This document provides details for a federal contract solicitation to renovate a boiler plant. The solicitation number is 36C24423R0002 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4 for the Z1NB--595-13-101 Renovate Boiler Plant Project# 595-13-101. The description indicates the solicitation is for a boiler plant renovation project numbered 595-13-101. No other details are provided on products or services required, response dates, pricing terms, or other salient information.

View the file

Other files

File Type Posted
2021-03-26 Bid Documents - Drawing PDFs 01_Civil_.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 02_Structural_.pdf PDF
Lebanon Boiler_Bid Specs_Vol I.pdf PDF
Lebanon Boiler_Bid Specs_Vol II.pdf PDF
Asbestos Report - Building 10.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 03_Plumbing_.pdf PDF
36C24423R0002 0002.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 05_Electrical_.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 03a_Life Safety_.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 00_General Information_.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 02a_Fire Protection_.pdf PDF
36C24423R0002 0001.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 03_Plumbing.pdf PDF
EXHIBIT B - subcontractor information and consent form.docx DOCX document
2021-03-26 Bid Documents - Drawing PDFs 04_Mechanical.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 02_Structural.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 02a_Fire Protection.pdf PDF
2020-09-02 Vol II Specifications - Bid Submission.pdf PDF
EXHIBIT A - Past Performance Relevancy Questionnaire.docx DOCX document
36C24423R0002.docx DOCX document
EXHIBIT E - past performance questionnaire.docx DOCX document
EXHIBIT D - sample transmittal letter.docx DOCX document
EXHIBIT C - calculation of self-performed work.docx DOCX document
2021-03-26 Bid Documents - Drawing PDFs 05_Electrical.pdf PDF
2020-09-02 Vol I Specifications - Bid Submission.pdf PDF
Locks - J and A_Posted.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 01_Civil.pdf PDF
Wage Determination PA20230093.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 00_General Information.pdf PDF
Brand Name or Equal Items.pdf PDF
2021-03-26 Bid Documents - Drawing PDFs 03a_Life Safety.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5 6 7

A

8 9

B

C

D

C.2

B.310

14 14 14

CHILLER PLANT

TOILET/LOCKER

ROOM

CONTROL ROOM

GENERATOR

ROOM

OFFICE

TOOL ROOM

BOILER ROOM

FD FD FD

FD

FD

PUMP ROOM

PUMP PIT

EXISTING PAD TO BE REMOVED

SEE STRUCTURAL DRAWINGS

(E)SINK CABINET

SEE PLUMBING DWGS

(E)SAFETY SHOWER

SEE PLUMBING DWGS

(E)STEAM TUNNEL

BUILDING 10

UP

DN

12X10 EA

12X10 EA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t

PLAN

NORTH

ACTUAL

NORTH

/2

/2

:0

:0

P

M

MD101

MECHANICAL DEMOLITION PLAN - 0'-0" TO 8'-0"

AFF OF BOILER ROOM

LEBANON BOILER PLANT

RENOVATION

1700 S. LINCOLN AVE.

LEBANON, PA 17024

595-13-101

2021-03-26 JJM JJP0499-0106

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"

1 MECHANICAL DEMOLITION PLAN - 0'-0" TO 8'-0" AFF OF BOILER ROOM

1. REMOVE THE THREE FEED WATER PUMPS AND ASSOCIATED FEED WATER PIPING INCLUDING SUCTION, DISCHARGE, AND RECIRCULATION PIPING AND ASSOCIATED INSULATION, HANGERS, AND

SUPPORTS IN ITS ENTIRETY, FROM THE DEAERATOR TO THE FEED WATER PUMPS AND FROM THE FEED WATER PUMPS TO THE BOILERS. REMOVE ALL ASSOCIATED INLINE DEVICES

INCLUDING ALL VALVES, STRAINERS, FLEX CONNECTORS, GAUGES AND SENSORS. REMOVE THE ASSOCIATED FEEDWATER PUMP CONCRETE PADS.

2. REMOVE THE THREE CONDENSATE TRANSFER PUMPS AND ASSOCIATED CONDENSATE TRANSFER PIPING INCLUDING SUCTION, DISCHARGE, AND RECIRCULATION PIPING AND ASSOCIATED

INSULATION, HANGERS, AND SUPPORTS IN ITS ENTIRETY, FROM THE SURGE TANK TO THE TRANSFER PUMPS AND FROM THE TRANSFER PUMPS TO THE DEAERATOR. REMOVE ALL

ASSOCIATED INLINE DEVICES INCLUDING ALL VALVES, STRAINERS, FLEX CONNECTORS, GAUGES AND SENSORS. REMOVE THE ASSOCIATED TRANSFER PUMP CONCRETE PADS.

