This submittal document contains Level 2 shop drawings for concrete slab construction at the Downtown Library and Affordable Housing Project located at 119 Lincoln Street, Santa Cruz, California. The drawings, prepared by Echelcon, Inc. (the contractor) and submitted through LCI Sub #27, detail the top of slab (TOS) and bottom of slab (BOS) conditions for Level 02 of the podium structure. The submittal, dated November 3, 2025, with a due date of November 10, 2025, is pending responses to Request for Information (RFI) #43 regarding Level 2 slab clarifications. The drawings include comprehensive dimensional plans, section details at scales of 1/4" = 1', and specifications for concrete finishing, including provisions for masonite layers and styrofoam, concrete joint roughening to 1/4" amplitude, and various slab conditions for ramp slabs, mid-level landing slabs, and typical wall-to-slab connections. Multiple reference callouts direct coordination with elevator and stair shop drawings, and numerous areas are flagged as pending RFI confirmation, particularly regarding drain locations, recessed wall specifications, and slab edge dimensions referenced in RFI responses #39, #40, #42, and #43.

The shop drawings were prepared for approval by PASE (structural engineers) and reviewed by the architect and other design professionals. The submittal indicates that corrections and clarifications are required in red dimensions and cloud markings shown on the plans. Key notes clarify that the contractor and subcontractors remain responsible for verifying all dimensions, elevations, slopes, and drain locations against the architectural and structural contract documents, coordinating with all trades, and ensuring compliance with fabrication and construction standards. The drawings reference multiple architectural sheets (A2.01-A2.04, A2.11, A2.02) and structural framing plans (S2.22) that were issued under Revision A1, with the Level 2 slab shop drawings designated as sheet LC-5A, LC-5B, LC-6A, and LC-6B at the indicated scale. The document establishes that this submittal is for conformance review only and does not constitute approval of fabrication or construction methodologies.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittal Cover Page

Downtown Library and Affordable Housing Project

119 Lincoln St. Santa Cruz CA, 95060

Notes:

Submittal pending RFI 43: L2 Clarifications

ECHELCON, INC.

Review is for general conformance with the contract documents for this project only. Subcontractor or supplier is responsible for omissions, quantities, dimensions, field conditions, coordination with all trades, and information pertaining to fabrication processes or construction techniques. Review shall not relieve subcontractor or supplier from responsibility for errors, omissions or deviation from contract documents. Stamped submission does not constitute a change order.

By:

Date:

Submittal # Description:

Jackson Bigham

03 30 00-17 L2 TOS and BOS - Largo

11/10/2025

CONSULTANT/ OTHER

ENGINEER

ARCHITECT

NO EXCEPTION TAKEN

REVISE & RESUBMIT

MAKE CORRECTIONS

NOTED

REJECTED

SUBMIT SPECIFIED ITEM

REVIEWED FOR

INFORMATION ONLY

DATE

Corrections or comments made on the shop drawings during this review do not relieve contractor from compliance with requirements of the drawings and specifications. This check is only for review of the general conformance with the design concept of the project and general compliance with the information given in the contract documents. The contractor is responsible for: Confirming and correlating all quantities and dimensions; selecting fabrication processes and techniques of construction; coordinating his or her work with that of all other trades and performing all work in a safe and satisfactory manner.

P S

E T

OPLES ASSOCIATES

R U C T U R A L E N G I N E E R S

01/05/24

12/16/2025

X

EOPLES ASSOCIATES

STRUCTURAL ENGINEERS

408.957.9220 www.pase.com

PASE:

1. Verify all dimensions, elevations, slopes and drain locations with Architectural Drawings.

2. See response to RFI 42 and 43 for L2 slab clarifications.

J Pereira 12.23.2025

TOS COMMENTS:

- Per response to RFI 39, refer to updated sheets A2.01, A2.02, A2.03 and A2.04 included with REV A1 for adjustments to slab edge dimensions.

- Refer to RFI 40 response for drain locations.

- See comments provided by PASE and mark-ups provided on the submittal.

DannyNguyenPham Text Box

FOR REFERENCE ONLY

JOB NO. L1527

SUBMITTAL NUMBER: 027 Rev

Date SUBMITTED

To Echelcon, Inc.

945 W Julian St. Attn: Echelcon, Inc.

San Jose, CA, 95126 Project: DLAHP - Santa Cruz, CA

WE ARE SENDING YOU: X Attached Under Separate Cover Via Electronic the Following Items

X Shop Drawings Prints Plans Specifications

Copy of Letter Change Order Samples X Product Data/MSDS

COPIES SPEC

PDF

THESE ARE TRANSMITTED as checked below:

X For Approval Approved as Resubmit Copies for Approval

Submitted

For Your Use Approved as Submit Copies for Distribution

Noted

As Requested Returned for Return Corrected Prints

Corrections

For Review and

Comment

FOR BIDS DUE 20 PRINTS RETURNED AFTER

LOAN TO US

REMARKS: Please send back an electronic copy of the approved submittal. Thank You

COPY TO: SIGNED: Joe Adams

DATE

11/3/2025

Date DUE 11/10/2025

Description

LCI SUB #27 - L2 - TOS & BOS

891 West Hamilton Ave.Campbell, CA 95008

PRIORITY11/3/2025

(408) 874-2500 Fax (408) 874-2599

*Pending LCI RFI #33

SHEET #

IF ENCLOSURES ARE NOT AS NOTED, KINDLY NOTIFY US AT ONCE.

DannyNguyenPham

LC

-5

A

LC

-5 B

M

AT

C H

LI

N

E

1 2 3 4 5 6 7 8 9

A

B

C

C.2

D

E

F

G

H

I

I.1

3 4 5 6 7 8 9

G.2

G.1

7.12.1

2.1 7.1

J

21.1

18'-9"

8'-0" 19'-0"

27'-0" 27'-0" 27'-0" 27'-0"

12'-6" 3'-0"

27'-0"

323'-0" 2'

-3

'-9

'-6

'-0

'-5

'-1

/2

'-1

1/

2"

'-6

'-6

'-1

1"

'-7

5'

-6

8°

27'-0" 15'-6"

'-0

'-0

7'-9"

8°

10°

BO

S

5'- 1 1

/2"

BOS 11'-2"

10'-11" BOS

10'-10" BOS

11'-2" BOS

11'-2" BOS

10'-11" BOS

BO

S

'-2

BO

S

4'- 7"

BO

S

3'- 6 1

/2"BOS 8'-5"

11'-0" BOS

11'-2" BOS 11'-2" BOS

11'-2" BOS

10'-8" BOS

11'-2" BOS

11'-2" BOS

11'-2" BOS

11'-2" BOS

2'- 0"9 1

/2"

BOB 10'-4"

11'-2" BOS 11'-2" BOS

LC-5A

LC-5A

LC-5A

LC-5A

LC-5A

LC-5A

LC-5A

LC-5A

LC-5A

LC-5A

CONFIRM WITH

ELEVATOR SHOPS

CONFIRM WITH

ELEVATOR SHOPS

CO

NF

IR

M

W

IT

H

EL

EV

AT

OR

S

HO

PS

CONFIRM WITH

STAIR SHOPS

CONFIRM WITH

STAIR SHOPS

CO

NF

IR

M

W

IT

H

ST

AI

R

SH

OP

S

ST

AI

R#

ELEV#2

ELEV#4

EL

EV

#3

STAIR#3

STAIR#4

11'-2" BOS

11'-2" BOS

11'-0" BOS

10'-11" BOS

10'-11" BOS

8'-2" BOB

8'-2" BOB

LC-5B

LC-5B

12'-0" (26.75')

LEVEL 02

1'-0" 8 1/2"

1'-0" 1'-8 1/2"

3' -6

PROVIDE 2 LAYERS OF

1/4" THICK MASONITE

3" Ø STYROFOAM

11'-1 1/2" TOW

12'-0" (26.75')

LEVEL 02

1'-0"

1'-8 1/2"

8" 5'-2"

1'-4"

PROVIDE 2 LAYERS OF

1/4" THICK MASONITE

11'-1 1/2" TOW

3" Ø STYROFOAM

10'-4" BOB

1' -8

12'-0" (26.75')

LEVEL 02

A

PROVIDE 2 LAYERS OF

1/4" THICK MASONITE

1'-0" 1'-0"

1'-0"

C.J-ROUGHEN TO

1/4" AMPLITUDE

3" Ø STYROFOAM

12'-0" (26.75')

LEVEL 02

A

2'-0"4'-0"2'-0"

3' -0

0'-0" (14.75')

LEVEL 01

1' -0

1'-0" 1'-0"

3' -6

VA

R

IE

S

PROVIDE 2 LAYERS OF

1/4" THICK MASONITE

1" KEY

RAMP SLAB

VA

R

IE

S

3" Ø STYROFOAM

A

2'-0"4'-0"2'-0"

3' -0

0'-0" (14.75')

LEVEL 01

1' -0

1'-0" 1'-0"

3' -6

VA

R

IE

S

PROVIDE 2 LAYERS OF

1/4" THICK MASONITE

3" Ø STYROFOAM

F

2'-4" 3'-0"

12'-0" (26.75')

LEVEL 02

2' -9

5'-4" 1'-0"

3'-10" 1'-0"1'-0"

PROVIDE 2 LAYERS OF

1/4" THICK MASONITE

3" Ø STYROFOAM

PROVIDE 2 LAYERS OF

1/4" THICK MASONITE

8'-4 1/2" TOW

F

12'-0" (26.75')

LEVEL 02

5"5"

18'-6" (33.25')

LIBRARY LEVEL 02

5"

10" PROVIDE 2 LAYERS OF

1/4" THICK MASONITE

3" Ø STYROFOAM

PROVIDE 2 LAYERS OF

1/4" THICK MASONITE

3" Ø STYROFOAM

12'-0" (26.75')

LEVEL 02

2.12

10"

1'-0"

3"

C.J-ROUGHEN TO

1/4" AMPLITUDE

1'-0"

" 10"

9 1/2"

4"

10'-10" BOS

VERIFY 10'-11" TOW

10'-11" TOW

F

12'-0" (26.75')

LEVEL 02

2' -9

5'-4" 1'-0"

1'-0"

C.J-ROUGHEN TO

1/4" AMPLITUDE

8'-5" TOW

F

12'-0" (26.75')

LEVEL 02

5"5"

