Standard Form 30 Solicitation 47PH0221R0006 Amendment PA01.pdf
PDF 158 KB Posted
- Attached to
- Little Rock and Batesville OM/FM Services
- Solicitation number
- 47PH0221R0006
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PA01
7PQB
See Standard Form 30 Continuation Sheet.
Acquisition management Division, Services Branch 819 Taylor Street Room 12B01, Fort Worth, TX 76102
EQ7PMB-21-0005
47PH0221R0006
03/04/2021
02/10/2021
MatthewAPhillips Typewriter
MatthewAPhillips Typewriter
INSTRUCTIONS (Back Page):
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date).
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contracting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Items 9, (Amendment of Solicitation Number - Dated), and 10, (Modification of Contract/Order Number - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data).
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries:
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification).
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document.
Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
(i) Total contract price increased by $
(ii) Total contract price decreased by $
(iii) Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
(g)
(h)
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
(i) A reference to the letter determination; and
(ii) A statement of the net amount determined to be due in settlement of the contract.
(1)
(2)
(3)
(4)
(5)
(6)
STANDARD FORM 30 (REV. 11/2016) BACK
(1) Accounting classification Net increase $
Standard Form 30 Continuation Sheet Solicitation 47PH0221R0006
Amendment PA01
The purpose of Amendment PA01 is as follows:
1.) Upload Questions and Answers.
2.) Upload Sign-In Sheets from Site Visits.
3.) Upload “Solicitation 47PH0221R0006 Pre-Proposal Conference Agenda Little
Rock and Batesville AR.pptx”.
4.) Upload “Exhibit C1: Building Information Sheets REVISED Amendment PA01”.
This file replaces the original uploaded as an attachment to the solicitation.
5.) Upload “Figure L-1 Management Plan Baseline and Worksheet REVISED
Amendment PA01”. This file replaces the original uploaded as an attachment to the solicitation.
6.) Upload “Exhibit M11 - Flag Policy REVISED Amendment PA01”. This file replaces the original uploaded as an attachment to the solicitation.
7.) Upload “Figure B-3 Pricing of Services Solicitation 47PH0221R0006 Little Rock and Batesville OM FM REVISED Amendment PA01”. This file replaces the original uploaded as an attachment to the solicitation.
8.) Upload a Standard Form (SF) 33.
9.) The Statement of Work is amended as follows:
Section C.1.2.1 is changed from:
“The Contractor agrees to assign the contract tasks to those persons whose resumes were submitted with the proposal, or who were approved by the COR and who are necessary to fulfill the requirements of the contract as "key personnel". No substitutions may be made except in accordance with this section.
The Contractor understands that during the first ninety (90) calendar days of the contract performance period, no personnel substitutions will be permitted unless these substitutions are unavoidable because of the incumbent's sudden illness, death or termination of employment. In any of these events, the Contractor shall promptly notify the Contracting Officer and provide the information described in the paragraph below.
After the initial ninety (90) day period the Contractor must submit to the Contracting Officer all proposed substitutions, in writing, at least thirty (30) days in advance (sixty
(60) days if security clearance must be obtained) of any proposed substitution and provide the information required by the paragraph below. A vacancy of any position may result in a price deduction in accordance with Section G.”
To:
“If the offeror proposes to use any employee from the incumbent’s staff in a key personnel role, the offeror may request a substitution within 30 calendar days after award by providing a resume, for approval from the CO or designee, that demonstrates full compliance with the contract requirements. It is noted that the contract requirements of the incumbent contract may not be consistent with the current contract, therefore the contractor must ensure the proposed employee meets the minimum requirements. The government has the right to accept and/or reject any proposed personnel and/or key personnel based on past performance under any contract that the government is aware of or becomes aware of, and/or lack of qualifications. This option for substitution of employee(s) is NOT in lieu of submitting resumes of proposed key personnel at the time of proposal submission. Pursuant to FAR 52.222-41 GSA does not release the names or any information of incumbent contractor’s employees.
