EXHIBIT M ELECTRICAL JOC NAICS 238210 PTO 0001.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Amendment 0005_Indefinite Delivery Indefinite Quantity, Job Order Contract for Electrical and Other Wiring Installation Projects_CPEN & SEAL BEACH
Solicitation number
N62473-20-R-0034
Issued by

View the file

Other files

File Type Posted
Revised SF1442_6.23.20.pdf PDF
N6247320R0034 Amendment 0005.pdf PDF
Exhibit I - Revised San Diego County Wage Determination 06.05.20.pdf PDF
Exhibit E Financial Questionnaire_ REVISED 6.18.20.docx DOCX document
N6247320R0034 Amendment 0004.pdf PDF
N6247320R0034 Amendment 0003.pdf PDF
N6247320R0034 Amendment 0002.pdf PDF
Exhibit E Financial Questionnaire_ REVISED.docx DOCX document
Exhibit I - Revised Orange County Wage Determination 5.29.20.pdf PDF
Exhibit I - Revised San Diego County Wage Determination 05.29.20.pdf PDF
Exhibit I - Revised Riverside County Wage Determination 5.29.20.pdf PDF
EXHIBIT M ELECTRICAL JOC NAICS 238210 PTO 0001_REVISED 6.01.20.xlsx XLSX spreadsheet
N62473-20-R-0034 Amendment 0001.pdf PDF
Exhibit N__PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf PDF
Exhibit A - Offeror Team Composition and Management.docx DOCX document
EXHIBIT K COEFFICIENT WORKSHEET with profit language 072418.docx DOCX document
Exhibit I - Riverside County Wage Determination 5.15.20.pdf PDF
Exhibit E Financial Questionnaire.docx DOCX document
Exhibit I - Orange County Wage Determination 5.15.20.pdf PDF
Exhibit B - Experience - Offeror.docx DOCX document
Exhibit H GENERIC UFGS Guides for projects.docx DOCX document
Exhibit F Surety Form.docx DOCX document
Exhibit D Safety Data.docx DOCX document
Exhibit G Revised RFI Form.docx DOCX document
Exhibit I - San Diego County Wage Determination 4.17.20.pdf PDF
Exhibit J JOC IDIQ SAMPLE SUBMITTAL REGISTER.docx DOCX document
N6247320R0034 ELECTRICAL JOC RFP.pdf PDF
Exhibit C - PPQ.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

PRE-PRICED ITEM DESCRIPTIONMEANS ITEM #QTY #QTY UNITNATIONAL AVERAGE MATERIAL (MATL) UNIT COSTMATL TOTAL COSTNATIONAL AVERAGE LABOR UNIT COSTLABOR TOTAL COSTNATIONAL AVERAGE EQUIPMENT (EQUIP) UNIT COSTEQUIP TOTAL COSTOTHER COSTOTHER TOTAL COST
Selective demolition, rubbish handling, dumpster, 6 C.Y., 2 ton capacity, weekly rental, includes one dump per week, cost to be added to demolition cost0241191906002Week$ 415.00$ 830.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Selective demolition, dump charges, typical urban city, trees, brush, lumber, includes tipping fees only0241192002005Ton$ 63.00$ 315.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Lead paint remediation, plans and methods, lead abatement remediation plan0283192102001Ea.$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ 1,225.00$ 1,225.00
