Amendment PA02 Little Rock and Batesville OM FM Reprocurement Questions and Answers Sol 47PH0221R0006.pdf

PDF 98 KB Posted

Attached to
Little Rock and Batesville OM/FM Services
Solicitation number
47PH0221R0006
Issued by

View the file

Other files

File Type Posted
Standard Form 30 Solicitation 47PH0221R0006 Amendment PA02.pdf PDF
Solicitation 47PH0221R0006 Statement of Work Little Rock and Batesville Amendment PA01.pdf PDF
Standard Form 30 Solicitation 47PH0221R0006 Amendment PA01.pdf PDF
Sign in sheet for 23 February Site Visit Solicitation 47PH0221R0006.pdf PDF
Exhibit M11 - Flag Policy REVISED Amendment PA01.pdf PDF
Standard Form 33 Solicitation 47PH0221R0006.pdf PDF
Sign in sheet for 22 February Site Visit Solicitation 47PH0221R0006.pdf PDF
Little Rock and Batesville OM_FM Reprocurement Questions and Answers Sol 47PH0221R0006.pdf PDF
Exhibit C1 - Building information Sheets REVISED Amendment PA01.pdf PDF
Solicitation 47PH0221R0006 Pre-Proposal Conference Agenda Little Rock and Batesville AR (1).pptx PPTX presentation
Exhibit M1 - Full Maintenance Quality Assurance Surveillance Plan LR Batesville.pdf PDF
Figure B-3 Pricing of Services Solicitation 47PH0221R0006 Little Rock and Batesville OM FM REVISED Amendment PA01.xlsx XLSX spreadsheet
Figure L-1 Management Plan Baseline and Worksheet REVISED Amendment PA01.xlsx XLSX spreadsheet
Exhibit M5 - Smart Buildings.pdf PDF
Exhibit M8 - Misc Best Practices Shave Energy.pdf PDF
Exhibit C7 - PBS Waste Audits.docx - Google Docs.pdf PDF
Figure B-2 SCA DOL_CBA Wage Adjustment Spreadsheet for Full Main Comb Union AND Non Union Contracts.xlsx XLSX spreadsheet
Exhibit M2 - Green Purchasing Report.pdf PDF
Figure B-3 Pricing of Services Solicitation 47PH0221R0006 Little Rock and Batesville OM FM.xlsx XLSX spreadsheet
Exhibit M3 - Environmental Sustainable Products.pdf PDF
Exhibit M11 - Flag Policy.pdf PDF
Solicitation 47PH0221R0006 Statement of Work Little Rock and Batesville AR.pdf PDF
Exhibit M1 and C2 - FM Quality Assurance Surveillance Plan LR Batesville.pdf PDF
Attachment 1 Local 624 CBA - GSA - Little Rock Batesville (1) (2).pdf PDF
Figure B-1 for Union and Non Union Contracts.xlsx XLSX spreadsheet
Attachment 3 US DOL Wage Determination No. 2015-5117 Rev No. 14 Dated 12.21.2020 Little Rock.pdf PDF
Exhibit C6 - Recycle Solid Waste Trash Report LR Batesville.pdf PDF
Exhibit M10- PV Service Schedule V5.pdf PDF
Attachment 3 US DOL Wage Determination No. 2015-5123 Rev No. 14 Dated 12.21.2020 Batesville AR.pdf PDF
Attachment 2 SF98 CBA Wage determination.pdf PDF
Exhibit M7 - Qualificaiton of Electrical Testing Technicians.pdf PDF
Exhibit C4 - Building Exterior and Hardscape Plan LR Batesville.pdf PDF
Figure L-2 Past Performance Questionnaire Solicitation No. 47PH0221R0006.pdf PDF
Exhibit C5 - Erosion and Sediment Control LR Batesville.pdf PDF
Exhibit C1 - BLDG INFO 47PH0221R0006.pdf PDF
Exhibit M9 - PM 2018 GSA OM Guide.pdf PDF
Exhibit M6 - Water Treatment .pdf PDF
Figure L-1 Management Plan Worksheet LR Batesville.xlsx XLSX spreadsheet
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Little Rock/Batesville Questions and Answers Amendment PA02

Solicitation 47PH0221R0006

Q: Can the government provide the size and quan�ty of the refuse and recycling containers at this loca�on?