With the exception of the above, the Contractor understands that during the contract performance period, no personnel substitutions will be permitted unless these substitutions are unavoidable because of the incumbent's sudden illness, death, unacceptable behavior and/or performance, or termination of employment. In any of these events, the Contractor shall promptly notify the Contracting Officer and provide the information described in the paragraph below. The Contractor must submit to the Contracting Officer all proposed substitutions, in writing, at least thirty (30) days in advance (sixty (60) days if security clearance must be obtained) of any proposed substitution and provide the information required by the paragraph below. Any vacancy must be staffed and report to the site, within 30 calendar days. A vacancy of any position may result in a price deduction in accordance with Section G.”
Section C.6.3.4. is changed from:
“ The Contractor shall use high efficiency air filters when replacing the filters in air handlers and other equipment that use air filtration. The Contractor shall only use air filters with known Minimum Efficiency Reporting Value (MERV) 13 , as defined in the ANSI/ASHRAE Standard 52.2 and required in accordance with the most current PBS-P100. The Contractor shall replace air filters with the air filters that have the highest MERV value consistent with the feet per minute of the fan. The Contractor shall maintain minimum ventilation standards in ASHRAE Standard 62.1 with the current revision year. Prior to installation, the COR shall approve the filters to be used. At a minimum for an AHU with pre- and post-filters, the Con tractor shall replace the pre-filters quarterly or as deemed necessary by the Magnehelic gauges or BAS-connected monitoring devices , and the post filters annually or as deemed necessary by the Magnehelic gauges. The rooftop unit, variable air volume, power Induction unit), fan coil, computer room, or any other air distribution filters shall be changed as required by the Preventive Maintenance Plan, but at least annually .”
“ The Contractor shall use high efficiency air filters when replacing the filters in air handlers and other equipment that use air filtration. The Contractor shall only use air filters with known Minimum Efficiency Reporting Value (MERV) 11 , as defined in the ANSI/ASHRAE Standard 52.2 and required in accordance with the most current PBS-P100. The Contractor shall replace air filters with the air filters that have the highest MERV value consistent with the feet per minute of the fan. The Contractor shall maintain minimum ventilation standards in ASHRAE Standard 62.1 with the current revision year. Prior to installation, the COR shall approve the filters to be used. At a minimum for an AHU with pre- and post-filters, the Con tractor shall replace the pre-filters quarterly or as deemed necessary by the Magnehelic gauges or BAS-connected monitoring devices , and the post filters annually or as deemed necessary by the Magnehelic gauges. The rooftop unit, variable air volume, power Induction unit), fan coil, computer room, or any other air distribution filters shall be changed as required by the Preventive Maintenance Plan, but at least annually .”
Section C.9.6.8. is changed from:
“When additional cleanings are ordered as an Above Standard Service, surfaces within 10 (ten) feet of the finished floor shall be cleaned and free of dirt, dust, and cobwebs. Where glass is present, both sides shall be clean and free of streaks. This does not include the removal of vents, tiles, or fixtures. The contractor will provide necessary equipment.”
When additional cleanings are ordered as an Above Standard Service, surfaces above 10 (ten) feet of the finished floor shall be cleaned and free of dirt, dust, and cobwebs. Where glass is present, both sides shall be clean and free of streaks. This does not include the removal of vents, tiles, or fixtures. The contractor will provide necessary equipment.
Section L.2. is changed from:
“This procurement is set aside for Small Business. The services covered by this solicitation are classified as Facilities Support Services. The North American Industry Classification System (NAICS) Code is 561210. For purposes of this procurement, any concern will be classified as small business if its average annual receipts for the preceding three fiscal years do not exceed $41.5 million.”
“This procurement is 100% set-aside for Women-Owned Small Business (WOSB). The services covered by this solicitation are classified as Facilities Support Services. The North American Industry Classification System (NAICS) Code is 561210. For purposes of this procurement, any concern will be classified as small business if its average annual receipts for the preceding three fiscal years do not exceed $41.5 million.”
Section J:
- “Exhibit C2: Custodial Quality Assurance Surveillance Plan 9QASP) is reserved (See Exhibit M1).
- The title of the “Exhibit M1: Full Maintenance Quality Assurance Surveillance Plan (QASP)” is corrected.
- “Exhibit M10: PV Service Description” is Reserved and removed from the solicitation attachments.
END OF AMENDMENT DESCRIPTION.
| Standard Form 30 Solicitation 47PH0221R0006 Amendment PA01 |
| SF 30 Continuation Sheet Amendment PA01 - Google Docs |
File details come from the government source that posted it. Updated .