oak as specified by Architect
SPEC DETAILS DESCRIPTION
FINISH SPECIFICATION
Wood tread with 2'9" x 8' runner for front and back stairs
(W-F) Bathrooms (119, 135, 214, 217, 203, 132)
(W-G) Bathrooms (106,115, 123, 128, 201, 208, 212)
(W-G) Wall Cover
Wallcovering Industries, Artcom - 52-54"W, 18-20 oz, vinyl
DalTile - 4 x 4 matte finish / prefabricated shower
Benjamin Moore or equal -regal satin finish
Benjamin Moore or equal -regal satin finish
Benjamin Moore or equal -regal satin finish
Benjamin Moore or equal -regal satin finish
Wallcovering Industries, Artcom - 52-54"W, 18-20 oz, vinyl
Wallcovering Industries, Artcom - 52-54"W, 18-20 oz, vinyl
Wallcovering Industries, Artcom - 52-54"W, 18-20 oz, vinyl
Wallcovering Industries, Artcom - 52-54"W, 18-20 oz, vinyl
Wallcovering Industries, Artcom - 52-54"W, 18-20 oz, vinyl
Wallcovering Industries, Artcom - 52-54"W, 18-20 oz, vinyl
Kitchen, Bath, Cabinet Door Design
Architect Selection
Handrail Type
Dining Rm Chair Rail Paint If appliceble - design and paint or stain
Benjamin Moore or equal - regal satin finish
Granite
Shower Walls and ceiling above prefab. shower stalls
Maple wood flooring
Maple wood flooring
NOTE:
MAPLE WOOD FLOORING - 2ND GRADE HARD MAPLE 3/4" THICK
SOLID, TONGUE & GROOVE PLANK FLOORING.
KILN DRIED, BACK RELIEVED AND END-MATCHED (UNFINISHED) 3"
AND 5" WIDTHS, 4' TO 10' LENGTH RANGE.
STAIN COLOR AND FINISH TO BE FIELD APPLIED.
NOTE:
THE FOLLOWING AREAS WILL HAVE CROWN MOULDING ("BOISE
MOULDING" # 1097) WITH PAINTED FINISH.
FOYER
HALLS (ALL)
DINING ROOM
LIVING ROOM
KITCHEN
FAMILY ROOM
ALL BED ROOMS AND OFFICE WILL HAVE CROWN MOULDING
("BOISE MOULDING" # 1005) WITH PAINTED FINISH.
ALL INTERIOR DOOR AND TRIM ARE FIELD PAINTED FINISH.
SEE DWG. A-9 FOR CERAMIC TILE AT PREFABRICATED SHOWER
STALLS
BEDROOM218
BEDROOM
MECHANICAL ROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM
BEDROOM137
OPEN STAIR000
HALL
FIRE STAIR
BEDROOM
BEDROOM
BEDROOM134
BEDROOM133
BEDROOM
BEDROOM
BEDROOM126
HALL125a
BEDROOM
BEDROOM
BEDROOM
HALL
HALL112a
HALL
BEDROOM
BATHROOM
BEDROOM117
116 BEDROOM
HALL - FOYER
DINING ROOM
STORAGE
LAUNDRY
FAMILY ROOM
OFFICE
BATHROOM
KITCHEN
QUEST TOILET
FOYER
LIVING ROOM
ROOM NUMBER
EPOXY FLOOR COATING
CEILING
V
IN
YL
W
AL
L
C O
V
ER
IN
G
C
ER
A M
IC
T
IL
E
W O
O D
V
IN
YL
C
O M
P.
T
IL
E
C
AR
PE
T
C
ER
A M
IC
T
IL
E
G
YP
.B D P
A
IN
TE
D
PA
IN
TE
D
G
YP
B D
V
IN
YL
C
O V E
BASEFLOOR WALLS TRIM REMARKS
W O
O D
F
LO
O R
WOOD TREAD AND RAILINGS CARPET RUNNER W/DECORATIVE RODS
ROOM NUMBER
PA
IN
TE
D
G
YP
B D
V
IN
YL
C
O M
P.
T
IL
E
V
IN
YL
W
AL
L
C O
V
ER
IN
G
W O
O D
F
LO
O R
V
IN
YL
C
O V E
C
ER
A M
IC
T
IL
E
C
AR
PE
T
W O
O D
C
ER
A M
IC
T
IL
E
G
YP
PA
IN
TE
D
TRIMWALLSBASEFLOOR CEILING REMARKS
1ST FLOOR 2ND FLOOR
W O
O D
PA
IN
TE
D W
O O
D
S
TA
IN
ED
F
IN
IS
H
W O
O D
PA
IN
TE
D W
O O
D
S
TA
IN
ED
F
IN
IS
H
FIRE STAIR001
000 OPEN STAIR WOOD TREAD AND RAILINGS CARPET RUNNER W/DECORATIVE RODS
WOOD TREAD AND RAILINGS
WOOD TREAD AND RAILINGS
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
BATHROOM
D E
S
IG
N T
E C
H A
S S
O C
IA
T
E S
A R
C H
IT
E
C T
S
D E
S
IG
N E
R S
B
R O
A D
W A
Y , N
E W
Y O
R K
, N Y
FINISH SPECIFICATION
FINISH SCHEDULE
FINISH PLAN
212.354.5668 FAX
KA F
NEW YORK, NY 10036
1501 BROADWAY, SUITE 700
212.354.5656 TEL
Foundation, Inc.
Fisher House
VHAPALCheunM1 Information Only
File details come from the government source that posted it. Updated .