EXHIBIT E - Past Performance Questionnaire 36C24420R0052.docx

DOCX document 539 KB Posted

Attached to
Y1DZ--Chiller Plant construction-Erie VAMC Project Number 562-14-115
Solicitation number
36C24420R0052
Issued by

About this file

This document contains a past performance questionnaire for a federal construction contractor and details of a related federal contract opportunity for chiller plant construction at a Department of Veterans Affairs medical center. The past performance questionnaire is to be completed by references for a contractor proposing on Solicitation Number 36C24420R0052, which is a Service-Disabled Veteran Owned Small Business set-aside to construct a chiller plant at the Erie VAMC. The opportunity is estimated between $5-10 million and has a 365-day period of performance. The NAICS code is 236220 for Commercial and Institutional Building Construction, with a small business size standard of $36.5 million. The completed questionnaires from references are due by December XX, 2019 to the VA Network Contracting Office.

View the file

Other files

File Type Posted
36C24420R0052 0009.docx DOCX document
General Decision Number- PA20200088 08-21-2020.docx DOCX document
36C24420R0052 0008.docx DOCX document
SCHEDULE 01-Add Alternates -2.docx DOCX document
Erie Chiller Amendment 08 200917.pdf PDF
MD102.pdf PDF
AE201.pdf PDF
AE101.pdf PDF
Memo Chiller Plant Questions_HDG Responses.pdf PDF
36C24420R0052 0007.docx DOCX document
AD101.pdf PDF
AE301.pdf PDF
AD200.pdf PDF
GI001.pdf PDF
AD102.pdf PDF
088000 ADD ALTERNATE 1r1.docx DOCX document
AE102.pdf PDF
SCHEDULE 01-Add Alternate.docx DOCX document
36C24420R0052 0006.docx DOCX document
Erie Chiller - Amendment 06.zip ZIP file
36C24420R0052 0005.docx DOCX document
36C24420R0052 0004.docx DOCX document
S02 36C24420R0052 0003.docx DOCX document
Drawing-GS001.pdf PDF
36C24420R0052 0002.docx DOCX document
Sign-in sheet Pre-Proposal meeting held 6-30-2020.pdf PDF
S06 36C24420R0052 0001.docx DOCX document
S02 Erie Chiller CD 8 Final Documents Submission Drawings 190808-3-61-80.pdf PDF
EXHIBIT B - Subcontractor Information and Consent Form 36C24420R0052.docx DOCX document
Erie Chiller CD 8 Final Documents Submission Specifications 190808.pdf PDF
S02 Erie Chiller CD 8 Final Documents Submission Drawings 190808-2 Pages 41-60.pdf PDF
S02 36C24420R0052-Posted 6-22-2020.docx DOCX document
S02 Erie Chiller CD 8 Final Documents Submission Drawings 190808-1 Pages 1-40.pdf PDF
EXHIBIT A - Past Performance Relevancy Questionnaire 36C24420R0052.docx DOCX document
EXHIBIT C - Calculation of Self-Performed Work 36C24420R0052 3-16-20.docx DOCX document
EXHIBIT D - Sample Transmittal Letter for Past Performance Evaluation Questionnaire 36C24420R0052.docx DOCX document
S02 Erie Chiller CD 8 Final Documents Submission Drawings 190808-4-81-135.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Veterans Affairs

Network Contracting Office 4 1010 Delafield Road Pittsburgh, PA 15215

Past Performance Questionnaire for: 36C24420R00052 Chiller Plant Construction

INSTRUCTIONS TO OFFEROR

Complete the CONTRACTOR INFORMATION section, below (type answers into light blue shaded boxes). Save the document. Send an electronic or hard copy print of the form to each of your reference contacts, asking them to please complete the form and submit it according to the instructions, below.

Company Name

Street Address

Point of Contact (POC)

City

POC Phone Number

State

Reference Project Title

Zip Code

Contract Period of Performance (start to finish):

Email

Contract Number

Contract Dollar Value

Description of Work

Role of Contractor on This Project (check appropriate box)
|_| Prime Contractor |_| Sub-contractor |_| Key Personnel

INSTRUCTIONS TO REFERENCE CONTACT

The contractor named above is submitting a proposal for a United States Department of Veterans Affairs contract, and has sent this form to you as a past performance reference contact. Please complete the following pages in full (all areas shaded in light yellow, below). Once completed, please send the form to the Contracting Officer via postal mail or email directly to:

Department of Veterans Affairs Erie VA Medical Center ATTN: Paul Bosak / 36C24420R0052 135 East 38th Street Erie, PA 16504 Email address: paul.bosak@va.gov

Please return the completed form ASAP, but no later than 1:00 pm local time, December XX, 2019.

If you have any questions, please contact the Contracting Officer: paul.bosak@va.gov.

