Summary of Exhibit D – Performance Requirements Summary (PRS)
This document is a Performance Requirements Summary that establishes five key performance objectives for a service contract involving article processing and delivery. The contractor must: (1) submit all deliverables identified in the PWS Exhibit C within established timeframes; (2) comply with security requirements 100% of the time as referenced in PWS paragraphs 1.4.2.6, 1.17, and 1.18; (3) meet turn-around times (pick-up and delivery) at least 95% of each month per PWS Paragraph 5.1 and Exhibit B; (4) ensure at least 95% of processed articles each month meet quality standards for cleanliness, finish, and appearance with no more than 5% requiring rework; and (5) ensure at least 95% of processed articles are returned to the Medical Treatment Facility (MTF) in prescribed packaging and transportation condition.
Surveillance and monitoring will be conducted through COR-maintained logs with 100% inspection for objectives 1-3, and random sampling with customer feedback for quality and packaging objectives. All performance metrics will be documented in the Contractor Performance Assessment Reporting System (CPARS), with performance rated as above or below standard. The document references specific PWS sections for detailed requirements, including Paragraph 5.5 for quality standards and Paragraph 5.8 for packaging specifications.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT D – PERFORMANCE REQUIREMENTS SUMMARY (PRS)
PERFORMANCE
OBJECTIVE
ACCEPTABLE QUALITY
LEVEL
REFERENCE SURVEILLANCE
METHOD
PERFORMANCE
INCENTIVE/DISINCE
NTIVE
(1) Submit deliverables identified in Exhibit C of the
PWS
Provide within the time frames established in the
PWS.
PWS Exhibit C COR maintain log / Annual review (100% Inspection)
Performance above or below the standard will be documented in the Contractor Performance Assessment Reporting System (CPARS).
(2) Comply with security requirements.
Comply initially and as required 100% of the time.
PWS Paragraph 1.4.2.6, 1.17, 1.18
COR maintain log (100% Inspection).
Performance above or below the standard will be documented in
CPARS.
(3) Comply with turn-around (pick-up and delivery) times listed herein.
Shall meet turn-around times at least 95% of the time each month.
PWS Paragraph 5.1 / Exhibit B.
COR maintain log (100% Inspection).
Performance above or below the standard will be documented in
CPARS.
(4) Delivery of finished articles shall conform to the quality of cleanliness, finish, and appearance requirements listed herein.
At least 95% of the articles processed each month shall be completed as prescribed.
(No more than 5% of the articles processed each month shall require re-work.)
PWS Paragraph 5.5. Random Sampling / Customer Feedback.
Performance above or below the standard will be documented in
CPARS.
(5) Delivery of finished articles shall conform to the packaging and transporting requirements listed herein.
At least 95% of the articles processed each month shall be returned to the MTF in the prescribed manner.
PWS Paragraph 5.8, Exhibit A
Random Sampling / Customer Feedback.
Performance above or below the standard will be documented in
CPARS.