18'-6" (33.25')10

5"

10"

C.J-ROUGHEN TO

1/4" AMPLITUDE

C.J-ROUGHEN TO

1/4" AMPLITUDE

LIBRARY LEVEL 02

ROUGHEN SURFACE

TO 1/4" AMPLITUDE

8"

MID LEVEL LANDING SLAB

TYPICAL CONDITION

FOR MID LEVEL

LANDING SLAB TO WALL

" 1" KEY

RAMP SLAB

TYPICAL CONDITION FOR

RAMP SLAB TO WALL

PER SCHEDULE

3/4" CHAMFER

TYPICAL CONDITION FOR

BEAM / DROP CAP

ScaleO R

IG

IN

AL

S

H

EE

T

SI

ZE

2" x

0"

Checked By Drawn By Date Project Number

No. Description Date

ABBREVIATIONS:

DOWNTOWN LIBRARY

AND AFFORDABLE

HOUSING PROJECT

UNLESS NOTIFIED OTHERWISE

FTG

TYP.

TOW

TOS

TOM

TOC

SOG

EA

BOS

BOF

BOW

BOC

BOB

FOOTING

TYPICAL

TOP OF WALL

TOP OF SLAB

TOP OF MAT FOUNDATION

TOP OF CURB / COLUMN

SLAB ON GRADE

EACH

BOTTOM OF SLAB

BOTTOM OF FOOTING

BOTTOM OF WALL

BOTTOM OF COLUMN

BOTTOM OF BEAM

UNO.

SIM SIMILAR

AD AREA DRAIN

BOM BOTTOM OF MAT FOUNDATION

FOC FACE OF CONCRETE

O.C ON CENTRE

FD FLOOR DRAIN

TOTS TOP OF TOPPING SLAB

TOF TOP OF FOOTING

L1527 11/3/2025

TN

SSJ

As indicated

LEVEL 2 - BOTTOM OF SLAB

LC-5A

/3

/2

5:

P

M

LI

NC

O

LN

S

TR

EE

T

SA

N

TA

C

R U

Z, C

AL

IF

O R

N

IA

LEVEL 2 - BOTTOM OF SLAB

SCALE: 1/8" = 1'

R0 11/03/2025For Approval

N

Shop drawings prepared using

NOTES:

1. RED COLOR DIMENSION AND CLOUD NEED TO BE CONFIRMED.

Sheet No Title Date Revision File Type

PDF

S2.22 LEVEL 02 PODIUM FRAMING PLAN

C5.0 GRADING & DRAINAGE PLAN

PDFA2.02 SLAB & CURB PLAN - LEVEL 02

PDFOVERALL - FLOOR PLAN - LEVEL 02A2.11

PDF

A110/01/2025 A110/01/2025 A110/01/2025 A110/01/2025

CONTROL POINT OF GRIDLINE

SCALE: 1SECTION

1/4"=1' SCALE: 2SECTION

1/4"=1'

SCALE: 3SECTION

1/4"=1'

SCALE: 4SECTION

1/4"=1'

SCALE: 5SECTION

1/4"=1'

SCALE: 6SECTION

1/4"=1'

SCALE: 7SECTION

1/4"=1'

SCALE: 8SECTION

1/4"=1'

SCALE: 9SECTION

1/4"=1'

SCALE: 10SECTION

1/4"=1'

PASE: See response to RFI 39 and Architectural Drawings Revision A1.

PASE: Step at wall is structurally acceptable. Verify slab rebar at step per Detail 9/S5.20.

DannyNguyenPham

-5

A

LC

-5 B

M

AT

C H

LI

N

E 9 10 11 12 13 14

9 10 11 12 13 14

A

B

C

C.2

D

E

F

G

H

I

I.1

J

27'-0" 27'-0" 27'-0" 27'-0" 18'-9"

2' -3

'-9

'-6

'-0

'-5

'-1

/2

'-1

1/

2"

'-6

'-6

'-1

1"

'-7

5'

-6

'-0

'-0

11'-2" BOS

11'-2" BOS

11'-2" BOS

11'-2" BOS

11'-2" BOS

10'-10 3/4" BOS

BOS 11'-2"

BO

S

5'- 2 1

/2"

10'-9" BOS

BOS 5'-1"

BO

S

4'- 6 1

/4"

BOS 11'-1" BO

S

5'- 2 1

/2"

BOS 3'-11 1/2"

BOS 9'-2"

3'- 0"

7'- 7"

11'-2" BOS

11'-2" BOS

10'-10 3/4" BOS

BOS 11'-2"

BOS 11'-2"

BOS 11'-2"

3'-0" 3"

1'-6"

BO

B

'-2

3/ 4"

LC-5B 12

LC-5B

LC-5B

LC-5B

LC-5B

CO

NF

IR

M

W

IT

H

EL

EV

AT

OR

S

HO

PS

CONFIRM WITH

ELEVATOR SHOPS

CONFIRM WITH

STAIR SHOPS

CONFIRM WITH

STAIR SHOPS

CONFIRM WITH

STAIR SHOPS

CONFIRM WITH

STAIR SHOPS

ELEV#1

EL

EV

#5

STAIR#6

STAIR#7

STAIR#8

CONFIRM WITH

STAIR SHOPS

STAIR#5

STAIR#1

11'-2" BOS

LC-5B

LC-5B

LC-5B

10'-10 3/4" BOS

PENDING RFI

PENDING RFI

F

12'-0" (26.75')

