EXHIBIT C - calculation of self-performed work.docx

DOCX document 39 KB Posted

Attached to
Z1NB--595-13-101 Renovate Boiler Plant Project# 595-13-101
Solicitation number
36C24423R0002
Issued by

About this file

This document outlines requirements for calculating self-performed work on a federal construction contract. It provides a template for offerors to identify and calculate the cost of work to be self-performed in response to solicitation number 36C24423R0002 for renovations to the boiler plant at a Veterans Affairs medical center. Offerors must use the template to show that at least 15% of the total contract value will be self-performed, defined as work completed using the prime contractor's own employees, equipment, materials, and resources. Additional consideration may be given to offerors that can self-perform specialty trades like prefabricated concrete work. The template requires offerors to list the self-performed work, calculate the total contract value, subtract non-self-performed specialty trades and overhead costs, and show that the remaining self-performed amount meets the 15% minimum threshold.

View the file

Other files

File Type Posted
2021-03-26 Bid Documents - Drawing PDFs 01_Civil_.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 02_Structural_.pdf PDF
Lebanon Boiler_Bid Specs_Vol I.pdf PDF
Lebanon Boiler_Bid Specs_Vol II.pdf PDF
Asbestos Report - Building 10.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 03_Plumbing_.pdf PDF
36C24423R0002 0002.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 05_Electrical_.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 04_Mechanical_.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 03a_Life Safety_.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 00_General Information_.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 02a_Fire Protection_.pdf PDF
36C24423R0002 0001.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 03_Plumbing.pdf PDF
EXHIBIT B - subcontractor information and consent form.docx DOCX document
2021-03-26 Bid Documents - Drawing PDFs 04_Mechanical.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 02_Structural.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 02a_Fire Protection.pdf PDF
2020-09-02 Vol II Specifications - Bid Submission.pdf PDF
EXHIBIT A - Past Performance Relevancy Questionnaire.docx DOCX document
36C24423R0002.docx DOCX document
EXHIBIT E - past performance questionnaire.docx DOCX document
EXHIBIT D - sample transmittal letter.docx DOCX document
2021-03-26 Bid Documents - Drawing PDFs 05_Electrical.pdf PDF
2020-09-02 Vol I Specifications - Bid Submission.pdf PDF
Locks - J and A_Posted.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 01_Civil.pdf PDF
Wage Determination PA20230093.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 00_General Information.pdf PDF
Brand Name or Equal Items.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 03a_Life Safety.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT C - CALCULATION OF SELF-PERFORMED WORK

EXHIBIT C - CALCULATION OF SELF-PERFORMED WORK

SUBMITTED IN RESPONSE TO: Request for Proposal 36C24423R0002

Use a format similar to the following to identify and calculate cost of the work to be self-performed. Refer to the definitions pertaining to “Self-performance of work”, “On the Site” and “Total amount of work to be performed under the contract”.

Explain in detail how you will perform the minimum percentage required (15% GC) with your own resources. Note: An offeror who has the capability to perform both as a General contractor and self-perform a major element of construction, for example, pre-fabricated concrete, may be afforded additional consideration in the evaluation. You should address your general self-performance capability.

(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)

Clearly describe the work to be self-performed:

Show Calculation of Self-Performed work:

B.1 Total Offer Price: $

B.2 If applying for consideration as a General Contractor subtract Specialty Trades (Unless being self-performed)

B.3 Subtract G&A, home office overhead, prime contractor’s markups for profit, bond, state use tax, etc. ($)

B.4 Remainder is “Total amount of work to be performed under the Contract” = $

B.5 “Work to be self-performed”: = $ Amount shown on this line should match the amount shown for “Show Calculation of Self-Performed work”?

(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)

B.6 15 % Self-performed Work = Line B.5 / B.4 X 100% = %

File details come from the government source that posted it. Updated .