Preparation of lead containment area, post abatement cleaning of protective sheeting, HEPA vacuum & wet wipe028319222400150S.F.$ 0.01$ 1.50$ 0.26$ 39.00$ - 0$ - 0$ - 0$ - 0
Preparation of lead containment area, post abatement cleaning, HEPA vacuum & wet wipe028319222500326S.F.$ 0.01$ 3.26$ 0.26$ 84.76$ - 0$ - 0$ - 0$ - 0
Selective demolition, wood framing, blocking, 2" x 6", in 16" OC wall framing0605051031728L.F.$ - 0$ - 0$ 0.84$ 6.72$ - 0$ - 0$ - 0$ - 0
Selective demolition, wood framing, window buck, 7' wide, 2 x 6 wall, 8' high, includes studs, jacks, header, rough sill, cripples and accessories0605051032882Ea.$ - 0$ - 0$ 14.05$ 28.10$ - 0$ - 0$ - 0$ - 0
Wall framing, door buck, king studs, jack studs, header and accessories, 2" x 4" wall, 6' wide, 8' high06111040013050Ea.$ 27.50$ 1,375.00$ 13.30$ 665.00$ - 0$ - 0$ - 0$ - 0
Selective demolition, thermal and moisture protection, roof accessories, skylight, to 10 S.F.0705051016207Ea.$ - 0$ - 0$ 42.00$ 294.00$ - 0$ - 0$ - 0$ - 0
Blanket insulation, for walls or ceilings, kraft faced fiberglass, 3-1/2" thick, R13, 11" wide072116200060320S.F.$ 0.34$ 108.80$ 0.37$ 118.40$ - 0$ - 0$ - 0$ - 0
Door demolition, interior door, single, 3' x 7' high, 1-3/8" thick, remove0805051005001Ea.$ - 0$ - 0$ 16.85$ 16.85$ - 0$ - 0$ - 0$ - 0
Door demolition, door frames, metal, remove0805051020001Ea.$ - 0$ - 0$ 53.00$ 53.00$ - 0$ - 0$ - 0$ - 0
Doors, overhead, commercial, stock, steel, heavy duty, sectional, manual, 24 gauge, 8' x 8' high0836131026001Ea.$ 1,125.00$ 1,125.00$ 425.00$ 425.00$ - 0$ - 0$ - 0$ - 0
Doors, overhead, commercial, stock, minimum labor/equipment charge0836131090001Job$ - 0$ - 0$ 565.00$ 565.00$ - 0$ - 0$ - 0$ - 0
Tube framing, for window walls and storefronts, aluminum, stock, plain tube frame, mill finish, 2" x 4" mullion08411320535035L.F.$ 27.50$ 962.50$ 7.10$ 248.50$ - 0$ - 0$ - 0$ - 0
Storefront systems, aluminum frame, commercial grade, minimum labor/equipment charge0843132090001Job$ - 0$ - 0$ 815.00$ 815.00$ - 0$ - 0$ - 0$ - 0
Skylight, circular, clear, double glazed, acrylic, 60" diameter0845101012507Ea.$ 4,075.00$ 28,525.00$ 283.00$ 1,981.00$ - 0$ - 0$ - 0$ - 0
Skylights, minimum labor/equipment charge0862131090007Job$ - 0$ - 0$ 835.00$ 5,845.00$ - 0$ - 0$ - 0$ - 0
Window glass, clear float, stops, putty bed, 1/8" thick08815510001550S.F.$ 4.27$ 213.50$ 1.70$ 85.00$ - 0$ - 0$ - 0$ - 0
Window glass, minimum labor/equipment charge0881551090001Job$ - 0$ - 0$ 163.00$ 163.00$ - 0$ - 0$ - 0$ - 0
Gypsum wallboard, repairs, fill and sand, dents, 2" to 4" square09017010013010Ea.$ 0.04$ 0.40$ 17.70$ 177.00$ - 0$ - 0$ - 0$ - 0
Gypsum wallboard, repairs, cut square, patch, sand and finish, holes, 8" to 12" square09017010017010Ea.$ 0.47$ 4.70$ 53.00$ 530.00$ - 0$ - 0$ - 0$ - 0
Gypsum wallboard, repairs, skim coat surface with joint compound090170100500100S.F.$ 0.04$ 4.00$ 0.27$ 27.00$ - 0$ - 0$ - 0$ - 0