3. REMOVE CONDENSATE SURGE TANK AND ASSOCIATED PIPING, INCLUDING HIGH PRESSURE CONDENSATE, LOW PRESSURE CONDENSATE, PUMPED CONDENSATE, SOFTENED WATER, COLD

WATER, CHEMICAL FEED, RECIRCULATION, OVERFLOW, DRAIN, SAMPLE, AND VENT PIPING THROUGH THE ROOF, AND ASSOCIATED PIPE INSULATION, HANGERS AND SUPPORTS IN ITS

ENTIRETY. REMOVE ALL ASSOCIATED INLINE DEVICES INCLUDING ALL VALVES, STRAINERS, GAUGES AND SENSORS.

4. REMOVE THE BLOW DOWN TANK AND ASSOCIATED FLASH TANK, RECIRC TANK, AND PLATE AND FRAME HEAT EXCHANGER. REMOVE ALL ASSOCIATED BOTTOM BLOW DOWN AND SURFACE

BLOW DOWN PIPING, VENT, FLASH STEAM, CONDENSATE, DRAIN, AND COLD WATER PIPING FROM THE BOILERS TO THE FLASH TANK AND BLOW DOWN TANK. REMOVE ALL ASSOCIATED

PIPING BETWEEN THE FLASH TANK AND BLOW DOWN TANK AND THE DEAERATOR AND THE CONDENSATE SURGE TANK. REMOVE ALL INLINE DEVICES INCLUDING ALL ASSOCIATED PUMPS, VALVES, STRAINERS, TRAPS, GAUGES AND SENSORS.

5. REMOVE THE 10"HPS FEEDING THE SITE BUILDINGS FROM THE STEAM HEADER TO THE PRESSURE REDUCING STATION AND FROM THE PRESSURE REDUCING STATION TO AND INCLUDING THE

FIRST FITTING INSIDE THE WALL OF BUILDING 10. REMOVE ASSOCIATED STEAM TRAPS AND CONDENSATE PIPING. INCLUDE ALL ASSOCIATED INSULATION, HANGERS, AND SUPPORTS.

PROVIDE NEW 10" HPS SPOOL PIECE, DRIP LEG AND STEAM TRAP FOR CONNECTION OF TEMPORARY AND NEW STEAM PIPING.

6. REMOVE THE 4"HPS FEEDING THE LAUNDRY BUILDING FROM THE STEAM HEADER TO AND INCLUDING THE FIRST FITTING INSIDE THE WALL OF BUILDING 10. REMOVE ASSOCIATED STEAM

TRAPS AND CONDENSATE PIPING. INCLUDE ALL ASSOCIATED INSULATION, HANGERS, AND SUPPORTS. PROVIDE NEW 4" HPS SPOOL PIECE, DRIP LEG AND STEAM TRAP FOR CONNECTION

OF TEMPORARY AND NEW STEAM PIPING.

7. REMOVE THE 4" DR, 5" VR, AND 4"PR RETURN PIPING FROM, AND INCLUDING, THE FIRST FITTING INSIDE THE WALL OF BUILDING 10 TO THE CONDENSATE SURGE TANK. INCLUDE ALL

ASSOCIATED FLEXIBLE EXPANSION LOOPS, CONDENSATE LIFT PUMPS, INSULATION, HANGERS, AND SUPPORTS. PROVIDE NEW 2" HPC SPOOL PIECE FOR CONNECTION OF TEMPORARY AND

NEW CONDENSATE PIPING.

8. REMOVE THE TWO INLINE CONDENSATE RETURN PUMPS (LOCATED BELOW GRATING) AND ASSOCIATED SUCTION AND DISCHARGE PIPING, INSULATION, VALVES, HANGERS AND SUPPORTS.

9. REMOVE THE BOILER CHEMICAL FEED SYSTEM IN ITS ENTIRETY, INCLUDING ALL ASSOCIATED PUMPS, PIPING VALVES, AND INLINE DEVICES, HANGERS AND SUPPORTS.

10. REMOVE THE BOILER STACK IN ITS ENTIRETY FROM EACH OF THE BOILERS.

11. REMOVE THE AIR COMPRESSOR AND ASSOCIATED HORIZONTAL COMPRESSOR MOUNTED RECEIVER AND THE ASSOCIATED VERTICAL 476-GALLON RECEIVER. INCLUDE ALL ASSOCIATED PIPING, INLINE DEVICES, HANGERS AND SUPPORTS.