LEVEL 02

5"5"

18'-6" (33.25')10

5"

10"

C.J-ROUGHEN TO

1/4" AMPLITUDE

C.J-ROUGHEN TO

1/4" AMPLITUDE

LIBRARY LEVEL 02

12'-0" (26.75')

LEVEL 02

ROUGHEN SURFACE

TO 1/4" AMPLITUDE

8"

PROVIDE 2 LAYERS OF

1/4" THICK MASONITE

3" Ø STYROFOAM

MID LEVEL LANDING SLAB

12'-0" (26.75')

LEVEL 02

1'-8 1/2"

1'-8 1/2" 9"

9"

1'-6"

PROVIDE 2 LAYERS OF

1/4" THICK MASONITE

3" Ø STYROFOAM

11'-1 1/2" TOW

C.J-ROUGHEN TO

1/4" AMPLITUDE

12'-0" (26.75')

LEVEL 02

F 10"

1"

5"

9'-10"

1"

1'-0"

C.J-ROUGHEN TO

1/4" AMPLITUDE

PROVIDE 2 LAYERS OF

1/4" THICK MASONITE

3" Ø STYROFOAM

11'-1" TOW 11'-0 1/2" TOW

12'-0" (26.75')

LEVEL 0210

1'-0" 1'-0"

1/

4"

10"

1'-0"

C.J-ROUGHEN TO

1/4" AMPLITUDE

10'-10 3/4" TOW

G

0'-0" (14.75')

LEVEL 01

12'-0" (26.75')

LEVEL 02

6"6"

6"

8' -0

D

O O

R H

T

2'-0"

C.J-ROUGHEN TO

1/4" AMPLITUDE

RECESSED WALL

PENDING RFI

ROUGHEN SURFACE

TO 1/4" AMPLITUDE

8"

MID LEVEL LANDING SLAB

TYPICAL CONDITION

FOR MID LEVEL

LANDING SLAB TO WALL

" 1" KEY

RAMP SLAB

TYPICAL CONDITION FOR

RAMP SLAB TO WALL

12'-0" (26.75')

LEVEL 02

13 14

3' -6

8" 9" 1'-6"

1'-6" 6"

1'-8 1/2"

3"

3'-0"

1' -9

/4

" C.J-ROUGHEN TO

1/4" AMPLITUDE

10'-2 3/4" BOB

10'-10 3/4" BOS

12'-0" (26.75')

LEVEL 02

C.2

VA

R

IE

S

8"

3' -6

RAMP SLAB

10"

PENDING RFI

PENDING RFI

12'-0" (26.75')

LEVEL 02

3' -6

8"

C.2

PENDING RFI

VA

R

IE

S

12'-0" (26.75')

LEVEL 02

11'-0"

1'-8 1/2"

3' -0

8'-2" BOS

12'-0" (26.75')

LEVEL 02

C.2

VA

R

IE

S

8"

3' -6

10"

10"

8"

RAMP SLAB

1" KEY

C.J-ROUGHEN TO

1/4" AMPLITUDE

PER SCHEDULE

3/4" CHAMFER

TYPICAL CONDITION FOR

BEAM / DROP CAP

ScaleO R

IG

IN

AL

S

H

EE

T

SI

ZE

2" x

0"

Checked By Drawn By Date Project Number

No. Description Date

ABBREVIATIONS:

DOWNTOWN LIBRARY

AND AFFORDABLE

HOUSING PROJECT

UNLESS NOTIFIED OTHERWISE

FTG

TYP.

TOW

TOS

TOM

TOC

SOG

EA

BOS

BOF

BOW

BOC

BOB

FOOTING

TYPICAL

TOP OF WALL

TOP OF SLAB

TOP OF MAT FOUNDATION

TOP OF CURB / COLUMN

SLAB ON GRADE

EACH

BOTTOM OF SLAB

BOTTOM OF FOOTING

BOTTOM OF WALL

BOTTOM OF COLUMN

BOTTOM OF BEAM

UNO.

SIM SIMILAR

AD AREA DRAIN

BOM BOTTOM OF MAT FOUNDATION

FOC FACE OF CONCRETE

O.C ON CENTRE

FD FLOOR DRAIN

TOTS TOP OF TOPPING SLAB

TOF TOP OF FOOTING

L1527 11/3/2025

TN

SSJ

As indicated

LEVEL 2 - BOTTOM OF SLAB

LC-5B

/3

/2

5:

P

M

LI

NC

O

LN

S

TR

EE

T

SA

N

TA

C

R U

Z, C

AL

IF

O R

N

IA

N

Shop drawings prepared using

NOTES:

1. RED COLOR DIMENSION AND CLOUD NEED TO BE CONFIRMED.

LEVEL 2 - TOP OF SLAB

SCALE: 1/8" = 1'

