EXHIBIT_W_-_BGRC_FIRING_POSITION_ASBUILT_DRAWING.pdf

PDF 86 KB Posted

Attached to
Sources Sought for DMMU - Fort Hood
Solicitation number
DOIDFBO260067
Issued by

About this file

This is an engineering drawing document titled "Drawings of Work as Built" for a Modified Record Fire Range Foxhole Details project located at Fort Hood, Texas. The drawing was prepared by the Engineering Division, Design Branch and shows detailed technical specifications for foxhole construction including wood platforms, capillary water barriers, and related structural elements.

The document contains multiple cross-sectional views labeled A through D and corresponding detail sections showing construction methods, material specifications, and dimensional requirements. Key elements depicted include foxhole wood platforms with specific measurements (ranging from 2-3 inches to 10.65 feet in various dimensions), defensive berms, direction of fire indicators, finish grades, filter fabric installations, and capillary water barrier specifications. The drawing uses standard architectural notation with "NOT TO SCALE" designations for several sections and includes compass orientation markers. Additional details show typical foxhole construction with treated timber specifications and notation that all timber shall be treated with waterproofing preservatives. The drawing references standard 90-hook installations and provides grading line information essential for proper water drainage and site preparation related to the fire range modification project.

View the file

Other files

File Type Posted
EXHIBIT_O___TC25-8_Minimum_MAT_Specification_Requirements.pdf PDF
EXHIBIT_N_-_Mandatory_Shutdown_times.pdf PDF
EXHIBIT_X_-_CCRB_FIRING_POSITION_ASBUILT_DRAWING.pdf PDF
Fort_Hood_DMMU_MAT8_SOW_23JUN26_0800_CT.pdf PDF
EXHIBIT_K_-_Target_Protection_-_July_2017.pdf PDF
EXHIBIT_F_-_1984_DMMU_Asbuilts_(2).pdf PDF
EXHIBIT_H_-_Portable_HSAT_Specifications.pdf PDF
EXHIBIT_Y_-_PKRA_FIRING_POSITION_ASBUILT_DRAWING.pdf PDF
EXHIBIT_P_-DMMU_Target_designation_reference_TAB_A___Moving_Armored_Targets_(MATs).pdf PDF
EXHIBIT_Q___Range_Locations_for_Concrete_Ammo_Points.pdf PDF
EXHIBIT_S___Target_Spare_Parts.pdf PDF
EXHIBIT_J_-_Moving_Armor_Target_(MAT)_-_Aug2017.pdf PDF
EXHIBIT_M_-_Species_List_for_Range_Seed.pdf PDF
EXHIBIT_I_-_Stationary_ArmorTarget_(SAT)_-_Aug2017.pdf PDF
EXHIBIT_E___DMMU_MAT_System_locations_and_existing_conditions.pdf PDF
EXHIBIT_Z_-_QTR_FIRING_POSITION_ASBUILT_DRAWING.pdf PDF
EXHIBIT_R_-_Range_Locations_for_Cement_Stabilization_at_Ammo_Points.pdf PDF
EXHIBIT_B___DMMU_Range_Location_Map.pdf PDF
EXHIBIT_C___DMMU_SUMMARY_MATs_Power_Centers_RLMs.pdf PDF
EXHIBIT_V_-_EXISTING_CONDITIONS_PHOTOS.pdf PDF
EXHIBIT_T_-_Water_Point.pdf PDF
EXHIBIT_L_-_Portable_Armored_Target_Protection.pdf PDF
EXHIBIT_U_-_Firing_Positions_Revision_6.pdf PDF
EXHIBIT_P_-DMMU_Target_designation_reference_TAB_B_-_Startionary_Armored_Targets_(SATs).pdf PDF
EXHIBIT_D_-_Gate_Design.pdf PDF
EXHIBIT_G_-_Range_Limit_Marker_Design.pdf PDF
EXHIBIT_A_-_FTHOOD_DMMU_Aerial.pdf PDF
EXHIBIT_F_-_1984_DMMU_Asbuilts_(1).pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .