Exhibit M10- PV Service Schedule V5.pdf

PDF 270 KB Posted

Attached to
Little Rock and Batesville OM/FM Services
Solicitation number
47PH0221R0006
Issued by

View the file

Other files

File Type Posted
Amendment PA02 Little Rock and Batesville OM FM Reprocurement Questions and Answers Sol 47PH0221R0006.pdf PDF
Standard Form 30 Solicitation 47PH0221R0006 Amendment PA02.pdf PDF
Solicitation 47PH0221R0006 Statement of Work Little Rock and Batesville Amendment PA01.pdf PDF
Standard Form 30 Solicitation 47PH0221R0006 Amendment PA01.pdf PDF
Sign in sheet for 23 February Site Visit Solicitation 47PH0221R0006.pdf PDF
Exhibit M11 - Flag Policy REVISED Amendment PA01.pdf PDF
Standard Form 33 Solicitation 47PH0221R0006.pdf PDF
Sign in sheet for 22 February Site Visit Solicitation 47PH0221R0006.pdf PDF
Little Rock and Batesville OM_FM Reprocurement Questions and Answers Sol 47PH0221R0006.pdf PDF
Exhibit C1 - Building information Sheets REVISED Amendment PA01.pdf PDF
Solicitation 47PH0221R0006 Pre-Proposal Conference Agenda Little Rock and Batesville AR (1).pptx PPTX presentation
Exhibit M1 - Full Maintenance Quality Assurance Surveillance Plan LR Batesville.pdf PDF
Figure B-3 Pricing of Services Solicitation 47PH0221R0006 Little Rock and Batesville OM FM REVISED Amendment PA01.xlsx XLSX spreadsheet
Figure L-1 Management Plan Baseline and Worksheet REVISED Amendment PA01.xlsx XLSX spreadsheet
Exhibit M5 - Smart Buildings.pdf PDF
Exhibit M8 - Misc Best Practices Shave Energy.pdf PDF
Exhibit C7 - PBS Waste Audits.docx - Google Docs.pdf PDF
Figure B-2 SCA DOL_CBA Wage Adjustment Spreadsheet for Full Main Comb Union AND Non Union Contracts.xlsx XLSX spreadsheet
Exhibit M2 - Green Purchasing Report.pdf PDF
Figure B-3 Pricing of Services Solicitation 47PH0221R0006 Little Rock and Batesville OM FM.xlsx XLSX spreadsheet
Exhibit M3 - Environmental Sustainable Products.pdf PDF
Exhibit M11 - Flag Policy.pdf PDF
Solicitation 47PH0221R0006 Statement of Work Little Rock and Batesville AR.pdf PDF
Exhibit M1 and C2 - FM Quality Assurance Surveillance Plan LR Batesville.pdf PDF
Attachment 1 Local 624 CBA - GSA - Little Rock Batesville (1) (2).pdf PDF
Figure B-1 for Union and Non Union Contracts.xlsx XLSX spreadsheet
Attachment 3 US DOL Wage Determination No. 2015-5117 Rev No. 14 Dated 12.21.2020 Little Rock.pdf PDF
Exhibit C6 - Recycle Solid Waste Trash Report LR Batesville.pdf PDF
Attachment 3 US DOL Wage Determination No. 2015-5123 Rev No. 14 Dated 12.21.2020 Batesville AR.pdf PDF
Attachment 2 SF98 CBA Wage determination.pdf PDF
Exhibit M7 - Qualificaiton of Electrical Testing Technicians.pdf PDF
Exhibit C4 - Building Exterior and Hardscape Plan LR Batesville.pdf PDF
Figure L-2 Past Performance Questionnaire Solicitation No. 47PH0221R0006.pdf PDF
Exhibit C5 - Erosion and Sediment Control LR Batesville.pdf PDF
Exhibit C1 - BLDG INFO 47PH0221R0006.pdf PDF
Exhibit M9 - PM 2018 GSA OM Guide.pdf PDF
Exhibit M6 - Water Treatment .pdf PDF
Figure L-1 Management Plan Worksheet LR Batesville.xlsx XLSX spreadsheet
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit M10

Item

PV Service Description

Frequency/ Response

Time

Visual inspection of Solar Facility’s general site conditions, PV arrays, electrical equipment, mounting structure, fence, shading, trackers, vegetation, animal damage, erosion, corrosion, and discolored panels.

Every 6 months

Visual inspection and correction of Solar Facility for loose electrical connections and ground connections.

String-level open-circuit voltage, DC operating current tests, and I-V curve traces on 100% of all strings.

1x per year

4 All switches and disconnects tested to ensure they are not jammed.

Infrared scans on 100% combiner and re-combiner boxes; tighten connections to manufacturer's torque specification; report broken terminal blocks.

Every 3 years

100% check calibration expiration on sensors and meters, including pyranometers, and anemometers and perform other service such as cleaning and replacement of any desiccant.

Turn off and on logging and communications to ensure they are communicating and ensure battery backups are working.

Inverter preventive maintenance for 100% of all inverters per manufacturer’s operating guidelines

See

8a,8b,8c & 8d

8a Clean inverter cabinet air vents.

8b Clean and change inverter air filters, if present, per manufacturer’s warranty requirements.

8c Clean/remove dust from inverter heat sinks per manufacturer’s warranty requirements.

8d Check torque marks and re-tightening appropriate wiring connections to design specification torque force per manufacturer’s guidelines.

9 Inspect roof penetrations to ensure sealant is applied properly and not degrading.

10 PV array module maintenance for all modules See 10a & 10b

10a Wash all panels with water with no chemicals in a method approved by the

Owner.

10b Perform infrared scan of 100% of modules for two types of circuitry connections: cells on the front and junction boxes on the back.

Every 3 years

*Adapted from the following authority:

Technical Report

NREL/TP-7A40-73822

December 2018

File details come from the government source that posted it. Updated .