S02 Erie Chiller CD 8 Final Documents Submission Drawings 190808-3-61-80.pdf

PDF 21 MB Posted

Attached to
Y1DZ--Chiller Plant construction-Erie VAMC Project Number 562-14-115
Solicitation number
36C24420R0052
Issued by

About this file

This federal contract opportunity solicitation is for the construction of a Chiller Plant for the Department of Veterans Affairs Medical Center in Erie, Pennsylvania. The contractor shall perform all work in accordance with the provided plans and specifications to provide all necessary labor, materials, equipment, permits, testing and reports in compliance with federal, state and local codes for the estimated $5 million to $10 million construction project. The period of performance is 365 calendar days from notice to proceed. This 100% Service-Disabled Veteran Owned Small Business set aside solicitation is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4, and has a North American Industry Classification System code of 236220 for commercial and institutional building construction, with a small business size standard of $36.5 million.

View the file

Other files

File Type Posted
36C24420R0052 0009.docx DOCX document
General Decision Number- PA20200088 08-21-2020.docx DOCX document
36C24420R0052 0008.docx DOCX document
SCHEDULE 01-Add Alternates -2.docx DOCX document
Erie Chiller Amendment 08 200917.pdf PDF
MD102.pdf PDF
AE201.pdf PDF
AE101.pdf PDF
Memo Chiller Plant Questions_HDG Responses.pdf PDF
36C24420R0052 0007.docx DOCX document
AD101.pdf PDF
AE301.pdf PDF
AD200.pdf PDF
GI001.pdf PDF
AD102.pdf PDF
088000 ADD ALTERNATE 1r1.docx DOCX document
AE102.pdf PDF
SCHEDULE 01-Add Alternate.docx DOCX document
36C24420R0052 0006.docx DOCX document
Erie Chiller - Amendment 06.zip ZIP file
36C24420R0052 0005.docx DOCX document
36C24420R0052 0004.docx DOCX document
S02 36C24420R0052 0003.docx DOCX document
Drawing-GS001.pdf PDF
36C24420R0052 0002.docx DOCX document
Sign-in sheet Pre-Proposal meeting held 6-30-2020.pdf PDF
S06 36C24420R0052 0001.docx DOCX document
EXHIBIT B - Subcontractor Information and Consent Form 36C24420R0052.docx DOCX document
Erie Chiller CD 8 Final Documents Submission Specifications 190808.pdf PDF
S02 Erie Chiller CD 8 Final Documents Submission Drawings 190808-2 Pages 41-60.pdf PDF
S02 36C24420R0052-Posted 6-22-2020.docx DOCX document
S02 Erie Chiller CD 8 Final Documents Submission Drawings 190808-1 Pages 1-40.pdf PDF
EXHIBIT A - Past Performance Relevancy Questionnaire 36C24420R0052.docx DOCX document
EXHIBIT C - Calculation of Self-Performed Work 36C24420R0052 3-16-20.docx DOCX document
EXHIBIT D - Sample Transmittal Letter for Past Performance Evaluation Questionnaire 36C24420R0052.docx DOCX document
S02 Erie Chiller CD 8 Final Documents Submission Drawings 190808-4-81-135.pdf PDF
EXHIBIT E - Past Performance Questionnaire 36C24420R0052.docx DOCX document
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRE SPRINKLER

LEGEND, NOTES AND

DETAILS

FX001

HDG PROJECT: 14016

ERIE VAMC

135 EAST 38TH STREET

ERIE, PA 16504-1559

No. Description Date

1 2 3 4 5

Recommended Approvals:

1. MEDICAL DIRECTOR

2. ASSOCIATE DIRECTOR

3. CHIEF OF STAFF

4. ASSOC. DIRECTOR

5. SERVICE LINE MGRS.

6. OPERATIONS SERVICE LINE MANAGER

7. INFECTION CONTROL MANAGER

8. SAFETY MANAGER

9. GENERAL ENGINEER

10. COR

Drawing Title:Seal:

FULLY SPRINKLERED

Architect / Engineer Address: Project Title: Date:

Project Number:

Drawing No. :Drawn:

Checked: Reviewed:

Building Number: File Name:

Const. Contract No. :

D C

B A

Revisions:

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

P 704.814.1320 F 704.321.0833

Project Phase:

D C

B A

1 2 3 4 5 6 th re e i n c h e s o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

CENTRAL CHILLED

CD-8 FINAL DOCUMENTS

562-14-5705

August 8, 2019

WATER PLANT DESIGN

7H A R R E L L D E S I G N G R O U P , P C

BASEMENT FLOOR

FIRE SPRINKLER PLAN

FX101

HDG PROJECT: 14016

ERIE VAMC

135 EAST 38TH STREET

ERIE, PA 16504-1559

No. Description Date

1 2 3 4 5

Recommended Approvals:

1. MEDICAL DIRECTOR

2. ASSOCIATE DIRECTOR

3. CHIEF OF STAFF

4. ASSOC. DIRECTOR

5. SERVICE LINE MGRS.

6. OPERATIONS SERVICE LINE MANAGER

7. INFECTION CONTROL MANAGER

8. SAFETY MANAGER

9. GENERAL ENGINEER

10. COR

Drawing Title:Seal:

FULLY SPRINKLERED

Architect / Engineer Address: Project Title: Date:

Project Number:

Drawing No. :Drawn:

Checked: Reviewed:

Building Number: File Name:

Const. Contract No. :

D C

B A

Revisions:

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

P 704.814.1320 F 704.321.0833

Project Phase:

D C

B A

1 2 3 4 5 6 th re e i n c h e s o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

CENTRAL CHILLED

CD-8 FINAL DOCUMENTS

562-14-5705

August 8, 2019

WATER PLANT DESIGN

FIRST FLOOR FFE: 860.0'

BUILDING 7

A

B

C

D

E

1 2 3 4 5 6

FIRST FLOOR FIRE

SPRINKLER PLAN

FX102

HDG PROJECT: 14016

ERIE VAMC

135 EAST 38TH STREET

ERIE, PA 16504-1559

No. Description Date

1 2 3 4 5

Recommended Approvals:

1. MEDICAL DIRECTOR

2. ASSOCIATE DIRECTOR

3. CHIEF OF STAFF

4. ASSOC. DIRECTOR

5. SERVICE LINE MGRS.

6. OPERATIONS SERVICE LINE MANAGER

7. INFECTION CONTROL MANAGER

8. SAFETY MANAGER

9. GENERAL ENGINEER

10. COR

Drawing Title:Seal:

FULLY SPRINKLERED

Architect / Engineer Address: Project Title: Date:

Project Number:

Drawing No. :Drawn:

Checked: Reviewed:

Building Number: File Name:

Const. Contract No. :

D C

B A

Revisions:

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

P 704.814.1320 F 704.321.0833

Project Phase:

D C

B A

1 2 3 4 5 6 th re e i n c h e s o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

CENTRAL CHILLED

CD-8 FINAL DOCUMENTS

562-14-5705

August 8, 2019

WATER PLANT DESIGN

FIRST FLOOR FFE: 860.0'

BUILDING 7

A

B

C

D

E

1 2 3 4 5 6

PLUMBING LEGEND,

NOTES AND

SCHEDULES

P001

HDG PROJECT: 14016

ERIE VAMC

135 EAST 38TH STREET

ERIE, PA 16504-1559

No. Description Date

1 2 3 4 5

Recommended Approvals:

1. MEDICAL DIRECTOR

2. ASSOCIATE DIRECTOR

3. CHIEF OF STAFF

4. ASSOC. DIRECTOR

5. SERVICE LINE MGRS.

6. OPERATIONS SERVICE LINE MANAGER

7. INFECTION CONTROL MANAGER

8. SAFETY MANAGER

9. GENERAL ENGINEER

10. COR

Drawing Title:Seal:

FULLY SPRINKLERED

Architect / Engineer Address: Project Title: Date:

Project Number:

Drawing No. :Drawn:

Checked: Reviewed:

Building Number: File Name:

Const. Contract No. :

D C

B A

Revisions:

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

P 704.814.1320 F 704.321.0833

Project Phase:

D C

B A

1 2 3 4 5 6 th re e i n c h e s o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

CENTRAL CHILLED

CD-8 FINAL DOCUMENTS

562-14-5705

August 8, 2019

WATER PLANT DESIGN

HDG PROJECT: 14016

ERIE VAMC

135 EAST 38TH STREET

ERIE, PA 16504-1559

No. Description Date

1 2 3 4 5

Recommended Approvals:

1. MEDICAL DIRECTOR

2. ASSOCIATE DIRECTOR

3. CHIEF OF STAFF

4. ASSOC. DIRECTOR

5. SERVICE LINE MGRS.

6. OPERATIONS SERVICE LINE MANAGER

7. INFECTION CONTROL MANAGER

8. SAFETY MANAGER

9. GENERAL ENGINEER

10. COR

Drawing Title:Seal:

FULLY SPRINKLERED

Architect / Engineer Address: Project Title: Date:

Project Number:

Drawing No. :Drawn:

Checked: Reviewed:

Building Number: File Name:

Const. Contract No. :

D C

B A

Revisions:

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

P 704.814.1320 F 704.321.0833

Project Phase:

D C

B A

1 2 3 4 5 6 th re e i n c h e s o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

CENTRAL CHILLED

CD-8 FINAL DOCUMENTS

562-14-5705

August 8, 2019

WATER PLANT DESIGN

FIRST FLOOR FFE: 860.0'

