This document includes a demolition plan and federal contract opportunity notice. The demolition plan outlines the work required to demolish an existing building and concrete pads at the Erie VA Medical Center in preparation for a new Chiller Plant construction project. Key elements to be demolished include CMU walls, doors, concrete pads, slab, fencing and windows. The federal contract opportunity is a solicitation notice seeking construction services for the Chiller Plant project. The contractor will perform all work in accordance with provided plans and specifications. The project value is estimated between $5-10 million. The period of performance is 365 calendar days from notice to proceed. This opportunity is set aside for Service-Disabled Veteran Owned Small Businesses. The NAICS code is 236220 and small business size standard is $36.5 million. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration VISN 4.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEMOLITION PLAN -
BUILDING 7
AD101
HDG PROJECT: 14016
ERIE VAMC
135 EAST 38TH STREET
ERIE, PA 16504-1559
No. Description Date
1 2 3 4 5
Recommended Approvals:
1. MEDICAL DIRECTOR
2. ASSOCIATE DIRECTOR
3. CHIEF OF STAFF
4. ASSOC. DIRECTOR
5. SERVICE LINE MGRS.
6. OPERATIONS SERVICE LINE MANAGER
7. INFECTION CONTROL MANAGER
8. SAFETY MANAGER
9. GENERAL ENGINEER
10. COR
Drawing Title:Seal:
FULLY SPRINKLERED
Architect / Engineer Address: Project Title: Date:
Project Number:
Drawing No. :Drawn:
Checked: Reviewed:
Building Number: File Name:
Const. Contract No. :
D C
B A
Revisions:
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
P 704.814.1320 F 704.321.0833
Project Phase:
D C
B A
1 2 3 4 5 6
6" th re e in ch es o ne fo ot
6" th re e qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e ha lf in ch o ne fo ot
6" th re e ei gh th s in ch o ne fo ot on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot
CENTRAL CHILLED
CD-8 FINAL DOCUMENTS
562-14-5705
August 8, 2019
WATER PLANT DESIGN
FIRST FLOOR FFE: 860.0'
BUILDING 7
A
B
C
D
E
1 2 3 4 5 6
7H A R R E L L D E S I G N G R O U P , P C formerly HARRELL, SALTRICK & HOPPER, PC
U.S. Department of Veterans Affairs
U .S
. D ep ar tm en t of V et er an s
Af fa irs
AutoCAD SHX Text
EX. ELECTRICAL DUCTBANK
AutoCAD SHX Text
EX. STEAM TUNNEL
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text #2
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text #3
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text #5
AutoCAD SHX Text #6
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text A.4
AutoCAD SHX Text A.5
AutoCAD SHX Text B
AutoCAD SHX Text B.5
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AREA NO. 1
AutoCAD SHX Text
AREA NO. 2
AutoCAD SHX Text
FUEL OIL PUMP ROOM
AutoCAD SHX Text
ELECTRICAL EQUIPMENT ROOM
AutoCAD SHX Text
SUMP PUMP ROOM
AutoCAD SHX Text
EXISTING STORAGE
AutoCAD SHX Text
EXISTING STAIRS
AutoCAD SHX Text
GG
AutoCAD SHX Text
WALL LEGEND
AutoCAD SHX Text
1-HOUR RATED FIRE WALL
AutoCAD SHX Text
2-HOUR RATED FIRE BARRIER
AutoCAD SHX Text
COORDINATION DRAWINGS
AutoCAD SHX Text EXISTING WALL, DOOR, WINDOW, MILLWORK, FIXTURE, OR OTHER FIXTURE OR ASSEMBLY TO REMAINTO REMAIN
AutoCAD SHX Text
NEW WALL
AutoCAD SHX Text THE MECHANICAL CONTRACTOR SHALL TAKE THE LEAD IN PREPARATION OF COORDINATION DRAWINGS. SUCH DRAWINGS SHALL BE ARRANGED AND DESIGNED THROUGH AND FROM COORDINATION WITH ALL OTHER MAJOR AND MINOR SUBCONTRACTORS AND THE GENERAL CONTRACTOR. PROVIDE PLAN VIEWS, SECTIONS AND ELEVATIONS AS REQUIRED TO FULLY COORDINATE ALL NEW WORK WITH ITSELF AND EXISTING CONDITIONS. DRAW TO SCALE (AT NOT LESS THAN 3/8" = 1'-0"). DRAWINGS SHALL SHOW, BUT NOT BE LIMITED TO: ALL WALL RATINGS; ALL DUCTWORK; ALL AIR DISTRIBUTION; MECHANICAL EQUIPMENT; MECHANICAL PIPING; FIRE PROTECTION PIPING; ALL PLUMBING PIPING; CABLE TRAYS (WITH ELEVATIONS NOTED); LIGHTING FIXTURES (WHEN CEILING MOUNTED); CEILING GRID AND CEILING HEIGHT; MAJOR BEAMS AND JOISTS (WITH ELEVATIONS MARKED); FIRE ALARM DEVICES AND SPEAKERS (WHERE CEILING MOUNTED); ELECTRICAL CONDUITS LARGER THAN 2-INCH DIAMETER; ELECTRICAL BUSWAY AND REQUIRED CLEARANCES; EQUIPMENT PROVIDED BY OTHERS THAT PROTRUDE INTO CEILING CAVITIES OR IMPEDE THE LOCATION OR ACCESS TO ABOVE CEILING PIPING, DUCTWORK OF OTHER EQUIPMENT. SECTIONS SHALL BE CUT THROUGH AREAS SHOWING MATERIALS AND SYSTEMS OF ALL CONTRACTS. IF THERE ARE ANY OUTSTANDING ISSUES THAT CANNOT BE RESOLVED, CONSULT WITH THE ARCHITECT AND/OR ENGINEER (THROUGH THE VA COR) FOR GUIDANCE AND MAKE CORRECTIONS IN ACCORDANCE WITH DIRECTIONS GIVEN. IT IS IMPORTANT TO NOTE THAT IT IS IMPORTANT TO NOTE THAT FABRICATION CANNOT BEGIN UNTIL COORDINATION DRAWINGS HAVE BEEN APPROVED! ANY MATERIAL, EQUIPMENT, SYSTEMS, ETC., PROCUREMENT OR ANY MATERIAL, EQUIPMENT, SYSTEMS, ETC., PROCUREMENT OR INSTALLATION COMMENCED PRIOR TO APPROVAL IS TAKEN AT THE CONTRACTOR'S OWN RISK AND MAY HAVE TO BE REPLACED, MODIFIED, MOVED AND/OR RECONFIGURED AT THE CONTRACTOR'S COST.