R0 11/03/2025For Approval

Sheet No Title Date Revision File Type

PDF

S2.22 LEVEL 02 PODIUM FRAMING PLAN

C5.0 GRADING & DRAINAGE PLAN

PDFA2.02 SLAB & CURB PLAN - LEVEL 02

PDFOVERALL - FLOOR PLAN - LEVEL 02A2.11

PDF

A110/01/2025 A110/01/2025 A110/01/2025 A110/01/2025

CONTROL POINT OF GRIDLINE

SCALE: 10SECTION

1/4"=1'

SCALE: 11SECTION

1/4"=1'

SCALE: 12SECTION

1/4"=1' SCALE: 13SECTION

1/4"=1'

SCALE: 14SECTION

1/4"=1'

SCALE: 15SECTION

1/4"=1'

SCALE: 16SECTION

1/4"=1'

SCALE: 17SECTION

1/4"=1' SCALE: 18SECTION

1/4"=1'

SCALE: 19SECTION

1/4"=1' SCALE: 20SECTION

1/4"=1'

PASE: Verify recessed wall location and length with RFI 43 response.

PASE: See response to

RFI 43.

PASE: See response to

RFI 43.

DannyNguyenPham

-6

A

LC

-6 B

M

AT

C H

LI

N

E

1 2 3 4 5 6 7 8 9

A

B

C

C.2

D

E

F

G

H

I

I.1

3 4 5 6 7 8 9

G.2

G.1

7.12.1

2.1 7.1

J

21.1

18'-9"

8'-0" 19'-0"

27'-0" 27'-0" 27'-0" 27'-0"

12'-6" 3'-0"

27'-0"

323'-0" 2'

-3

'-9

'-6

'-0

'-5

'-1

/2

'-1

1/

2"

'-6

'-6

'-1

1"

'-7

5'

-6

8°

27'-0" 15'-6"

'-0

'-0

7'-9"

8°

10°

4'-2"

2'- 0"

4'- 9"

1'-8 1/2"

9 1 /2"

1'-8"

2'- 0"

9" 3"

1'-0"

1'- 0"

3'-5" 6'-10"

2'- 4"

1'- 9 1

/2"

2 1 /2"

2'-7" 2'-3"

7'- 0"

9'- 3"

10"

7'-0 1/2"

11"

4'- 4 1

/2" 5'-

3 1 /2"

3'-

1'-8 1/2"2'-

1'-0" 4'-2"

TO

S

5'- 9 1

/2"

TOS 12'-0"

7'- 7"

7"

1'-6" 1'-0" 8'-8"

2"

2 1/4"

7" 6'-

"CONFIRM WITH

ELEVATOR SHOPS

CONFIRM WITH

ELEVATOR SHOPS

CO

NF

IR

M

W

IT

H

EL

EV

AT

OR

S

HO

PS

11'-9" TOS

9 1/2"

11'-8" TOS

12'-0" TOS

12'-0" TOS

11'-9" TOS

4'- 0"

3 3/4"

4°

9'-8"

5'- 2"

3'- 6"

5'- 8" 1'-

0" 1'-

0"

TO

S

'-0

TO

S

5'- 3"

2'-9"

2'-4"

3'-0"

1'-2"

TO

S

4'- 2 1

/2"

4'-2" 2'-4"

8'-9"

9'-1"

5'- 4"

1'- 0"

1'-8 1/2"

3'- 0"

8 1/2" 1'-8"

TOS 9'-3"

11'-10" TOS

12'-0" TOS

12'-0" TOS

12'-0" TOS

7'-6"

'-8

" 11'-6" TOS

5" 5"

7" 8'-

8"

6'-11" 6"

5"2" 5"

15'-6" TOW

15'-6" TOW

15'-6" TOW

15'-6" TOW

15'-6" TOW

CONFIRM WITH

STAIR SHOPS

CONFIRM WITH

STAIR SHOPS

CO

NF

IR

M

W

IT

H

ST

AI

R

SH

OP

S

LC-6A

LC-6A

6'-4"

LC-6A

LC-6A

LC-6A

15'-6" TOW

LC-6A

LC-6A

LC-6A

LC-6A

LC-6A

ST

AI

R#

ELEV#2

ELEV#4

EL

EV

#3

STAIR#3

STAIR#4

PENDING RFI

PENDING RFI

6 5/8"

PENDING RFI

12'-0" TOS

12'-0" TOS

3'-6" HIGH CONCRETE WALL

3'-6" HIGH CONCRETE WALL

6.67% SLOPE

RAMP TO LEVEL 1

5.92% SLOPE

RAMP TO LEVEL 3

1.05% 1.83%

1.33%

0.56%

1.7 0%

0.56%

PENDING RFI

PENDING RFI

LC-6B

LC-6B

LC-6B

12'-0" (26.75')

LEVEL 02

1'-0" 8 1/2"

1'-0" 1'-8 1/2"

3' -6

PROVIDE 2 LAYERS OF

1/4" THICK MASONITE

3" Ø STYROFOAM

11'-1 1/2" TOW

12'-0" (26.75')

LEVEL 02

1'-0"

1'-8 1/2"

8" 5'-2"

1'-4"

PROVIDE 2 LAYERS OF

1/4" THICK MASONITE

11'-1 1/2" TOW

3" Ø STYROFOAM

10'-4" BOB

1' -8

12'-0" (26.75')

LEVEL 02

A

PROVIDE 2 LAYERS OF

1/4" THICK MASONITE

1'-0" 1'-0"

