EXHIBIT D - Safety Data Sheet.docx
DOCX document 17 KB Posted
- Attached to
- P-391 F35C Hangar 6, Phase 2
- Solicitation number
- N6247320R0069
About this file
This document contains a safety data sheet template to be completed by offerors responding to solicitation N6247320R0069. The solicitation is for the design and construction of a two-module two-story Type 1 aircraft maintenance hangar addition and supporting facilities at Naval Facilities Engineering Command, Southwest. Offerors must provide safety ratings and narratives describing their safety management systems and subcontractor evaluation processes. Details include experience modification rates, OSHA recordable incident rates, corrective actions for unfavorable trends, insurance information, and innovative safety methods.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002.pdf | ||
| Surety Form.doc | DOC document | |
| Financial Questionnaire.doc | DOC document | |
| Exhibit F - Small Business Participation Plan - Revised 9-20.docx | DOCX document | |
| Exhibit B - Experience - Offeror.docx | DOCX document | |
| Exhibit B - Experience - Designer.docx | DOCX document | |
| Amendment 0001.pdf | ||
| Exhibit E - Safety Data Sheet.docx | DOCX document | |
| Exhibit C - PPQ.docx | DOCX document | |
| Exhibit D - Past Performance - Small Business Utilization.docx | DOCX document | |
| Exhibit A - Offeror Team Composition and Management.docx | DOCX document | |
| EXHIBIT B - Experience - Offeror.docx | DOCX document | |
| EXHIBIT E - Small Business Participation Plan.docx | DOCX document | |
| EXHIBIT A - Construction Experience.docx | DOCX document | |
| N62473-20-R-0069 Solicitation.pdf | ||
| Exhibit B - Experience - Designer.docx | DOCX document | |
| EXHIBIT C - PPQ.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT “D”
SAFETY DATA SHEET
N62473-20-R-0069
This form is to be completed by the Offeror. Use this form to provide safety information for the Safety factor. EMR, DART and TRC rates shall not be submitted for subcontractors.
Joint Venture (JV) or Partnership: Complete Blocks 1 through 8 for each contractor who is part of the JV or partnership. Only one safety narrative (Block 9) is required.
1. Offeror Name:
Name of JV partner providing the information below (if applicable):
Offeror’s Three Previous Complete Calendar Years of Reported Safety Data:
Only complete year safety data will be considered. Indicate data rates as decimal figures, not whole numbers.
| 2. Experience Modification Rate (EMR): |
| 2017 |
| 2018 |
| 2019 |
3a. For EMRs greater than 1.0, explain any extenuating circumstances and corrective actions taken:
3b. Explain any negative EMR trends:
3c. If you do not have an EMR for a given year, state so here and explain why:
4. Insurance Carrier Information:
Insurance Carrier Name:
| Agent’s name: |
| Phone No.: |
| Email: |
| 5. U.S. Dept. of Labor, OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate |
| 2017 |
| 2018 |
| 2019 |
Instructions for calculating the DART rate can be found at http://www.bls.gov/iif/osheval.htm.
6a. For DART Rates of 3.0 or greater, explain any extenuating circumstances and corrective actions taken:
6b. Explain any negative DART Rate trends:
6c. If you do not have a DART Rate for a given year, state so here and explain why:
Note: Form may be expanded.
EXHIBIT “D” (continuation)
SAFETY NARRATIVE
N62473-20-R-0069
| 7. U.S. Dept. of Labor, OSHA Total Recordable Case (TRC) Rate | |
| 2017 | |
| 2018 | |
| 2019 |
Instructions for calculating the TRC rate can be found at http://www.bls.gov/iif/osheval.htm.
8a. For TRC Rates of 4.5 or greater, explain any extenuating circumstances and corrective actions taken:
8b. Explain any negative TRC Rate trends:
8c. If you do not have a TRC Rate for a given year, state so here and explain why:
EXHIBIT “D” (continuation)
N62473-20-R-0069
9. Technical Approach for Safety: Provide the Safety Narrative using this form. Do not exceed page limitation specified in the RFP. Any additional pages will not be considered.
Describe the plan for safety that the Offeror will implement to evaluate safety performance of potential subcontractors, as a part of the selection process for all levels of subcontractors:
Describe the safety management system that the Offeror will use to oversee the safety compliance and performance of self-performed and subcontractor performed work:
Note: Form may be expanded up to the page limit specified in the RFP.
EXHIBIT “D” (continuation)
N62473-20-R-0069
9. Technical Approach for Safety (continuation): Provide the Safety Narrative using this form. Do not exceed page limitation specified in the RFP. Any additional pages will not be considered.
Describe any innovative methods that the Offeror will employ to ensure and monitor safe work practices at self-performed and all subcontractor levels:
Describe the methodology that the Offeror will use in order to execute an effective program that facilitates sound mishap prevention techniques and processes, employee reporting of unsafe conditions, unsafe activities, and near-miss mishaps:
Describe the Offeror’s “Good Catch” Program:
File details come from the government source that posted it. Updated .