Exhibit H – Seasonal Task Matrix The Vendor shall perform all irrigation services in accordance with the following seasonal schedule.
Spring (March – May)
| Task Category |
| Required Activities |
| Frequency |
| Controllers |
| Review and adjust seasonal programming. Verify controller accuracy and communication. |
| Monthly + as needed |
| Dripline & Bubblers |
| Flush systems. Inspect emitters, bubblers, and indicators. Repair damaged parts. |
| Weekly inspection, monthly audit |
| Valves & Boxes |
| Inspect valves and valve boxes for leaks, debris, and defects. |
| Weekly |
| Backflow |
| Inspect assemblies and coordinate testing as required. |
| Monthly + annual as required |
| Courtyards |
| Service all 11 interior courtyards under escort per Section 4.12. Remove all tools, materials, and debris before exiting. |
| Per approved schedule (Mon–Fri, 8 AM–3 PM) |
| Deliverables |
| Submit spring report covering flushing, controller adjustments, repairs, and system condition. |
| End of season |
Summer (June – August)
| Task Category |
| Required Activities |
| Frequency |
| Controllers |
| Adjust programming for seasonal demand. Verify sensor function. |
| Monthly + as needed |
| Dripline & Bubblers |
| Inspect performance, leaks, clogging, and damaged components. Repair promptly. |
| Weekly inspection, monthly audit |
| Valves & Boxes |
| Inspect for leaks, debris, and unsafe conditions. |
| Weekly |
| Backflow |
| Inspect assemblies and verify required condition. |
| Monthly |
| Courtyards |
| Service all 11 interior courtyards under escort per Section 4.12. Remove all tools, materials, and debris before exiting. |
| Per approved schedule (Mon–Fri, 8 AM–3 PM) |
| Deliverables |
| Submit summer report covering seasonal adjustments, repairs, and condition findings. |
| End of season |
Fall (September – November)
| Task Category |
| Required Activities |
| Frequency |
| Controllers |
| Reduce programming for cooler conditions. Verify continued operation. |
| Monthly + as needed |
| Dripline & Bubblers |
| Flush dripline, filters, and emitters. Repair seasonal wear damage. |
| Weekly inspection, monthly audit |
| Valves & Boxes |
| Inspect valves and boxes. Correct leaks and defects. |
| Weekly |
| Backflow |
| Inspect assemblies and prepare for cooler conditions. |
| Monthly |
| Courtyards |
| Continue service under approved schedule and escort requirement per Section 4.12. |
| Per approved schedule |
| Deliverables |
| Submit fall report covering programming changes, flushing, repairs, and system condition. |
| End of season |
Winter (December – February)
| Task Category |
| Required Activities |
| Frequency |
| Controllers |
| Adjust programming for winter conditions. Verify continued operation. |
| Monthly |
| Dripline & Bubblers |
| Inspect for freeze-related damage and performance issues. Repair as needed. |
| Weekly inspection, monthly audit |
| Valves & Boxes |
| Inspect for leaks, exposed damage, and unsafe conditions. |
| Weekly |
| Backflow |
| Protect exposed assemblies. Repair or replace damaged insulation or protective materials. |
| Monthly + after freeze events |
| Annual Inspection |
| Full-system inspection, pressure testing, decoder/electrical evaluation. Submit annual condition report per Section 8. |
| Once (annually) |
| Courtyards |
| Service all 11 interior courtyards under escort per Section 4.12. Respond to freeze-related issues as approved. |
| Per approved schedule + as needed |
| Deliverables |
| Submit winter report and annual condition report. |
| End of season |