EXHIBIT_H_-_Portable_HSAT_Specifications.pdf
PDF 210 KB Posted
- Attached to
- Sources Sought for DMMU - Fort Hood
- Solicitation number
- DOIDFBO260067
About this file
This document is an appendix containing technical specifications for a Portable H-SAT (High-frequency Satellite) system. The specifications establish minimum performance requirements for a portable lifting apparatus designed for military or tactical applications.
The H-SAT system must achieve a minimum load lift capacity of 300 pounds and complete lift and lower cycles in 12 seconds and 10 seconds respectively under zero wind conditions, with the same timing maintained at 35 mph wind speeds. The target arm assembly weighs 400 pounds and must accommodate 4"x4" standard lumber target legs. The presentation requirement mandates that a minimum of 90 percent of the target remain exposed above the berm with no part of the lifting arm exposed for direct fire. The MESH network component must support a maximum communication distance of 8 kilometers. The system must complete 20 cycles per hour with a capacity of 150 cycles per 24 hours without regenerating the power supply. Mean time between failures is specified at 5,000 cycles. The Power Requirements section is included but contains no detailed specifications in this document excerpt.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix D
Table D-3.1. H-SAT Specification Requirement
H-SAT Capability Requirement
Minimum Load Lift 300Ibs
Time to Lift/ Time to Lower 1 2 sec / 10 sec
(0 Wind)
Time to Lift/ Time to Lower 12 sec/ 10 sec
(35mph Wind)
Target Arm Weight Must be capable of accepting 4"x4"
400 lbs standard lumber target legs.
Presentation Minimum 90% of target shall be exposed above the berm with no part of lifting arm exposed for direct fire.
MESH Network
Max Distance 8 km
Cycles Per Hour / Cycles without 20 I 150 per 24 hours
Regenerating Power Supply
Mean Time between Failures 5000 cycles
Power Requirements
02 November 2021 TC 25-8 0-7
EXHIBIT H - Portable HSAT Specifications
File details come from the government source that posted it. Updated .