BUILDING 7

A

B

C

D

E

1 2 3 4 5 6

7H A R R E L L D E S I G N G R O U P , P C

BASEMENT FLOOR

PLUMBING PLAN -

WASTE DEMOLITION

PD101

135 EAST 38TH STREET

ERIE, PA 16504-1559

No. Description Date

1 2 3 4 5

Recommended Approvals:

1. MEDICAL DIRECTOR

2. ASSOCIATE DIRECTOR

3. CHIEF OF STAFF

4. ASSOC. DIRECTOR

5. SERVICE LINE MGRS.

6. OPERATIONS SERVICE LINE MANAGER

7. INFECTION CONTROL MANAGER

8. SAFETY MANAGER

9. GENERAL ENGINEER

10. COR

Drawing Title:Seal:

FULLY SPRINKLERED

Architect / Engineer Address: Project Title: Date:

Project Number:

Drawing No. :Drawn:

Checked: Reviewed:

Building Number: File Name:

Const. Contract No. :

D C

B A

Revisions:

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

P 704.814.1320 F 704.321.0833

Project Phase:

D C

B A

1 2 3 4 5 6 th re e i n c h e s o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

CENTRAL CHILLED

CD-8 FINAL DOCUMENTS

562-14-5705

August 8, 2019

WATER PLANT DESIGN

FIRST FLOOR FFE: 860.0'

BUILDING 7

A

B

C

D

E

1 2 3 4 5 6

7H A R R E L L D E S I G N G R O U P , P C

FIRST FLOOR

PLUMBING PLAN -

WASTE DEMOLITION

PD102

135 EAST 38TH STREET

ERIE, PA 16504-1559

No. Description Date

1 2 3 4 5

Recommended Approvals:

1. MEDICAL DIRECTOR

2. ASSOCIATE DIRECTOR

3. CHIEF OF STAFF

4. ASSOC. DIRECTOR

5. SERVICE LINE MGRS.

6. OPERATIONS SERVICE LINE MANAGER

7. INFECTION CONTROL MANAGER

8. SAFETY MANAGER

9. GENERAL ENGINEER

10. COR

Drawing Title:Seal:

FULLY SPRINKLERED

Architect / Engineer Address: Project Title: Date:

Project Number:

Drawing No. :Drawn:

Checked: Reviewed:

Building Number: File Name:

Const. Contract No. :

D C

B A

Revisions:

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

P 704.814.1320 F 704.321.0833

Project Phase:

D C

B A

1 2 3 4 5 6 th re e i n c h e s o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

CENTRAL CHILLED

CD-8 FINAL DOCUMENTS

562-14-5705

August 8, 2019

WATER PLANT DESIGN

FIRST FLOOR FFE: 860.0'

BUILDING 7

A

B

C

D

E

1 2 3 4 5 6

7H A R R E L L D E S I G N G R O U P , P C

BASEMENT FLOOR

PLUMBING PLAN -

SUPPLY DEMOLITION

PD103

135 EAST 38TH STREET

ERIE, PA 16504-1559

No. Description Date

1 2 3 4 5

Recommended Approvals:

1. MEDICAL DIRECTOR

2. ASSOCIATE DIRECTOR

3. CHIEF OF STAFF

4. ASSOC. DIRECTOR

5. SERVICE LINE MGRS.

6. OPERATIONS SERVICE LINE MANAGER

7. INFECTION CONTROL MANAGER

8. SAFETY MANAGER

9. GENERAL ENGINEER

10. COR

Drawing Title:Seal:

FULLY SPRINKLERED

Architect / Engineer Address: Project Title: Date:

Project Number:

Drawing No. :Drawn:

Checked: Reviewed:

Building Number: File Name:

Const. Contract No. :

D C

B A

Revisions:

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

P 704.814.1320 F 704.321.0833

Project Phase:

D C

B A

1 2 3 4 5 6 th re e i n c h e s o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

CENTRAL CHILLED

CD-8 FINAL DOCUMENTS

562-14-5705

August 8, 2019

WATER PLANT DESIGN

FIRST FLOOR FFE: 860.0'

BUILDING 7

A

B

C

D

E

1 2 3 4 5 6

7H A R R E L L D E S I G N G R O U P , P C

FIRST FLOOR

PLUMBING PLAN -

SUPPLY DEMOLITION

PD104

PLUMBING PLAN -

SUPPLY

PP101

HDG PROJECT: 14016

ERIE VAMC

135 EAST 38TH STREET

ERIE, PA 16504-1559

No. Description Date

1 2 3 4 5

Recommended Approvals:

1. MEDICAL DIRECTOR

2. ASSOCIATE DIRECTOR

3. CHIEF OF STAFF

4. ASSOC. DIRECTOR

5. SERVICE LINE MGRS.

6. OPERATIONS SERVICE LINE MANAGER

7. INFECTION CONTROL MANAGER

8. SAFETY MANAGER

9. GENERAL ENGINEER

10. COR

Drawing Title:Seal:

FULLY SPRINKLERED

Architect / Engineer Address: Project Title: Date:

Project Number:

Drawing No. :Drawn:

Checked: Reviewed:

Building Number: File Name:

Const. Contract No. :

D C

B A

Revisions:

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

P 704.814.1320 F 704.321.0833

Project Phase:

D C

B A

1 2 3 4 5 6 th re e i n c h e s o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

CENTRAL CHILLED

CD-8 FINAL DOCUMENTS

562-14-5705

August 8, 2019

WATER PLANT DESIGN

FIRST FLOOR FFE: 860.0'

BUILDING 7

A

B

C

D

E

1 2 3 4 5 6

FIRST FLOOR

SUPPLY

PP102

HDG PROJECT: 14016

ERIE VAMC

135 EAST 38TH STREET

ERIE, PA 16504-1559

No. Description Date

1 2 3 4 5

Recommended Approvals:

1. MEDICAL DIRECTOR

2. ASSOCIATE DIRECTOR

3. CHIEF OF STAFF

4. ASSOC. DIRECTOR

5. SERVICE LINE MGRS.

6. OPERATIONS SERVICE LINE MANAGER

7. INFECTION CONTROL MANAGER

8. SAFETY MANAGER

9. GENERAL ENGINEER

10. COR

Drawing Title:Seal:

FULLY SPRINKLERED

Architect / Engineer Address: Project Title: Date:

Project Number:

Drawing No. :Drawn:

Checked: Reviewed:

Building Number: File Name:

Const. Contract No. :

D C

B A

Revisions:

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

P 704.814.1320 F 704.321.0833

Project Phase:

D C

B A

1 2 3 4 5 6 th re e i n c h e s o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

CENTRAL CHILLED

CD-8 FINAL DOCUMENTS

562-14-5705

August 8, 2019

WATER PLANT DESIGN

FIRST FLOOR FFE: 860.0'

BUILDING 7

A

B

C

D

E

1 2 3 4 5 6

WASTE

PL101

HDG PROJECT: 14016

ERIE VAMC

135 EAST 38TH STREET

ERIE, PA 16504-1559

No. Description Date

1 2 3 4 5

Recommended Approvals:

1. MEDICAL DIRECTOR

2. ASSOCIATE DIRECTOR

3. CHIEF OF STAFF

4. ASSOC. DIRECTOR

5. SERVICE LINE MGRS.

6. OPERATIONS SERVICE LINE MANAGER

7. INFECTION CONTROL MANAGER

8. SAFETY MANAGER

9. GENERAL ENGINEER

10. COR

Drawing Title:Seal:

FULLY SPRINKLERED

Architect / Engineer Address: Project Title: Date:

Project Number:

Drawing No. :Drawn:

Checked: Reviewed:

Building Number: File Name:

Const. Contract No. :

D C

B A

Revisions:

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

P 704.814.1320 F 704.321.0833

Project Phase:

D C

B A

1 2 3 4 5 6 th re e i n c h e s o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

CENTRAL CHILLED

CD-8 FINAL DOCUMENTS

562-14-5705

August 8, 2019

WATER PLANT DESIGN

FIRST FLOOR FFE: 860.0'

BUILDING 7

A

B

C

D

E

1 2 3 4 5 6

FIRST FLOOR

WASTE

PL102

HDG PROJECT: 14016

ERIE VAMC

135 EAST 38TH STREET

ERIE, PA 16504-1559

No. Description Date

1 2 3 4 5

Recommended Approvals:

1. MEDICAL DIRECTOR

2. ASSOCIATE DIRECTOR

3. CHIEF OF STAFF

4. ASSOC. DIRECTOR

5. SERVICE LINE MGRS.

6. OPERATIONS SERVICE LINE MANAGER

7. INFECTION CONTROL MANAGER

8. SAFETY MANAGER

9. GENERAL ENGINEER

10. COR

Drawing Title:Seal:

FULLY SPRINKLERED

Architect / Engineer Address: Project Title: Date:

Project Number:

Drawing No. :Drawn:

Checked: Reviewed:

Building Number: File Name:

Const. Contract No. :

D C

B A

Revisions:

8016 TOWER POINT DRIVE

CHARLOTTE, NC 28227

P 704.814.1320 F 704.321.0833

Project Phase:

D C

B A

1 2 3 4 5 6 th re e i n c h e s o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t o n e h a lf i n c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t

CENTRAL CHILLED

CD-8 FINAL DOCUMENTS

562-14-5705

August 8, 2019

WATER PLANT DESIGN

FIRST FLOOR FFE: 860.0'

BUILDING 7

A

B

C

D

E

1 2 3 4 5 6

File details come from the government source that posted it. Updated .