1'-0"

C.J-ROUGHEN TO

1/4" AMPLITUDE

3" Ø STYROFOAM

12'-0" (26.75')

LEVEL 02

A

2'-0"4'-0"2'-0"

3' -0

0'-0" (14.75')

LEVEL 01

1' -0

1'-0" 1'-0"

3' -6

VA

R

IE

S

PROVIDE 2 LAYERS OF

1/4" THICK MASONITE

1" KEY

RAMP SLAB

VA

R

IE

S

3" Ø STYROFOAM

A

2'-0"4'-0"2'-0"

3' -0

0'-0" (14.75')

LEVEL 01

1' -0

1'-0" 1'-0"

3' -6

VA

R

IE

S

PROVIDE 2 LAYERS OF

1/4" THICK MASONITE

3" Ø STYROFOAM

F

2'-4" 3'-0"

12'-0" (26.75')

LEVEL 02

2' -9

5'-4" 1'-0"

3'-10" 1'-0"1'-0"

PROVIDE 2 LAYERS OF

1/4" THICK MASONITE

3" Ø STYROFOAM

PROVIDE 2 LAYERS OF

1/4" THICK MASONITE

8'-4 1/2" TOW

F

12'-0" (26.75')

LEVEL 02

5"5"

18'-6" (33.25')

LIBRARY LEVEL 02

5"

10" PROVIDE 2 LAYERS OF

1/4" THICK MASONITE

3" Ø STYROFOAM

PROVIDE 2 LAYERS OF

1/4" THICK MASONITE

3" Ø STYROFOAM

12'-0" (26.75')

LEVEL 02

2.12

10"

1'-0"

3"

C.J-ROUGHEN TO

1/4" AMPLITUDE

1'-0"

" 10"

9 1/2"

4"

10'-10" BOS

VERIFY 10'-11" TOW

10'-11" TOW

F

12'-0" (26.75')

LEVEL 02

2' -9

5'-4" 1'-0"

1'-0"

C.J-ROUGHEN TO

1/4" AMPLITUDE

8'-5" TOW

F

12'-0" (26.75')

LEVEL 02

5"5"

18'-6" (33.25')10

5"

10"

C.J-ROUGHEN TO

1/4" AMPLITUDE

C.J-ROUGHEN TO

1/4" AMPLITUDE

LIBRARY LEVEL 02

ROUGHEN SURFACE

TO 1/4" AMPLITUDE

8"

MID LEVEL LANDING SLAB

TYPICAL CONDITION

FOR MID LEVEL

LANDING SLAB TO WALL

" 1" KEY

RAMP SLAB

TYPICAL CONDITION FOR

RAMP SLAB TO WALL

ScaleO R

IG

IN

AL

S

H

EE

T

SI

ZE

2" x

0"

Checked By Drawn By Date Project Number

No. Description Date

ABBREVIATIONS:

DOWNTOWN LIBRARY

AND AFFORDABLE

HOUSING PROJECT

UNLESS NOTIFIED OTHERWISE

FTG

TYP.

TOW

TOS

TOM

TOC

SOG

EA

BOS

BOF

BOW

BOC

BOB

FOOTING

TYPICAL

TOP OF WALL

TOP OF SLAB

TOP OF MAT FOUNDATION

TOP OF CURB / COLUMN

SLAB ON GRADE

EACH

BOTTOM OF SLAB

BOTTOM OF FOOTING

BOTTOM OF WALL

BOTTOM OF COLUMN

BOTTOM OF BEAM

UNO.

SIM SIMILAR

AD AREA DRAIN

BOM BOTTOM OF MAT FOUNDATION

FOC FACE OF CONCRETE

O.C ON CENTRE

FD FLOOR DRAIN

TOTS TOP OF TOPPING SLAB

TOF TOP OF FOOTING

L1527 11/3/2025

TN

SSJ

As indicated

LEVEL 2 - TOP OF SLAB

LC-6A

/3

/2

5:

P

M

LI

NC

O

LN

S

TR

EE

T

SA

N

TA

C

R U

Z, C

AL

IF

O R

N

IA

LEVEL 2 - TOP OF SLAB

SCALE: 1/8" = 1'

N

Shop drawings prepared using

NOTES:

1. RED COLOR DIMENSION AND CLOUD NEED TO BE CONFIRMED.

Sheet No Title Date Revision File Type

PDF

S2.22 LEVEL 02 PODIUM FRAMING PLAN

C5.0 GRADING & DRAINAGE PLAN

PDFA2.02 SLAB & CURB PLAN - LEVEL 02

PDFOVERALL - FLOOR PLAN - LEVEL 02A2.11

PDF

A110/01/2025 A110/01/2025 A110/01/2025 A110/01/2025

CONTROL POINT OF GRIDLINE

SCALE: 1SECTION

1/4"=1' SCALE: 2SECTION

1/4"=1'

SCALE: 3SECTION

1/4"=1'

SCALE: 4SECTION

1/4"=1'

SCALE: 5SECTION

1/4"=1'

SCALE: 6SECTION

1/4"=1'

SCALE: 7SECTION

1/4"=1'

SCALE: 8SECTION

1/4"=1'

SCALE: 9SECTION

1/4"=1'

SCALE: 10SECTION

1/4"=1'

R0 11/03/2025For Approval

PASE: Verify drain location with Arch.