Gypsum wallboard, repairs, minimum labor/equipment charge0901701090001Job$ - 0$ - 0$ 213.00$ 213.00$ - 0$ - 0$ - 0$ - 0
Ceiling demolition, suspended ceiling, mineral fiber, on suspension system, remove090505101250320S.F.$ - 0$ - 0$ 0.56$ 179.20$ - 0$ - 0$ - 0$ - 0
Flooring demolition, vinyl or rubber cove base, straight section09050520085060L.F.$ - 0$ - 0$ 0.34$ 20.40$ - 0$ - 0$ - 0$ - 0
Flooring demolition, vinyl composition tile, 12" x 12"090505200900320S.F.$ - 0$ - 0$ 0.67$ 214.40$ - 0$ - 0$ - 0$ - 0
Wall base, rubber, straight or cove, standard colors, 4" high, 1/8" thick09651313110060L.F.$ 1.43$ 85.80$ 1.26$ 75.60$ - 0$ - 0$ - 0$ - 0
Flooring, vinyl composition tile, 12" x 12" x 1/16"096519197000320S.F.$ 1.23$ 393.60$ 0.79$ 252.80$ - 0$ - 0$ - 0$ - 0
Paints & coatings, walls & ceilings, interior, masonry or concrete block, latex paint, primer plus 2 finish coats, smooth, brush0991237232001008S.F.$ 0.28$ 282.24$ 1.00$ 1,008.00$ - 0$ - 0$ - 0$ - 0
Paints & coatings, walls & ceilings, interior, minimum labor/equipment charge0991237299001Job$ - 0$ - 0$ 178.00$ 178.00$ - 0$ - 0$ - 0$ - 0
Selective demolition, blinds, interior, horizontal or vertical1205051049207L.F.$ - 0$ - 0$ 2.25$ 15.75$ - 0$ - 0$ - 0$ - 0
Blinds, interior, horizontal, solid color, stock, 1" aluminum slats12211313002050S.F.$ 5.80$ 290.00$ 0.72$ 36.00$ - 0$ - 0$ - 0$ - 0
Tension structure, 12' x 14', for roll-up door, add1331235005001Ea.$ 6,925.00$ 6,925.00$ 745.00$ 745.00$ - 0$ - 0$ - 0$ - 0
Pipe, steel, black, threaded, 1" diameter, schedule 40, Spec. A-53, includes coupling and clevis hanger assembly sized for covering, 10' OC22111344058016L.F.$ 7.80$ 124.80$ 9.75$ 156.00$ - 0$ - 0$ - 0$ - 0
Conduit, electric metallic tubing (EMT), 1/2" to 1" diameter, electrical demolition, remove conduit to 10' high, including fittings & hangers2605051002001400L.F.$ - 0$ - 0$ 1.25$ 1,750.00$ - 0$ - 0$ - 0$ - 0
Junction boxes, 4" square & octagon, electrical demolition, remove, including removal of supports and terminations26050510172036Ea.$ - 0$ - 0$ 6.15$ 221.40$ - 0$ - 0$ - 0$ - 0
Wire, THW-THWN-THHN, #12, electrical demolition, removed from in place conduit, to 15' high26050510184042C.L.F.$ - 0$ - 0$ 8.90$ 373.80$ - 0$ - 0$ - 0$ - 0
Fluorescent fixtures, interior, 4 lamp, 2' x 4', electrical demolition, remove, recessed drop-in, to 15' high, including supports & whips2605051021404Ea.$ - 0$ - 0$ 32.50$ 130.00$ - 0$ - 0$ - 0$ - 0
Fluorescent fixtures, interior, 4 lamp, 4' x 4', electrical demolition, remove, recessed drop-in, to 15' high, including supports & whips26050510216036Ea.$ - 0$ - 0$ 49.00$ 1,764.00$ - 0$ - 0$ - 0$ - 0
Wire connector, screw type, #18 to #12260519350020108Ea.$ 0.07$ 7.56$ 2.04$ 220.32$ - 0$ - 0$ - 0$ - 0