12. REMOVE THE BOILER PLANT CONTROL AIR COMPRESSOR AND ASSOCIATED HORIZONTAL COMPRESSOR MOUNTED RECEIVER. INCLUDE ALL ASSOCIATED PIPING, INLINE DEVICES, HANGERS AND

SUPPORTS.

13. REMOVE THE FUEL OIL SUPPLY AND RETURN PIPING FROM THE 2.5" X 1.5" UNIONS AT THE ENTRANCE TO BUILDING 10, AS INDICATED, TO THE CONNECTIONS TO EACH BOILER. INCLUDE

THE ASSOCIATED FUEL OIL PUMPS, STRAINERS, VALVES, INLINE DEVICES, HANGERS AND SUPPORTS.

14. REMOVE THREE 600 BOILER HORSEPOWER WATER TUBE BOILERS AND ASSOCIATED STEAM, CONDENSATE, RELIEF, DRAIN, BLOWDOWN, BLOW-OFF, FEED WATER, GAS AND OIL PIPING, INLINE

DEVICES, INSULATION, HANGERS AND SUPPORTS. INCLUDE ASSOCIATED CONCRETE PADS.

15. REMOVE TOILET EXHAUST FAN, SUPPORTS AND ALL ASSOCIATED WIRING & CONTROL DEVICES.

16. REMOVE 12X10 EXHAUST DUCTWORK, AIR DEVICES AND DUCT SUPPORTS.

17. REMOVE EXHAUST LOUVER AND TEMPORARILY PATCH WALL PENETRATION UNTIL NEW CONSTRUCTION PHASE.

SHEET KEYNOTES

Revisions: Date:

8 9

B

C

D

C.2

B.311 11 11

7 7

9 10

2 13

2 13

2 13

6 7 8

CHILLER PLANT

WALKABLE CEILING

TOOL ROOM

BOLILER ROOM

MID-LEVEL

MEZZANINE

STORAGE

WALKABLE CEILING OFFICE CEILING

WATER

SOFTENER

ROOM

BUILDING 10

DN

UP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

/2

/2

:0

:2

P

M

MD102

MECHANICAL DEMOLITION PLAN - 8'-0" TO

22'-0" AFF OF BOILER ROOM

LEBANON BOILER PLANT

RENOVATION

1700 S. LINCOLN AVE.

LEBANON, PA 17024

595-13-101

2021-03-26 JJM JJP0499-0106

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"

1 MECHANICAL DEMOLITION PLAN - 8'-0" TO 22'-0" AFF OF BOILER ROOM

1. REMOVE THE 10"HPS FEEDING THE SITE BUILDINGS FROM THE STEAM HEADER TO THE PRESSURE REDUCING STATION AND FROM THE PRESSURE REDUCING STATION

TO AND INCLUDING THE FIRST FITTING INSIDE THE WALL OF BUILDING 10. REMOVE ASSOCIATED VALVES, TRAPS AND CONDENSATE AND RELIEF PIPING. INCLUDE ALL

ASSOCIATED INSULATION, HANGERS, AND SUPPORTS. PROVIDE NEW 10" HPS SPOOL PIECE, DRIP LEG AND STEAM TRAP FOR CONNECTION OF TEMPORARY AND NEW

STEAM PIPING.

2. REMOVE THE 6" HPS PIPING FROM EACH BOILER OUTLET TO THE STEAM HEADER. INCLUDE ASSOCIATED VALVES, DRAINS, TRAPS, INLINE DEVICES, INSULATION, HANGERS AND SUPPORTS.

3. REMOVE THE 10" HPS HEADER AND ASSOCIATED STEAM AND CONDENSATE PIPING, TRAPS, VALVES, INLINE DEVICES, INSULATION, HANGERS AND SUPPORTS. REMOVE

THE PRESSURE SENSING CONTROL LINES FROM THE STEAM HEADER AND THE ASSOCIATED VALVES AND DRAINS.

4. REMOVE THE 10" HPS PIPING FROM THE STEAM HEADER TO THE PRESSURE REDUCING STATION ON THE MEZZANINE IN ITS ENTIRETY. INCLUDE ALL INLINE DEVICES, VALVES, RELIEF PIPING, TRAPS, DRAINS, INSULATION, HANGERS AND SUPPORTS.

5. REMOVE THE SAFETY VALVES AND THE ASSOCIATED VENT PIPING FROM EACH OF THE BOILER SAFETY VALVES, THROUGH THE ROOF. REMOVE THE DRIP PAN ELBOWS

AND ASSOCIATED DRAIN PIPING. INCLUDE ASSOCIATED HANGERS AND SUPPORTS.