RESPONDENT INFORMATION [completed by Reference Contact]

Company Name

Street Address

POC Name

City

Phone Number

State

Email

Zip Code

PERFORMANCE INFORMATION: Choose the number on the scale of 0 (Neutral) to 5 (Exceptional) that most accurately describes the contractor’s performance or situation. PLEASE PROVIDE AN EXPLANATION FOR THE OVERALL RATING in the Remarks section, below.

0
1
2
3
4
5
NEUTRAL
UNACCEPTABLE
MARGINAL
ACCEPTABLE
VERY GOOD
OUTSTANDING
No record of past performance, or not applicable or the record is inconclusive.
Performance did not meet most contractual requirements. There were serious problems and the contractor’s corrective actions were ineffective.
Performance did not meet some contractual requirements. There were problems, some of a serious nature, for which corrective action was only marginally effective.
Performance met most contractual requirements. There were some minor problems and corrective actions taken by the contractor were satisfactory.
Performance met all contract requirements and exceeded some to the government’s benefit. There were a few minor problems, which the contractor resolved in a timely, effective manner.
Performance exceeded all contract requirements. There were no problems.
The Contractor …
0
1
2
3
4
5

QUALITY – MANAGEMENT & WORKMANSHIP

1.
Provided experienced managers and supervisors with the technical and administrative abilities needed to meet contract requirements.
|_|
|_|
|_|
|_|
|_|
|_|
2.
Demonstrated ability to hire, maintain, and replace, if necessary, qualified construction personnel during the contract period.
|_|
|_|
|_|
|_|
|_|
|_|
3.
Provided and followed approved quality control plan and/or inspection procedures to meet contract requirements.
|_|
|_|
|_|
|_|
|_|
|_|
4.
Corrected deficiencies in timely manner and pursuant to their quality control procedures.
|_|
|_|
|_|
|_|
|_|
|_|
5.
Submittals clearly identified the proposed item IAW the specifications and drawings.
|_|
|_|
|_|
|_|
|_|
|_|
6.
Suggested alternative approaches to problems.
|_|
|_|
|_|
|_|
|_|
|_|

TIMELINESS AND ADHERENCE TO SCHEDULE

0
1
2
3
4
5
7.
Contractor provided timely notices of possible delays/schedule revisions.

REMARKS:

|_|
|_|
|_|
|_|
|_|
|_|
8.
Timeliness in submitting submittals and reports and responding to agency inquiries, RFP's, etc.
|_|
|_|
|_|
|_|
|_|
|_|
9.
Developed realistic and met approved progress schedules.
|_|
|_|
|_|
|_|
|_|
|_|

BUSINESS PRACTICES/CUSTOMER RELATIONSHIP AND ABILITY TO PERFORM

10.
Displayed initiative to solve problems.
|_|
|_|
|_|
|_|
|_|
|_|
11.
How well did the contractor work independent of Government guidance, oversight and assistance?
|_|
|_|
|_|
|_|
|_|
|_|
12.
Subcontractors / tradesmen were adequately managed and coordinated. Explain any subcontracting issues (positive or negative) that impacted the performance of your contract(s).
|_|
|_|
|_|
|_|
|_|
|_|
13.
For contract changes, contractor provided timely and realistic change order proposals.
|_|
|_|
|_|
|_|
|_|
|_|

COMPLIANCE & SAFETY

0
1
2
3
4
5
14.
Reports (i.e., daily, test, logs) / records were submitted completely and accurately satisfy the requirement.
|_|
|_|
|_|
|_|
|_|
|_|
15.
Applicable to Federal Contracts –Contractor complied with applicable Federal Laws and Regulations such as Construction Wage Rate Requirements – timely payrolls and compliance; Drug-Free Workplace; Environmental Regulations and Use of Recovered Materials; Executive Order 13101 Greening the Government.
|_|
|_|
|_|
|_|
|_|
|_|
16.
Contractor’s safety program was in compliance with federal regulations. Contractor implemented and followed their safety plan and ran a “safe jobsite”.
|_|
|_|
|_|
|_|
|_|
|_|

INFECTION CONTROL

17.
Contractor had an Infection Control Process in place and complied with agency Infection Control Requirements.
|_|
|_|
|_|
|_|
|_|
|_|

OVERALL CUSTOMER SATISFACTION

18.
Demonstrated reasonableness in modifications cost proposal.
|_|
|_|
|_|
|_|
|_|
|_|
19.
Was the contractor ever issued a cure or show cause notice under the referenced contract? If yes, explain outcome in “remarks.”
|_|
YES
|_|
NO
20.
Would you award another contract to this contractor? If not, please explain in “remarks.”
|_|
YES
|_|
NO
OVERALL PERFORMANCE RATING:
|_|
|_|
|_|
|_|
|_|
|_|

REMARKS (Please use as much space as is needed – the box will expand as you type).

I hereby certify that the information that I have reported above is accurate to the best of my knowledge.

Printed Name

E-mail address

Business Title

Signature

Date