This federal contract opportunity solicitation is for the construction of a Chiller Plant for the Department of Veterans Affairs Medical Center in Erie, Pennsylvania. The contractor shall perform all work in accordance with the provided plans and specifications to provide all necessary labor, materials, equipment, permits, testing and reports in compliance with federal, state and local codes for the estimated $5 million to $10 million construction project. The period of performance is 365 calendar days from notice to proceed. This 100% Service-Disabled Veteran Owned Small Business set aside solicitation is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4, and has a North American Industry Classification System code of 236220 for commercial and institutional building construction, with a small business size standard of $36.5 million.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRE SPRINKLER
LEGEND, NOTES AND
DETAILS
FX001
HDG PROJECT: 14016
ERIE VAMC
135 EAST 38TH STREET
ERIE, PA 16504-1559
No. Description Date
1 2 3 4 5
Recommended Approvals:
1. MEDICAL DIRECTOR
2. ASSOCIATE DIRECTOR
3. CHIEF OF STAFF
4. ASSOC. DIRECTOR
5. SERVICE LINE MGRS.
6. OPERATIONS SERVICE LINE MANAGER
7. INFECTION CONTROL MANAGER
8. SAFETY MANAGER
9. GENERAL ENGINEER
10. COR
Drawing Title:Seal:
FULLY SPRINKLERED
Architect / Engineer Address: Project Title: Date:
Project Number:
Drawing No. :Drawn:
Checked: Reviewed:
Building Number: File Name:
Const. Contract No. :
D C
B A
Revisions:
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
P 704.814.1320 F 704.321.0833
Project Phase:
D C
B A
1 2 3 4 5 6 th re e i n c h e s o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
CENTRAL CHILLED
CD-8 FINAL DOCUMENTS
562-14-5705
August 8, 2019
WATER PLANT DESIGN
7H A R R E L L D E S I G N G R O U P , P C
BASEMENT FLOOR
FIRE SPRINKLER PLAN
FX101
HDG PROJECT: 14016
ERIE VAMC
135 EAST 38TH STREET
ERIE, PA 16504-1559
No. Description Date
1 2 3 4 5
Recommended Approvals:
1. MEDICAL DIRECTOR
2. ASSOCIATE DIRECTOR
3. CHIEF OF STAFF
4. ASSOC. DIRECTOR
5. SERVICE LINE MGRS.
6. OPERATIONS SERVICE LINE MANAGER
7. INFECTION CONTROL MANAGER
8. SAFETY MANAGER
9. GENERAL ENGINEER
10. COR
Drawing Title:Seal:
FULLY SPRINKLERED
Architect / Engineer Address: Project Title: Date:
Project Number:
Drawing No. :Drawn:
Checked: Reviewed:
Building Number: File Name:
Const. Contract No. :
D C
B A
Revisions:
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
P 704.814.1320 F 704.321.0833
Project Phase:
D C
B A
1 2 3 4 5 6 th re e i n c h e s o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
CENTRAL CHILLED
CD-8 FINAL DOCUMENTS
562-14-5705
August 8, 2019
WATER PLANT DESIGN
FIRST FLOOR FFE: 860.0'
BUILDING 7
A
B
C
D
E
1 2 3 4 5 6
FIRST FLOOR FIRE
SPRINKLER PLAN
FX102
HDG PROJECT: 14016
ERIE VAMC
135 EAST 38TH STREET
ERIE, PA 16504-1559
No. Description Date
1 2 3 4 5
Recommended Approvals:
1. MEDICAL DIRECTOR
2. ASSOCIATE DIRECTOR
3. CHIEF OF STAFF
4. ASSOC. DIRECTOR
5. SERVICE LINE MGRS.
6. OPERATIONS SERVICE LINE MANAGER
7. INFECTION CONTROL MANAGER
8. SAFETY MANAGER
9. GENERAL ENGINEER
10. COR
Drawing Title:Seal:
FULLY SPRINKLERED
Architect / Engineer Address: Project Title: Date:
Project Number:
Drawing No. :Drawn:
Checked: Reviewed:
Building Number: File Name:
Const. Contract No. :
D C
B A
Revisions:
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
P 704.814.1320 F 704.321.0833
Project Phase:
D C
B A
1 2 3 4 5 6 th re e i n c h e s o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
CENTRAL CHILLED
CD-8 FINAL DOCUMENTS
562-14-5705
August 8, 2019
WATER PLANT DESIGN
FIRST FLOOR FFE: 860.0'
BUILDING 7
A
B
C
D
E
1 2 3 4 5 6
PLUMBING LEGEND,
NOTES AND
SCHEDULES
P001
HDG PROJECT: 14016
ERIE VAMC
135 EAST 38TH STREET
ERIE, PA 16504-1559
No. Description Date
1 2 3 4 5
Recommended Approvals:
1. MEDICAL DIRECTOR
2. ASSOCIATE DIRECTOR
3. CHIEF OF STAFF
4. ASSOC. DIRECTOR
5. SERVICE LINE MGRS.
6. OPERATIONS SERVICE LINE MANAGER
7. INFECTION CONTROL MANAGER
8. SAFETY MANAGER
9. GENERAL ENGINEER
10. COR
Drawing Title:Seal:
FULLY SPRINKLERED
Architect / Engineer Address: Project Title: Date:
Project Number:
Drawing No. :Drawn:
Checked: Reviewed:
Building Number: File Name:
Const. Contract No. :
D C
B A
Revisions:
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
P 704.814.1320 F 704.321.0833
Project Phase:
D C
B A
1 2 3 4 5 6 th re e i n c h e s o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
CENTRAL CHILLED
CD-8 FINAL DOCUMENTS
562-14-5705
August 8, 2019
WATER PLANT DESIGN
HDG PROJECT: 14016
ERIE VAMC
135 EAST 38TH STREET
ERIE, PA 16504-1559
No. Description Date
1 2 3 4 5
Recommended Approvals:
1. MEDICAL DIRECTOR
2. ASSOCIATE DIRECTOR
3. CHIEF OF STAFF
4. ASSOC. DIRECTOR
5. SERVICE LINE MGRS.
6. OPERATIONS SERVICE LINE MANAGER
7. INFECTION CONTROL MANAGER
8. SAFETY MANAGER
9. GENERAL ENGINEER
10. COR
Drawing Title:Seal:
FULLY SPRINKLERED
Architect / Engineer Address: Project Title: Date:
Project Number:
Drawing No. :Drawn:
Checked: Reviewed:
Building Number: File Name:
Const. Contract No. :
D C
B A
Revisions:
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
P 704.814.1320 F 704.321.0833
Project Phase:
D C
B A
1 2 3 4 5 6 th re e i n c h e s o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
CENTRAL CHILLED
CD-8 FINAL DOCUMENTS
562-14-5705
August 8, 2019
WATER PLANT DESIGN
FIRST FLOOR FFE: 860.0'
BUILDING 7
A
B
C
D
E
1 2 3 4 5 6
7H A R R E L L D E S I G N G R O U P , P C
BASEMENT FLOOR
PLUMBING PLAN -
WASTE DEMOLITION
PD101
135 EAST 38TH STREET
ERIE, PA 16504-1559
No. Description Date
1 2 3 4 5
Recommended Approvals:
1. MEDICAL DIRECTOR
2. ASSOCIATE DIRECTOR
3. CHIEF OF STAFF
4. ASSOC. DIRECTOR
5. SERVICE LINE MGRS.
6. OPERATIONS SERVICE LINE MANAGER
7. INFECTION CONTROL MANAGER
8. SAFETY MANAGER
9. GENERAL ENGINEER
10. COR
Drawing Title:Seal:
FULLY SPRINKLERED
Architect / Engineer Address: Project Title: Date:
Project Number:
Drawing No. :Drawn:
Checked: Reviewed:
Building Number: File Name:
Const. Contract No. :
D C
B A
Revisions:
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
P 704.814.1320 F 704.321.0833
Project Phase:
D C
B A
1 2 3 4 5 6 th re e i n c h e s o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
CENTRAL CHILLED
CD-8 FINAL DOCUMENTS
562-14-5705
August 8, 2019
WATER PLANT DESIGN
FIRST FLOOR FFE: 860.0'
BUILDING 7
A
B
C
D
E
1 2 3 4 5 6
7H A R R E L L D E S I G N G R O U P , P C
FIRST FLOOR
PLUMBING PLAN -
WASTE DEMOLITION
PD102
135 EAST 38TH STREET
ERIE, PA 16504-1559
No. Description Date
1 2 3 4 5
Recommended Approvals:
1. MEDICAL DIRECTOR
2. ASSOCIATE DIRECTOR
3. CHIEF OF STAFF
4. ASSOC. DIRECTOR
5. SERVICE LINE MGRS.
6. OPERATIONS SERVICE LINE MANAGER
7. INFECTION CONTROL MANAGER
8. SAFETY MANAGER
9. GENERAL ENGINEER
10. COR
Drawing Title:Seal:
FULLY SPRINKLERED
Architect / Engineer Address: Project Title: Date:
Project Number:
Drawing No. :Drawn:
Checked: Reviewed:
Building Number: File Name:
Const. Contract No. :
D C
B A
Revisions:
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
P 704.814.1320 F 704.321.0833
Project Phase:
D C
B A
1 2 3 4 5 6 th re e i n c h e s o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
CENTRAL CHILLED
CD-8 FINAL DOCUMENTS
562-14-5705
August 8, 2019
WATER PLANT DESIGN
FIRST FLOOR FFE: 860.0'
BUILDING 7
A
B
C
D
E
1 2 3 4 5 6
7H A R R E L L D E S I G N G R O U P , P C
BASEMENT FLOOR
PLUMBING PLAN -
SUPPLY DEMOLITION
PD103
135 EAST 38TH STREET
ERIE, PA 16504-1559
No. Description Date
1 2 3 4 5
Recommended Approvals:
1. MEDICAL DIRECTOR
2. ASSOCIATE DIRECTOR
3. CHIEF OF STAFF
4. ASSOC. DIRECTOR
5. SERVICE LINE MGRS.
6. OPERATIONS SERVICE LINE MANAGER
7. INFECTION CONTROL MANAGER
8. SAFETY MANAGER
9. GENERAL ENGINEER
10. COR
Drawing Title:Seal:
FULLY SPRINKLERED
Architect / Engineer Address: Project Title: Date:
Project Number:
Drawing No. :Drawn:
Checked: Reviewed:
Building Number: File Name:
Const. Contract No. :
D C
B A
Revisions:
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
P 704.814.1320 F 704.321.0833
Project Phase:
D C
B A
1 2 3 4 5 6 th re e i n c h e s o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
CENTRAL CHILLED
CD-8 FINAL DOCUMENTS
562-14-5705
August 8, 2019
WATER PLANT DESIGN
FIRST FLOOR FFE: 860.0'
BUILDING 7
A
B
C
D
E
1 2 3 4 5 6
7H A R R E L L D E S I G N G R O U P , P C
FIRST FLOOR
PLUMBING PLAN -
SUPPLY DEMOLITION
PD104
PLUMBING PLAN -
SUPPLY
PP101
HDG PROJECT: 14016
ERIE VAMC
135 EAST 38TH STREET
ERIE, PA 16504-1559
No. Description Date
1 2 3 4 5
Recommended Approvals:
1. MEDICAL DIRECTOR
2. ASSOCIATE DIRECTOR
3. CHIEF OF STAFF
4. ASSOC. DIRECTOR
5. SERVICE LINE MGRS.
6. OPERATIONS SERVICE LINE MANAGER
7. INFECTION CONTROL MANAGER
8. SAFETY MANAGER
9. GENERAL ENGINEER
10. COR
Drawing Title:Seal:
FULLY SPRINKLERED
Architect / Engineer Address: Project Title: Date:
Project Number:
Drawing No. :Drawn:
Checked: Reviewed:
Building Number: File Name:
Const. Contract No. :
D C
B A
Revisions:
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
P 704.814.1320 F 704.321.0833
Project Phase:
D C
B A
1 2 3 4 5 6 th re e i n c h e s o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
CENTRAL CHILLED
CD-8 FINAL DOCUMENTS
562-14-5705
August 8, 2019
WATER PLANT DESIGN
FIRST FLOOR FFE: 860.0'
BUILDING 7
A
B
C
D
E
1 2 3 4 5 6
FIRST FLOOR
SUPPLY
PP102
HDG PROJECT: 14016
ERIE VAMC
135 EAST 38TH STREET
ERIE, PA 16504-1559
No. Description Date
1 2 3 4 5
Recommended Approvals:
1. MEDICAL DIRECTOR
2. ASSOCIATE DIRECTOR
3. CHIEF OF STAFF
4. ASSOC. DIRECTOR
5. SERVICE LINE MGRS.
6. OPERATIONS SERVICE LINE MANAGER
7. INFECTION CONTROL MANAGER
8. SAFETY MANAGER
9. GENERAL ENGINEER
10. COR
Drawing Title:Seal:
FULLY SPRINKLERED
Architect / Engineer Address: Project Title: Date:
Project Number:
Drawing No. :Drawn:
Checked: Reviewed:
Building Number: File Name:
Const. Contract No. :
D C
B A
Revisions:
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
P 704.814.1320 F 704.321.0833
Project Phase:
D C
B A
1 2 3 4 5 6 th re e i n c h e s o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
CENTRAL CHILLED
CD-8 FINAL DOCUMENTS
562-14-5705
August 8, 2019
WATER PLANT DESIGN
FIRST FLOOR FFE: 860.0'
BUILDING 7
A
B
C
D
E
1 2 3 4 5 6
WASTE
PL101
HDG PROJECT: 14016
ERIE VAMC
135 EAST 38TH STREET
ERIE, PA 16504-1559
No. Description Date
1 2 3 4 5
Recommended Approvals:
1. MEDICAL DIRECTOR
2. ASSOCIATE DIRECTOR
3. CHIEF OF STAFF
4. ASSOC. DIRECTOR
5. SERVICE LINE MGRS.
6. OPERATIONS SERVICE LINE MANAGER
7. INFECTION CONTROL MANAGER
8. SAFETY MANAGER
9. GENERAL ENGINEER
10. COR
Drawing Title:Seal:
FULLY SPRINKLERED
Architect / Engineer Address: Project Title: Date:
Project Number:
Drawing No. :Drawn:
Checked: Reviewed:
Building Number: File Name:
Const. Contract No. :
D C
B A
Revisions:
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
P 704.814.1320 F 704.321.0833
Project Phase:
D C
B A
1 2 3 4 5 6 th re e i n c h e s o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
CENTRAL CHILLED
CD-8 FINAL DOCUMENTS
562-14-5705
August 8, 2019
WATER PLANT DESIGN
FIRST FLOOR FFE: 860.0'
BUILDING 7
A
B
C
D
E
1 2 3 4 5 6
FIRST FLOOR
WASTE
PL102
HDG PROJECT: 14016
ERIE VAMC
135 EAST 38TH STREET
ERIE, PA 16504-1559
No. Description Date
1 2 3 4 5
Recommended Approvals:
1. MEDICAL DIRECTOR
2. ASSOCIATE DIRECTOR
3. CHIEF OF STAFF
4. ASSOC. DIRECTOR
5. SERVICE LINE MGRS.
6. OPERATIONS SERVICE LINE MANAGER
7. INFECTION CONTROL MANAGER
8. SAFETY MANAGER
9. GENERAL ENGINEER
10. COR
Drawing Title:Seal:
FULLY SPRINKLERED
Architect / Engineer Address: Project Title: Date:
Project Number:
Drawing No. :Drawn:
Checked: Reviewed:
Building Number: File Name:
Const. Contract No. :
D C
B A
Revisions:
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
P 704.814.1320 F 704.321.0833
Project Phase:
D C
B A
1 2 3 4 5 6 th re e i n c h e s o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t
CENTRAL CHILLED
CD-8 FINAL DOCUMENTS
562-14-5705
August 8, 2019
WATER PLANT DESIGN
FIRST FLOOR FFE: 860.0'
BUILDING 7
A
B
C
D
E
1 2 3 4 5 6
File details come from the government source that posted it. Updated .