EXHIBIT
C5
EROSION AND SEDIMENT
CONTROL
IPM, Erosion Control, Landscape Management Plan 1
Used only when Contractor is required to perform activities that disturbs the existing grounds conditions
The Contractor shall employ strategies such as temporary and permanent seeding, mulching, earth dikes, silt fencing, sediment traps and sediment basins to correct existing erosion such as typically found as the result of foot traffic killing the vegetation, steep slopes where sheet flow from storm water exceeds existing vegetation holding power, or point storm water outflow that exceeds the holding power of the vegetation covering the soil. The Contractor shall submit to the CO an IPM Erosion Control, Landscape Management Plan outlining how this will be accomplished. At a minimum, the custodial and related services portion of the plan shall address the following items:
• Goals and Scope
• Responsible Parties
• Guidance for Resources and Implementation
• Performance Measurement
• Training
• Chemical Treatment Purchasing and
Application
• Integrated Pest Management
(IPM)
• Erosion and Sediment Control
• Storm-Water Management Plan
• Landscape Management and Grounds Maintenance
Composting
• Quality Assurance/Quality Control Processes
1 This is a sample and is not intended to be comprehensive. Excerpts are from United
States Green Building Council (USGBC).