6. REMOVE THE PRESSURE REDUCING STATION SERVING THE DEAERATOR AND ITS ASSOCIATED PIPING, SAFETY VALVE, ISOLATION VALVES, BY-PASS VALVE, STEAM

TRAPS, STRAINERS AND CONDENSATE PIPING. REMOVE THE SAFETY VALVE RELIEF VENT PIPING THROUGH THE ROOF. REMOVE THE LPS BETWEEN THE PRV AND THE

DEAERATOR. REMOVE THE ASSOCIATED PIPE INSULATION, HANGERS AND SUPPORTS.

7. REMOVE THE HIGH AND LOW PRESSURE STEAM PIPING AND PRESSURE REDUCING STATIONS SERVING THE BOILER PLANT AND CHILLER PLANT UNIT HEATERS &

DEAERATORS FROM THE STEAM HEADER TO AND INCLUDING THE DEAERATOR AND THE UNIT HEATERS. REMOVE THE ASSOCIATED STEAM TRAPS AND CONDENSATE

PIPING. INCLUDE ALL ASSOCIATED INLINE DEVICES, INSULATION, HANGERS, AND SUPPORTS.

8. REMOVE THE AIR COMPRESSOR AND ASSOCIATED HORIZONTAL COMPRESSOR MOUNTED RECEIVER AND THE ASSOCIATED VERTICAL 476-GALLON RECEIVER. INCLUDE

ALL ASSOCIATED PIPING, INLINE DEVICES, HANGERS AND SUPPORTS.

9. REMOVE THE FUEL OIL SUPPLY AND RETURN PIPING FROM THE 2.5" X 1.5" BUSHINGS AT THE ENTRANCE TO BUILDING 10, AS INDICATED, TO THE CONNECTIONS TO

EACH BOILER. INCLUDE THE ASSOCIATED FUEL OIL PUMPS, STRAINERS, VALVES, INLINE DEVICES, HANGERS AND SUPPORTS.

10. REMOVE THE 6" NATURAL GAS PIPING FROM AND INCLUDING THE ELBOW AT THE TOP OF THE RISER TO EACH OF THE BOILERS. INCLUDE ASSOCIATED VALVES, RELIEF PIPING, HANGERS AND SUPPORTS.

11. REMOVE THE BOILER STACK IN ITS ENTIRETY FOR EACH OF THE BOILERS.

12. REMOVE THE THREE FEED WATER PUMPS AND ASSOCIATED FEED WATER PIPING INCLUDING SUCTION, DISCHARGE, AND RECIRCULATION PIPING AND ASSOCIATED

INSULATION, HANGERS, AND SUPPORTS IN ITS ENTIRETY, FROM THE DEAERATOR TO THE FEED WATER PUMPS AND FROM THE FEED WATER PUMPS TO THE BOILERS.

REMOVE ALL ASSOCIATED INLINE DEVICES INCLUDING ALL VALVES, STRAINERS, FLEX CONNECTORS, GAUGES AND SENSORS. REMOVE THE ASSOCIATED FEEDWATER

PUMP CONCRETE PADS.

13. REMOVE THREE 600 BOILER HORSEPOWER WATER TUBE BOILERS AND ASSOCIATED STEAM, CONDENSATE, RELIEF, DRAIN, BLOWDOWN, BLOW-OFF, FEED WATER, GAS

AND OIL PIPING, INLINE DEVICES, CONTROLS, CONTROL PANELS, INSULATION, HANGERS AND SUPPORTS. INCLUDE ASSOCIATED CONCRETE PADS.

14. REMOVE BOILER PLANT MAKE-UP AIR, AIR HANDLING UNIT AND ASSOCIATED DUCTWORK, PIPING, VALVES, INLINE DEVICES, DAMPERS, CONTROLS, INSULATION, HANGERS AND SUPPORTS. REMOVE DUCTWORK AND OUTSIDE AIR INTAKE WALL LOUVER AND PROVIDE TEMPORARY BLANK OFF PANEL FOR CONNECTION OF FUTURE

LOUVER.

8 9

B

C

D

C.2

B.3

3 3

CHILLER PLANT

BOILER ROOM

UPPER-LEVEL

MEZZANINE

ABANDONED

COAL STORAGE

BUILDING 10

UP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

/2

/2

:0

:2

P

M

MD103

MECHANICAL DEMOLITION PLAN - 20'-0" TO

30'-0" AFF OF BOILER ROOM

LEBANON BOILER PLANT

RENOVATION

1700 S. LINCOLN AVE.

LEBANON, PA 17024

595-13-101

2021-03-26 JJM JJP0499-0106

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"

1 MECHANICAL DEMOLITION PLAN - 20'-0" TO 30'-0" AFF OF BOILER ROOM

1. REMOVE THE 6" HPS PIPING FROM EACH BOILER OUTLET TO THE STEAM HEADER. INCLUDE ASSOCIATED VALVES, DRAINS, TRAPS, INLINE DEVICES, INSULATION, HANGERS AND SUPPORTS.

