EXHIBIT E - Rate Proposal Form.pdf
PDF 129 KB Posted
- Attached to
- RFP McNeil #2 Drydock
- Solicitation number
- K13803
- Issued by
- Clallam County, Island County, Jefferson County, King County, Kitsap County, Pierce County, San Juan County, Skagit County, Snohomish County, Thurston County, Whatcom County, Clallam Bay CDP, Rock Island City, Whidbey Island Station CDP, Mercer Island City, Bainbridge Island City, Kingston CDP, Kitsap Lake CDP, Anderson Island CDP, Fox Island CDP, Herron Island CDP, Ketron Island CDP, Raft Island CDP, Hat Island CDP, Snohomish City, Puget Island CDP, Washington
About this file
This document is Exhibit E, a Rate Proposal Form for Washington State Department of Corrections (DOC) RFP K13803, specifically related to the McNeil Island Barge #2 drydocking project. The form outlines unit pricing for various services associated with vessel maintenance, including additional dry-storage days, pier-side billing, and labor rates for painting, metal fabrication, welding, project management, and general labor. The rate proposal is valid for 150 days and allows DOC to potentially accept the pricing without further negotiation.
The rate proposal includes detailed hourly and daily rates for different types of labor and services, with provisions for time and material work. The document specifies billing rates for straight time, overtime, and double-time labor, and includes unit pricing for steel materials (5/16" and 3/8" plates). DOC reserves the right to have work performed on a time and material basis in lieu of the quoted prices, providing flexibility in project execution. The form is designed to cover additional work not included in the fixed-fee contract, ensuring comprehensive pricing for potential maintenance and repair activities for the McNeil Island Barge #2.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Washington State RFP K13803 Page 1 of 1 Department of Corrections Exhibit E 25VVC
EXHIBIT E
RATE PROPOSAL FORM
The Contractor agrees that the following Unit Prices will prevail in connection with any work required that is not covered by the fixed fee work in the Bid Form (Exhibit D) or as required by change order. Unit Prices shall include all support, services, staging, labor, mark-up, material, removal and replacement of normally experienced minor interferences to complete only that Item. Include only the dry-docking and berthing costs that are in excess of the base Contract. DOC reserves the right to have any of the work in the Unit Price Items performed on a time and material basis in lieu of the quoted price.
The rate proposal is a firm offer for a period of 150 days following receipt, and it may be accepted by DOC without further negotiation (except where obviously required by lack of certainty in key terms) at any time within the 150-day period.
ITEM UNIT DESCRIPTION UNIT
PRICE
(a) DAY Billing rate per additional dry-storage day.
(b) DAY Billing rate per alongside pier day.
(c) HOUR Rate per hour for painting labor
(d) HOUR Rate per hour for metal fabrication and welding labor
(e) HOUR Rate per hour for estimation/project management
(f) HOUR Rate per hour for general labor
(g) Unit
Cost per CWT, ABS Grade A or B Steel (ABS Certification not required):
• 5/16” Plate
• 3/8” Plate
TIME AND MATERIAL WORK
Any work that is requested by DOC to be accomplished on a "Time and Material" basis shall be all inclusive and shall be accounted for and charged based on the following:
Straight Time Labor Billing Rate: $______________ per hour
Overtime Labor Billing Rate: $______________ per hour
Double Time Labor Billing Rate: $______________ per hour
File details come from the government source that posted it. Updated .