A: AR0031ZZ WASTE---4 CUBIC YARD DUMPSTER, DUMPED 4X PER MONTH

AR0031ZZ RECYLING—2 CUBIC YARD DUMPSTER, DUMPED 4X PER

MONTH

AR0063RK WASTE—6 CUBIC YARD DUMPSTER, DUMPED 4X PER MONTH

AR0079ZZ WASTE—8 CUBIC YARD DUMPSTER, DUMPED 8X PER MONTH

The government answer includes refuse containers at facility AR0063RK (Little Rock Federal Building). Since the Little Rock Federal Building only receives O&M services for this contract, and Solid Waste/Trash Removal and Disposal falls under custodial services, is this an error? Can the government clarify?

A No

AR0063, AR0030 and AR0085, Custodial contract covers daily trash and recycled removal for the tenants in the Triplex. The O&M needs their own dumpster due to the capacity of trash that comes for maintenance of the equipment for example air filters. Also O&M needs a metal recycling dumpster so motors and anything metal/equipment can be recycled. Dumpster are located at AR0030 by back dock.

AR0031 and AR0079 the O&M Contractor is responsible for all.

Q: Solid Waste/Trash Removal and Disposal (C.9.10.1.2) Which buildings require waste and trash removal?

A: AR0079ZZ, AR0063RK, and AR0031ZZ.

Can the government clarify trash disposal services at facility AR0063RK (Little Rock Federal Building)?

A: For trash & recycling removal removal for the tenants in the Triplex. The O&M needs their own dumpster due to the capacity of trash that comes for maintenance of the equipment for example air metal/equipment can be recycled.

Q: Solid Waste/Trash Removal and Disposal (C.9.10.1.2) Can the Government provide the number of containers and size of containers at each location?

A: AR0031ZZ WASTE---4 CUBIC YARD DUMPSTER, DUMPED 4X PER

MONTH

AR0031ZZ RECYCLING—2 CUBIC YARD DUMPSTER, DUMPED 4X PER

MONTH

AR0063RK WASTE—6 CUBIC YARD DUMPSTER, DUMPED 4X PER

MONTH

AR0079ZZ WASTE—8 CUBIC YARD DUMPSTER, DUMPED 8X PER

MONTH

Can the government clarify trash disposal services at facility AR0063RK (Little Rock Federal Building)?

A: For trash & recycling removal removal for the tenants in the Triplex. The O&M needs their own dumpster due to the capacity of trash that comes for maintenance of the equipment for example air metal/equipment can be recycled.

Q: Reference: C.1.9.2 Operations, NCMMS Basic Requirements, Note: q. Create asset specific lock out tag out procedures. This goes beyond the OSHA requirements. OSHA allows Energy Control Procedures (LOTO procedures as GSA identifies them) for similar equipment as l ong as the controls are similar. The way this i s written, is GSA stating the contractor is required to create a separate ECP for each asset and then attach i t to each asset i n the NCMMS? This is a tremendous labor-intensive undertaking and sharing company safety resources for the next contractor. ECP’s are company owned data.

Question 1: What documents are required to be uploaded to the NCMMS?

Question 2: Is the contractor required to gather all the data for the NCMMS when GSA performs a project or will i t be provided by the GSA Project Management Team?

Will there be an additional amendment to clarify C.1.9.2 “q”?

A: LOTO procedures are based upon and inspected to the contractors OSHA approved LOTO program. C.1.9.2 "q" needs clarification. We do not expect the O&M to load a LOTO procedure on each asset. We do expect them to have an approved LOTO program overall. .

Q: As the proposal requires resumes for all key personnel including Project Manager, Chief Engineer, On-Site Supervisor, Administrative Clerk, General Maintenance Mechanic, HVAC Mechanic, and Custodial Supervisor and all vendors intend to retain these individuals if awarded the contract, can we get a phone number for the Admin Office for Crystal Clear(the incumbent) to request resumes?

This requirement, for the record, makes it extremely difficult for any competitive vendor. If the awardee is going to retain the current staff, and you already have their resumes on record, this requirement usually becomes an effort in futility and an impediment to competitors to submit a technical which passes the standard.

A: See Amendment PA01; Section. C.1.2.1. Has been amended. If the successful Offeror proposes to use any employee from the incumbent’s staff in a key personnel role, the successful Offeror will have thirty (30) days after award to submit resumes for incumbent positions.