AutoCAD SHX Text EXISTING WALL, DOOR, WINDOW, MILLWORK, FIXTURE, OR OTHER FIXTURE OR ASSEMBLY TO BE REMOVEDTO BE REMOVED
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text
NW
AutoCAD SHX Text
SW
AutoCAD SHX Text
NE
AutoCAD SHX Text
SE
AutoCAD SHX Text S
AutoCAD SHX Text W
AutoCAD SHX Text
KEYPLAN
AutoCAD SHX Text
GENERAL SHEET NOTES
AutoCAD SHX Text
AutoCAD SHX Text 1/4" = 1'-0"
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
BASEMENT PLAN
AutoCAD SHX Text D1
AutoCAD SHX Text X
AutoCAD SHX Text
SHEET KEYNOTES
AutoCAD SHX Text
1. DEMOLISH CONCRETE PAD DEMOLISH CONCRETE PAD 2. DEMOLISH CHAIN LINK FENCE DEMOLISH CHAIN LINK FENCE 3. DEMOLISH CMU WALLS, DOOR AND DOOR FRAME. DEMOLISH CMU WALLS, DOOR AND DOOR FRAME. THIS WORK WILL BE PERFORMED BY THE OWNER AS PART OF A SEPARATE PROJECT PRIOR TO THE CHILLER PLANT PROJECT. 4. DEMOLITION OF SLAB TO BE COORDINATED WITH DEMOLITION OF SLAB TO BE COORDINATED WITH STRUCTURAL AND EQUIPMENT MANUFACTURER 5. REMOVE EXISTING CONCRETE PADS COMPLETELY REMOVE EXISTING CONCRETE PADS COMPLETELY 6. EXISTING PUMPS TO REMAIN EXISTING PUMPS TO REMAIN 7. EXISTING CONDENSATE TANK TO REMAIN EXISTING CONDENSATE TANK TO REMAIN 8. EXISTING AIR DRYER WILL BE RELOCATED PRIOR TO EXISTING AIR DRYER WILL BE RELOCATED PRIOR TO CHILLER PLANT PROJECT 9. EXISTING ACCESS HATCH ABOVE EXISTING ACCESS HATCH ABOVE 10. EXISTING AIR COMPRESSOR TO REMAIN EXISTING AIR COMPRESSOR TO REMAIN 11. EXISTING EYE WASH TO REMAIN EXISTING EYE WASH TO REMAIN 12. EXISTING CONCRETE-ENCASE COLUMN EXISTING CONCRETE-ENCASE COLUMN 13. EXISTING STEEL COLUMN EXISTING STEEL COLUMN 14. EXISTING PIPE TO REMAIN EXISTING PIPE TO REMAIN 15. EXISTING FLOOR DRAIN TO REMAIN EXISTING FLOOR DRAIN TO REMAIN 16. EXISTING TRENCH DRAIN EXISTING TRENCH DRAIN 17. EXISTING FLOOR CLEANOUT TO REMAIN EXISTING FLOOR CLEANOUT TO REMAIN 18. EXISTING STAIRS TO REMAIN EXISTING STAIRS TO REMAIN 19. DEMOLISH PLASTIC GLAZING WINDOW SYSTEMDEMOLISH PLASTIC GLAZING WINDOW SYSTEM
AutoCAD SHX Text EXISTING CONCRETE SLAB DEMOLITION FOR INSTALLATION OF PIPING AND NEW COLUMN FOOTINGS - SEE PLUMBING AND STRUCTURAL DRAWINGS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A. WHERE EXISTING HOUSEKEEPING PADS AND CMU WHERE EXISTING HOUSEKEEPING PADS AND CMU WALLS ARE SHOWN TO BE REMOVED, APPLY A FLOAT COAT OF CONCRETE LEVELING COMPOUND, FOR A SMOOTH FINISH.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AMENDMENT 07
AutoCAD SHX Text 0/9/11/2020
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
| Sheets and Views |
| Work |
File details come from the government source that posted it. Updated .