This document is an amendment to a solicitation for a boiler plant renovation project. The Department of Veterans Affairs is seeking to renovate the boiler plant at Project #595-13-101. All technical questions must be submitted by February 9, 2023 at 1:00 PM EST to Melvin Moore at melvin.moore2@va.gov via email. The amendment clarifies the technical questions due date and confirms that all other terms and conditions of Solicitation 36C24423R0002 remain unchanged. Offerors are required to acknowledge receipt of the amendment prior to the deadline.

View the file

Other files

File Type Posted
2021-03-26 Bid Documents - Drawing PDFs 01_Civil_.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 02_Structural_.pdf PDF
Lebanon Boiler_Bid Specs_Vol I.pdf PDF
Lebanon Boiler_Bid Specs_Vol II.pdf PDF
Asbestos Report - Building 10.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 03_Plumbing_.pdf PDF
36C24423R0002 0002.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 05_Electrical_.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 04_Mechanical_.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 03a_Life Safety_.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 00_General Information_.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 02a_Fire Protection_.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 03_Plumbing.pdf PDF
EXHIBIT B - subcontractor information and consent form.docx DOCX document
2021-03-26 Bid Documents - Drawing PDFs 04_Mechanical.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 02_Structural.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 02a_Fire Protection.pdf PDF
2020-09-02 Vol II Specifications - Bid Submission.pdf PDF
EXHIBIT A - Past Performance Relevancy Questionnaire.docx DOCX document
36C24423R0002.docx DOCX document
EXHIBIT E - past performance questionnaire.docx DOCX document
EXHIBIT D - sample transmittal letter.docx DOCX document
EXHIBIT C - calculation of self-performed work.docx DOCX document
2021-03-26 Bid Documents - Drawing PDFs 05_Electrical.pdf PDF
2020-09-02 Vol I Specifications - Bid Submission.pdf PDF
Locks - J and A_Posted.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 01_Civil.pdf PDF
Wage Determination PA20230093.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 00_General Information.pdf PDF
Brand Name or Equal Items.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 03a_Life Safety.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

0001 2/2/2023 595-13-101

00244

Department of Veterans Affairs Network Contracting Office 4

00244

Department of Veterans Affairs Network Contracting Office 4

To all Offerors/Bidders 36C24423R0002

02-02-2023 X

X 1

Boiler Plant Renovation Project # 595-13-101

This amendment is being issued to clarify the Technical Questions Due Date All Technical Questions MUST BE Submitted by Thursday February 09, 2023 NLT 1:00 P.M. EST.

To the Contracting Officer - Attention: Melvin Moore at melvin.moore2@va.gov All submissions must be submitted by electronic submission (email)

All other Terms and Conditions Remain unchanged.

Melvin Moore Contracting Officer

02 Feb 2023

Boiler Plant Renovation Project # 595-13-101