Wire, copper, stranded, 600 volt, #12, type THWN-THHN, normal installation conditions in wireway, conduit, cable tray26051990120042C.L.F.$ 10.60$ 445.20$ 44.50$ 1,869.00$ - 0$ - 0$ - 0$ - 0
Junction boxes, steel channel, 3 channel26052920475036Ea.$ 65.00$ 2,340.00$ 41.00$ 1,476.00$ - 0$ - 0$ - 0$ - 0
Electric metallic tubing (EMT), 1/2" diameter, to 10' high, incl 2 terminations, 2 field bend elbows, 11 beam clamps, and 11 couplings per 100 LF2605331350001400L.F.$ 0.76$ 1,064.00$ 2.89$ 4,046.00$ - 0$ - 0$ - 0$ - 0
Interior LED fixtures, linear, suspended mounted, 74 watt, two light bar 4' long, incl lamps, mounting hardware and connections2651135530204Ea.$ 335.00$ 1,340.00$ 86.00$ 344.00$ - 0$ - 0$ - 0$ - 0
Interior LED fixtures, high bay, surface mounted, round, 150 watt26511355400036Ea.$ 465.00$ 16,740.00$ 182.00$ 6,552.00$ - 0$ - 0$ - 0$ - 0
Lifts, material handling, scissor type, portable, electric, 2,000 lb, 36" high41222310330034Ea.$ 3,875.00$ 131,750.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTALS$ 195,256.86$ 34,008.00$ - 0$ 1,225.00
NON-PRE-PRICED ITEM DESCRIPTIONQTY #QTY UNITMATERIAL (MATL) UNIT COSTMATL TOTAL COSTLABOR UNIT COSTLABOR TOTAL COSTEQUIPMENT (EQUIP) UNIT COSTEQUIP TOTAL COSTOTHER COSTOTHER TOTAL COST
Air Pollution Control District (APCD) notification fee 501 SF to 2,000 SF1EACH$ 250.00$ 250.00
PREPRICED LINE TOTALS (MATERIALS + LABOR + EQUIPMENT + OTHER)$230,489.86
CITY COST INDEX _110.6____ (_SAN DIEGO, CA WEIGHTED AVERAGE)_$24,431.93
SUBTOTAL (PREPRICED LINE TOTALS + CCI)$254,921.79
APPLICABLE SALES TAX ON MATERIALS AND EQUIPMENT __7.75%_______$15,132.41
SUBTOTAL (PREPRICED LINE ITEMS + CCI + SALES TAX)$270,054.19THE PROVIDED UNIT PRICING IS BASED ON R. S. MEANS 2020 BASE DATA.
PRE-PRICED COEFFICIENT _______ (FROM EXHIBIT K WORKSHEET)DO NOT CHANGE THE UNIT PRICING OR SALES TAX PROVIDED.
TOTAL (PRE-PRICED LINE ITEMS + CCI + SALES TAX, LINE 58) + PRE-PRICED COEFFICIENT ADJUSTMENT (LINE 58 X LINE 59)ENTER YOUR EXHIBIT K COEFFICIENTS, COMPLETE THE CALCULATIONS IN ROWS 22 TO 31, AND RETURN.
NON PRE-PRICED LINE TOTALS (MATERIALS + LABOR + EQUIPMENT + OTHER)$250.00
APPLICABLE SALES TAX ON MATERIALS AND EQUIPMENT _7.75%_________$0.00
SUBTOTAL$250.00
NON-PRE-PRICED COEFFICIENT _____ (FROM EXHIBIT K WORKSHEET)
TOTAL (NON PRE-PRICED LINE ITEMS + SALES TAX, LINE 64) + NON-PRE-PRICED COEFFICIENT ADJUSTMENT (LINE 64 X LINE 65)
TOTAL TASK ORDER PRICE (LINE 60 + LINE 66)
NOTE: USE OF THIS FORM IS MANDATORY. ANY MODIFICATION OF THIS FORM BY THE OFFEROR WILL RESULT IN THE OFFER BEING REJECTED AS NON-RESPONSIVE. IF AN OFFEROR BELIEVES THERE ARE PROBLEMS WITH THIS FORM, IT IS THE OFFEROR'S RESPONSIBILITY TO PROVIDE DOCUMENTATION OR EVIDENCE PRIOR TO SUBMISSION OF PROPOSALS TO ALLOW FOR GOVERNMENT REVIEW. THIS WILL BE THE BASIC FORMAT FOR ALL TASK ORDER PROPOSALS AFTER AWARD.