About this file

The document is a technical engineering drawing (Exhibit I and Exhibit L) prepared for the McNeil Island Stewardship project, specifically detailing deck plate removals for a maritime vessel (McNeil Island Ferry Barge #2). The drawing provides a comprehensive plan view and cross-sectional details for deck structural modifications, including guard rail placements, insert plate locations, potential additional seam configurations, and frame spacing measurements. The technical specifications indicate a planned dry-dock maintenance project involving deck replacement and structural assessments.

The drawings are part of a broader maintenance contract for the Washington State maritime infrastructure, focusing on precise engineering specifications for vessel rehabilitation. The technical drawings include detailed measurements, reference notes specifying welding requirements, coating specifications, and general construction guidelines. The documents reference multiple engineering standards (ASTM A36 for steel yield strength) and indicate collaboration with Foss Maritime Company for the project planning. The technical drawings suggest a meticulous approach to vessel maintenance, with emphasis on structural integrity, safety features, and compliance with maritime engineering standards.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT J

EX

H

IB

IT

L

File details come from the government source that posted it. Updated .