EXHIBIT K COEFFICIENT WORKSHEET with profit language 072418.docx

DOCX document 15 KB Posted

Attached to
Amendment 0005_Indefinite Delivery Indefinite Quantity, Job Order Contract for Electrical and Other Wiring Installation Projects_CPEN & SEAL BEACH
Solicitation number
N62473-20-R-0034
Issued by

View the file

Other files

File Type Posted
Revised SF1442_6.23.20.pdf PDF
N6247320R0034 Amendment 0005.pdf PDF
Exhibit I - Revised San Diego County Wage Determination 06.05.20.pdf PDF
Exhibit E Financial Questionnaire_ REVISED 6.18.20.docx DOCX document
N6247320R0034 Amendment 0004.pdf PDF
N6247320R0034 Amendment 0003.pdf PDF
N6247320R0034 Amendment 0002.pdf PDF
Exhibit E Financial Questionnaire_ REVISED.docx DOCX document
Exhibit I - Revised Orange County Wage Determination 5.29.20.pdf PDF
Exhibit I - Revised San Diego County Wage Determination 05.29.20.pdf PDF
Exhibit I - Revised Riverside County Wage Determination 5.29.20.pdf PDF
EXHIBIT M ELECTRICAL JOC NAICS 238210 PTO 0001_REVISED 6.01.20.xlsx XLSX spreadsheet
N62473-20-R-0034 Amendment 0001.pdf PDF
Exhibit N__PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf PDF
Exhibit A - Offeror Team Composition and Management.docx DOCX document
Exhibit I - Riverside County Wage Determination 5.15.20.pdf PDF
Exhibit E Financial Questionnaire.docx DOCX document
Exhibit I - Orange County Wage Determination 5.15.20.pdf PDF
EXHIBIT M ELECTRICAL JOC NAICS 238210 PTO 0001.xlsx XLSX spreadsheet
Exhibit B - Experience - Offeror.docx DOCX document
Exhibit H GENERIC UFGS Guides for projects.docx DOCX document
Exhibit F Surety Form.docx DOCX document
Exhibit D Safety Data.docx DOCX document
Exhibit G Revised RFI Form.docx DOCX document
Exhibit I - San Diego County Wage Determination 4.17.20.pdf PDF
Exhibit J JOC IDIQ SAMPLE SUBMITTAL REGISTER.docx DOCX document
N6247320R0034 ELECTRICAL JOC RFP.pdf PDF
Exhibit C - PPQ.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT K – COEFFICIENT BREAKDOWN FORM

PRE-PRICED COSTS
MATERIALS
LABOR
EQUIPMENT
AMOUNT
RS MEANS BARE COST (PRESUMED ANNUAL AMOUNT)
$ 2,520,000.00
$ 1,400,000.00
$ 80,000.00
$ 4,000,000.00

WORKER'S COMP INSURANCE

15%

$ 210,000.00

AVERAGE FIXED LABOR OVERHEAD

16%

$ 224,000.00

PROJECT OVERHEAD PRE-PRICED

8%

$ 112,000.00

MATERIAL MARKUP
5%

$ 126,000.00

EQUIPMENT MARKUP

5%
$ 4,000.00
SUBTOTAL
$ 676,000.00

GENERAL AND ADMINISTRATIVE

8%

$ 112,000.00

PROFIT
5%
5%
5%
$ 200,000.00
TOTAL
$ 988,000.00

COEFFICIENT FACTOR (TOTAL DIVIDED BY PRESUMED ANNUAL AMOUNT)

0.247

RS MEANS BARE COST ADJUSTMENT (PRODUCTION/DISCOUNT - FACTOR)

0.900

PRE-PRICED COEFFICIENT

1.147

NON PRE-PRICED BARE COSTS (PRESUMED ANNUAL AMOUNT)
$ 252,000.00
$ 140,000.00
$ 8,000.00
$ 400,000.00

WORKER'S COMP INSURANCE

15%

$ 21,000.00

AVERAGE FIXED LABOR OVERHEAD

16%

$ 22,400.00

PROJECT OVERHEAD NON PRE-PRICED

18%

$ 25,200.00

MATERIAL MARKUP
5%

$ 12,600.00

EQUIPMENT MARKUP

5%
$ 400.00
SUBTOTAL
$ 60,600.00

GENERAL AND ADMINISTRATIVE

8%

$ 11,200.00

PROFIT
5%
5%
5%
$ 20,000.00
TOTAL
$ 91,800.00
BARE COST
$ 400,000.00

COEFFICIENT FACTOR (TOTAL DIVIDED BY BARE COST)

0.2295

NON-PRE-PRICED BARE COST ADJUSTMENT (PRODUCTION/DISCOUNT - FACTOR)

1.000

NON PRE-PRICED COEFFICIENT

1.2295

Offerors should fully understand "at a minimum" what is to be included in the coefficient. Section B of the RFP, and more specifically paragraphs B.2 OFFEROR'S COEFFICIENT AND PRE-PRICED WORK (and its subparagraphs) and B.3 NON PRE-PRICED WORK (and its subparagraphs) define the requirements for the pre-priced and non-pre-priced coefficients.

The amounts shown above are based on the presumption that the Contractor has an annual billing amount of $4,000,000 and up. The amounts listed herein are fictitious as are the cost items. These examples should not be construed to be minimum or maximum, or even normal, amounts. Cost items should be added, removed, or separated as the Offeror deems necessary to demonstrate a detailed breakdown of coefficient cost. Any Offeror edits to the form must be explained in detail in the Offeror’s proposal.

NOTE: The profit percentage proposed by the contractor on this form to be included in its pre-priced and non-pre-priced coefficients shall be binding and shall be the maximum profit rate the Contractor will be allowed to propose for all task orders and/or subsequent modifications issued under this contract.

The Contractor may propose a lower profit rate when responding to an individual task order request (or subsequent modifications) based on the tasks identified in the request. Profit will be negotiated on an individual Task Order and modification basis, but shall never exceed the maximum profit rate proposed by the Contractor on this form. The maximum profit rate shall be binding even if the DFARS 215.404-73 ALTERNATE STRUCTURED APPROACH PROFIT WORKSHEET would result in a higher profit. The maximum profit rate shall not be construed as a “fixed” profit percentage for all Task Orders or Modification actions issued under this contract. If DFARS 215.404-73 ALTERNATE STRUCTURED APPROACH PROFIT WORKSHEET calculations indicate a lower profit rate is merited, the lower profit percentage shall be applied.

File details come from the government source that posted it. Updated .