Exhibit_D_-_CM_Staff_Adendum_Rate_Form.pdf
PDF 99 KB Posted
- Solicitation number
- RFQ-26-3
- Issued by
- Brevard County, Florida
About this file
This document is a Construction Management at Risk Services Rates and Fees Schedule Addendum (Exhibit D) prepared by the Canaveral Port Authority in Florida for waterside construction management services. The schedule establishes labor rates and fee structures for construction management personnel and self-performed trade labor across projects of varying values. The CM staff classifications include nine management positions: Project Executive, Project Manager, Pre-Construction Manager/Estimator, Scheduler, Project Coordinator/Engineer, Superintendent, Assistant Superintendent, Project Accountant, and Project Administrator, each with defined responsibilities ranging from executive oversight to administrative support. The document also lists approximately thirty self-performed labor classifications including trade workers such as electricians, plumbers, carpenters, roofers, and marine-related personnel such as sailors, captains, and dredge operators, reflecting the waterside construction focus of the Port Authority's continuing services contract.
The fee structure differentiates between self-performed work and subcontracted work across five project value tiers: less than $10,000, $10,000 to $50,000, $50,000 to $250,000, $250,000 to $500,000, and above $500,000. For both self-performed and subcontracted work categories, general conditions overhead and fee percentages are calculated as actual cost reimbursable amounts based on the actual cost of work in Divisions 2 through 40. The document does not display the specific hourly rates, overhead percentages, or fee percentages in the provided content, indicating these values were either redacted or omitted from the available file pages. This addendum applies to the Canaveral Port Authority's continuing services contract for waterside construction management, which encompasses projects to construct, repair, refurbish, renovate, and upgrade waterside facilities including berths, piers, fenders, mooring dolphins, bollards, and underwater inspections.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Canaveral Port Authority Construction Management at Risk Services
Rates and Fees Schedule
CM Staff Labor Rates Class Job Title Description Base Rate
Project Executive
Project Executive is the President, CEO, COO or person responsible with signature authority for all legal binding documents and is the final authority for all negotiations.
Project Manager Project Manager is the managing authority for the project from project initiation to completion.
Pre-Con Manager/ Estimator
Pre-construction Manager/Estimator is responsible for all pre-construction activities including estimating, bid preparation, and GMP proposal.
Scheduler Schedule is responsible for scheduling the project from initial design through project completion.
Project Coordinator/
Engineer
Project Coordinator/Engineer is responsible for all the field correspondence and document control duties including assisting the Project Manager.
Superintendent
Superintendent is responsible for coordinating, directing and overseeing the completion of all field activities as they relate to the performance of all trades on the project including subcontractors and suppliers.
Assistant Superintendent
Assistant Superintendent is responsible for assisting the Superintendent in overseeing the duties and responsibilities with directing the work in the field.
Accountant
Project Accountant is responsible for all accounting function of the project including the preparation of all pay requests, Owner Direct Purchases and all other monetary duties.
Administrator
Project Administrator is responsible for all clerical duties related to the project.
Percent of Job Costs (Self Perform) Project Value General Conditions Overhead
Fee
Less than $ 10,000 Actual Cost - Reimbursable $ 10,000 to $ 50,000 Actual Cost - Reimbursable $ 50,000 to $250,000 Actual Cost - Reimbursable $250,000 to $500,000 Actual Cost - Reimbursable Above $500,000 Actual Cost - Reimbursable
% calculated on actual cost of work in Divisions 2 through 40.
bcrowe Typewritten Text Exhibit D - Construction Managers Staff Addendum bcrowe Typewritten Text bcrowe Typewritten Text bcrowe Typewritten Text bcrowe Typewritten Text
Construction Management at Risk Services Rates and Fee Schedule
Percent of Job Costs (Subcontracted) Project Value General Conditions Overhead
Fee
Less than $ 10,000 Actual Cost - Reimbursable $ 10,000 to $ 50,000 Actual Cost - Reimbursable $ 50,000 to $250,000 Actual Cost - Reimbursable $250,000 to $500,000 Actual Cost - Reimbursable Above $500,000 Actual Cost - Reimbursable
Self-Performed Labor Rates with Burden (No Fee) Class Job Title Base Rate
Foreman Surveyor/Layout Boilermakers Brickmasons and Blockmasons Carpenters Carpet Installers Floor Layers, Except Carpet, Wood, and Hard Tiles Tile and Marble Setters Cement Masons and Concrete Finishers Construction Laborers Drywall and Ceiling Tile Installers Electricians Glaziers Painters Plumbers, Pipefitters, and Steamfitters Plasterers and Stucco Masons Reinforcing Iron and Rebar Workers Roofers Sheet Metal Workers Structural Iron and Steel Workers Fence Erectors Welders, Cutters, Solderers, and Brazers Cabinetmakers and Bench Carpenters Sailors and Marine Oilers Captains, Mates, and Pilots of Water Vessels Automotive and Watercraft Service Attendants Crane and Tower Operators Dredge Operators Excavating, Loading and Dragline Operators Material Moving Workers
| ClassRow1: |
| Base RateProject Executive is the President CEO COO or person responsible with signature authority for all legal binding documents and is the final authority for all negotiations: |
| ClassRow2: |
| Base RateProject Manager is the managing authority for the project from project initiation to completion: |
| ClassRow3: |
| Base RatePreconstruction ManagerEstimator is responsible for all pre construction activities including estimating bid preparation and GMP proposal: |
| ClassRow4: |
| Base RateSchedule is responsible for scheduling the project from initial design through project completion: |
| ClassRow5: |
| Base RateProject CoordinatorEngineer is responsible for all the field correspondence and document control duties including assisting the Project Manager: |
| ClassRow6: |
| Base RateSuperintendent is responsible for coordinating directing and overseeing the completion of all field activities as they relate to the performance of all trades on the project including subcontractors and suppliers: |
| ClassRow7: |
| Base RateAssistant Superintendent is responsible for assisting the Superintendent in overseeing the duties and responsibilities with directing the work in the field: |
| ClassRow8: |
| Base RateProject Accountant is responsible for all accounting function of the project including the preparation of all pay requests Owner Direct Purchases and all other monetary duties: |
| ClassRow9: |
| Base RateProject Administrator is responsible for all clerical duties related to the project: |
| ClassRow10: |
| Project AdministratorRow1: |
| Project Administrator is responsible for all clerical duties related to the projectRow1: |
| Base RateRow10: |
| ClassRow11: |
| Project AdministratorRow2: |
| Project Administrator is responsible for all clerical duties related to the projectRow2: |
| Base RateRow11: |
| ClassRow12: |
| Project AdministratorRow3: |
| Project Administrator is responsible for all clerical duties related to the projectRow3: |
| Base RateRow12: |
| Overhead Actual Cost Reimbursable_2: |
| Overhead Actual Cost Reimbursable_3: |
| Overhead Actual Cost Reimbursable_4: |
| Overhead Actual Cost Reimbursable_5: |
| Overhead Actual Cost Reimbursable_7: |
| Overhead Actual Cost Reimbursable_8: |
| Overhead Actual Cost Reimbursable_9: |
| Overhead Actual Cost Reimbursable_10: |
| ClassRow1_2: |
| Base RateForeman: |
| ClassRow2_2: |
| Base RateSurveyorLayout: |
| ClassRow3_2: |
| Base RateBoilermakers: |
| ClassRow4_2: |
| Base RateBrickmasons and Blockmasons: |
| ClassRow5_2: |
| Base RateCarpenters: |
| ClassRow6_2: |
| Base RateCarpet Installers: |
| ClassRow7_2: |
| Base RateFloor Layers Except Carpet Wood and Hard Tiles: |
| ClassRow8_2: |
| Base RateTile and Marble Setters: |
| ClassRow9_2: |
| Base RateCement Masons and Concrete Finishers: |
| ClassRow10_2: |
| Base RateConstruction Laborers: |
| ClassRow11_2: |
| Base RateDrywall and Ceiling Tile Installers: |
| ClassRow12_2: |
| Base RateElectricians: |
| ClassRow13: |
| Base RateGlaziers: |
| ClassRow14: |
| Base RatePainters: |
| ClassRow15: |
| Base RatePlumbers Pipefitters and Steamfitters: |
| ClassRow16: |
| Base RatePlasterers and Stucco Masons: |
| ClassRow17: |
| Base RateReinforcing Iron and Rebar Workers: |
| ClassRow18: |
| Base RateRoofers: |
| ClassRow19: |
| Base RateSheet Metal Workers: |
| ClassRow20: |
| Base RateStructural Iron and Steel Workers: |
| ClassRow21: |
| Base RateFence Erectors: |
| ClassRow22: |
| Base RateWelders Cutters Solderers and Brazers: |
| ClassRow23: |
| Base RateCabinetmakers and Bench Carpenters: |
| ClassRow24: |
| Base RateSailors and Marine Oilers: |
| ClassRow25: |
| Base RateCaptains Mates and Pilots of Water Vessels: |
| ClassRow26: |
| Base RateAutomotive and Watercraft Service Attendants: |
| ClassRow27: |
| Base RateCrane and Tower Operators: |
| ClassRow28: |
| Base RateDredge Operators: |
| ClassRow29: |
| Base RateExcavating Loading and Dragline Operators: |
| ClassRow30: |
| Base RateMaterial Moving Workers: |
| ClassRow31: |
| Material Moving WorkersRow1: |
| Base RateRow31: |
| ClassRow32: |
| Material Moving WorkersRow2: |
| Base RateRow32: |
| ClassRow33: |
| Material Moving WorkersRow3: |
| Base RateRow33: |
| Overhead Actual Cost Reimbursable: |
| Fee Actual Cost Reimbursable: |
| Overhead Actual Cost Reimbursable_6: |
| Fee Actual Cost Reimbursable_6: |
| COMPANY NAME: |