TOS: See RFI 40 response

TOS: See RFI 40 response

TOS: See RFI 39 response

DannyNguyenPham

-6

A

LC

-6 B

M

AT

C H

LI

N

E 9 10 11 12 13 14

9 10 11 12 13 14

A

B

C

C.2

D

E

F

G

H

I

I.1

J

27'-0" 27'-0" 27'-0" 27'-0" 18'-9"

2' -3

'-9

'-6

'-0

'-5

'-1

/2

'-1

1/

2"

'-6

'-6

'-1

1"

'-7

5'

-6

'-0

'-0

12'-9" 3'-1 1/4"

3"5'-9"

5'- 0"

1'-8 1/2"1'-6"

4'- 0"

'-2

1/ 2"

1'-8 1/2"

4'- 0"

7"1'-5"

3'- 3"

3'- 3 1

/2"

CO

NF

IR

M

W

IT

H

EL

EV

AT

OR

S

HO

PS

CONFIRM WITH

ELEVATOR SHOPS

12'-0" TOS

12'-0" TOS

15'-6" TOW 15'-6" TOW

15'-6" TOW

15'-6" TOW

15'-6" TOW

1'-0" 7'-8"

8'-8" 1'-0" 1'-0" 1'-2"

6'-

2'-

4 1 /2"

4'- 6 1

/2"

1'- 0" 8"

2'- 0"

2'-

1/ 2"

11'-8 3/4" TOS

TOS 12'-0"

6 5/8"

2"

12'-0" TOS

5'-2 1/2"

2°

2°

4'- 9"

1'-8 1/2"

1'-8 1/2"

4'-2"

TO

S

5'-

1/ 2"

1'-0"

10'-9 1/2"

1'-10"

12'-7 1/2"

5'- 1"

9'- 4"

1'- 0"

1'- 0"

4'- 4 1

/2"

CONFIRM WITH

STAIR SHOPS

CONFIRM WITH

STAIR SHOPS

CONFIRM WITH

STAIR SHOPS

CONFIRM WITH

STAIR SHOPS

2'-0"

11'-8 3/4" TOS

4'-6"

11'-7" TOS

2'- 1 1

/2" 5'-

9"

8"

8"

4'-5 3/8" 9"

8"

2'-8"

2'- 7" 5"

5"

6"6"

1'- 0"

4'-4" 4'-6" 6"

2'-3"3'-6"9'-4" 10'-11"

7'- 4"

9'- 2"

6"

TOS 5'-9"4'-

2"

1'- 0" 4'-0" 10'-1"

4'-6"

7'-4"

6'-11" 2'-5"4'-6"

8'- 8"

1'- 0"

8'- 0"

1'- 0"

'-4

TO

S

5'- 2 1

/4"

4'-2"8'-3" 13'-1"

9'-2"

4'- 6"1'-

0"

TOS 11'-11" TO

S

5'-

1/ 2"

2'-10 3/4"

1'- 0"

1'- 9"

7'- 5 1

/2"

1'-0"

TOS 4'-7 1/2"

6" 4'-

2"

9'-4" 10 1/2"

TOS 9'-10"

7'- 4" 6'- 5"

4'-6" 4'-4"

1'- 6"

2'- 5"

4'- 4"

LC-6B

11'-11" TOS

'-3

LC-6B

LC-6B

LC-6B

LC-6B

ELEV#1

EL

EV

#5

STAIR#6

STAIR#7

STAIR#8

CONFIRM WITH

STAIR SHOPS

STAIR#5

STAIR#1

PENDING RFI

PENDING RFI

PENDING RFI

PENDING RFI

5"

2°

3'-9 1/2"

3'-0 3/4"

2'- 0"

PENDING RFI

PENDING RFI

3°

VERIFY

1'- 0"

90°

3'-6" HIGH CONCRETE WALL

0.71% 0.71%

PENDING RFI

12'-0" TOS

TOS 12'-0"

TOS 12'-0"

2° 3'-2 7/8"

2°

PENDING RFI

LC-6B

LC-6B

LC-6B

15'-6" TOW

PENDING RFI

15'-6" TOW

PENDING RFI

F

12'-0" (26.75')

LEVEL 02

5"5"

18'-6" (33.25')10

5"

10"

C.J-ROUGHEN TO

1/4" AMPLITUDE

C.J-ROUGHEN TO

1/4" AMPLITUDE

LIBRARY LEVEL 02

12'-0" (26.75')

LEVEL 02

ROUGHEN SURFACE

TO 1/4" AMPLITUDE

8"

PROVIDE 2 LAYERS OF

1/4" THICK MASONITE

3" Ø STYROFOAM

MID LEVEL LANDING SLAB

12'-0" (26.75')

LEVEL 02

1'-8 1/2"

1'-8 1/2" 9"

9"

1'-6"

PROVIDE 2 LAYERS OF

1/4" THICK MASONITE

3" Ø STYROFOAM

11'-1 1/2" TOW

C.J-ROUGHEN TO

1/4" AMPLITUDE

12'-0" (26.75')

LEVEL 02

F 10"

1"

5"

9'-10"

1"

1'-0"

C.J-ROUGHEN TO

1/4" AMPLITUDE

PROVIDE 2 LAYERS OF

1/4" THICK MASONITE

3" Ø STYROFOAM

11'-1" TOW 11'-0 1/2" TOW

12'-0" (26.75')

LEVEL 0210

1'-0" 1'-0"

1/

4"

10"

1'-0"

C.J-ROUGHEN TO

1/4" AMPLITUDE

10'-10 3/4" TOW

G

0'-0" (14.75')

LEVEL 01

12'-0" (26.75')

LEVEL 02

6"6"

6"

8' -0

D

O O

R H

T

2'-0"

C.J-ROUGHEN TO

1/4" AMPLITUDE

RECESSED WALL

PENDING RFI

ROUGHEN SURFACE

TO 1/4" AMPLITUDE

8"

MID LEVEL LANDING SLAB

TYPICAL CONDITION

FOR MID LEVEL

LANDING SLAB TO WALL

" 1" KEY

RAMP SLAB

TYPICAL CONDITION FOR

RAMP SLAB TO WALL

12'-0" (26.75')

LEVEL 02

13 14

3' -6

8" 9" 1'-6"

1'-6" 6"

1'-8 1/2"

3"

3'-0"

1' -9

/4

" C.J-ROUGHEN TO

1/4" AMPLITUDE

10'-2 3/4" BOB

10'-10 3/4" BOS

12'-0" (26.75')

LEVEL 02

C.2

VA

R

IE

S

8"

3' -6

RAMP SLAB

10"

PENDING RFI

PENDING RFI

12'-0" (26.75')

LEVEL 02

3' -6

8"

C.2

PENDING RFI

VA

R

IE

S

12'-0" (26.75')

LEVEL 02

11'-0"

1'-8 1/2"

3' -0

8'-2" BOS

12'-0" (26.75')

LEVEL 02

C.2

VA

R

IE

S

8"

3' -6

10"

10"

8"

RAMP SLAB

1" KEY

C.J-ROUGHEN TO

1/4" AMPLITUDE

ScaleO R

IG

IN

AL

S

H

EE

T

SI

ZE

2" x

0"

Checked By Drawn By Date Project Number

No. Description Date

ABBREVIATIONS:

DOWNTOWN LIBRARY

AND AFFORDABLE

HOUSING PROJECT

UNLESS NOTIFIED OTHERWISE

FTG

TYP.

TOW

TOS

TOM

TOC

SOG

EA

BOS

BOF

BOW

BOC

BOB

FOOTING

TYPICAL

TOP OF WALL

TOP OF SLAB

TOP OF MAT FOUNDATION

TOP OF CURB / COLUMN

SLAB ON GRADE

EACH

BOTTOM OF SLAB

BOTTOM OF FOOTING

BOTTOM OF WALL

BOTTOM OF COLUMN

BOTTOM OF BEAM

UNO.

SIM SIMILAR

AD AREA DRAIN

BOM BOTTOM OF MAT FOUNDATION

FOC FACE OF CONCRETE

O.C ON CENTRE

FD FLOOR DRAIN

TOTS TOP OF TOPPING SLAB

TOF TOP OF FOOTING

L1527 11/3/2025

TN

SSJ

As indicated

LEVEL 2 - TOP OF SLAB

LC-6B

/3

/2

5:

P

M

LI

NC

O

LN

S

TR

EE

T

SA

N

TA

C

R U

Z, C

AL

IF

O R

N

IA

N

Shop drawings prepared using

NOTES:

1. RED COLOR DIMENSION AND CLOUD NEED TO BE CONFIRMED.

LEVEL 2 - TOP OF SLAB

SCALE: 1/8" = 1'

R0 11/03/2025For Approval

Sheet No Title Date Revision File Type

PDF

S2.22 LEVEL 02 PODIUM FRAMING PLAN

C5.0 GRADING & DRAINAGE PLAN

PDFA2.02 SLAB & CURB PLAN - LEVEL 02

PDFOVERALL - FLOOR PLAN - LEVEL 02A2.11

PDF

A110/01/2025 A110/01/2025 A110/01/2025 A110/01/2025

CONTROL POINT OF GRIDLINE

SCALE: 10SECTION

1/4"=1'

SCALE: 11SECTION

1/4"=1'

SCALE: 12SECTION

1/4"=1' SCALE: 13SECTION

1/4"=1'

SCALE: 14SECTION

1/4"=1'

SCALE: 15SECTION

1/4"=1'

SCALE: 16SECTION

1/4"=1'

SCALE: 17SECTION

1/4"=1' SCALE: 18SECTION

1/4"=1'

SCALE: 19SECTION

1/4"=1' SCALE: 20SECTION

1/4"=1'

PASE: Verify recessed wall location and length with RFI 43 response.

PASE: See response to

RFI 43.

PASE: Return wall is structurally acceptable.

PASE: Verify dimensions with Arch.

PASE: Verify dimensions with Arch.

PASE: Verify dimensions with Arch.

TOS: See RFI 39 response.

TOS: See RFI 40 response

TOS: See RFI 39 response

DannyNguyenPham

DLAHP_Submittal Cover Page_.pdf
Untitled

LCI SUB 027 - L2 TOS & BOS.pdf

File details come from the government source that posted it. Updated .