2. REMOVE THE SAFETY VALVES AND THE ASSOCIATED VENT PIPING FROM EACH OF THE BOILER SAFETY VALVES, THROUGH THE ROOF. REMOVE THE DRIP PAN ELBOWS

AND ASSOCIATED DRAIN PIPING. INCLUDE ASSOCIATED HANGERS AND SUPPORTS.

3. REMOVE THE BOILER STACK IN ITS ENTIRETY FROM EACH OF THE BOILERS.

4. REMOVE THE 10" HPS PIPING FROM THE STEAM HEADER TO THE PRESSURE REDUCING STATION ON THE MEZZANINE IN ITS ENTIRETY. INCLUDE ALL INLINE DEVICES, VALVES, RELIEF PIPING, TRAPS, DRAINS, INSULATION, HANGERS AND SUPPORTS.

5. REMOVE THE THREE FEED WATER PUMPS AND ASSOCIATED FEED WATER PIPING INCLUDING SUCTION, DISCHARGE, AND RECIRCULATION PIPING AND ASSOCIATED

INSULATION, HANGERS, AND SUPPORTS IN ITS ENTIRETY, FROM THE DEAERATOR TO THE FEED WATER PUMPS AND FROM THE FEED WATER PUMPS TO THE BOILERS.

REMOVE ALL ASSOCIATED INLINE DEVICES INCLUDING ALL VALVES, STRAINERS, FLEX CONNECTORS, GAUGES AND SENSORS. REMOVE THE ASSOCIATED FEEDWATER

PUMP CONCRETE PADS.

6. REMOVE THE DEAERATOR AND ASSOCIATED PIPING, INCLUDING HIGH PRESSURE STEAM, LOW PRESSURE STEAM, PUMPED CONDENSATE, SOFTENED WATER, CHEMICAL

FEED, RECIRCULATION, OVERFLOW, DRAIN, SAMPLE, AND VENT PIPING AND ASSOCIATED INSULATION, HANGERS AND SUPPORTS IN ITS ENTIRETY, FROM THE DEAERATOR

TO THE STEAM HEADER, AND TO THE CONDENSATE TRANSFER PUMPS, FEED WATER PUMPS, SAFETY VALVES, AND THROUGH THE ROOF. REMOVE ALL ASSOCIATED

INLINE DEVICES INCLUDING ALL VALVES, STRAINERS, GAUGES AND SENSORS.

7. REMOVE THE 6" NATURAL GAS PIPING FROM AND INCLUDING THE ELBOW AT THE TOP OF THE RISER TO EACH OF THE BOILERS. INCLUDE ASSOCIATED VALVES, RELIEF PIPING, HANGERS AND SUPPORTS.

8. REMOVE 1" VENT LINE FROM DEARATOR TERMINATING THRU WINDOW. REMOVE PLUG-IN EXHAUST FAN. (NO NEED TO SEAL, THE WINDOW IS BEING REMOVED FOR THE

NEW DOOR.)

8 9

B

C

D

C.2

B.3333

5 5 5

(E)VENTILATOR

(E)EXHAUST FAN

BUILDING 10

(D)EXHAUST FAN

ABANDONED

COAL STORAGE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

/2

/2

:0

:3

P

M

MD104

MECHANICAL DEMOLITION ROOF PLAN LEBANON BOILER PLANT

RENOVATION

1700 S. LINCOLN AVE.

LEBANON, PA 17024

595-13-101

2021-03-26 JJM JJP0499-0106

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"

1 MECHANICAL DEMOLITION ROOF PLAN

1. ROOFING SYSTEM CONSISTS OF TAPERED INSULATION, PROTECTION COURSE, AND ROOFING SYSTEM. VERIFY MATERIALS, SYSTEMS, AND THICKNESSES IN FIELD. OBTAIN

MANUFACTURER AND WARRANTY INFORMATION FROM COR. ALL REPAIRS AND MODIFICATIONS SHALL PER ROOFING MANUFACTURER AND MAINTAIN THE WARRANTY.

GENERAL NOTES

1. REMOVE THE SAFETY VALVES AND THE ASSOCIATED VENT PIPING FROM EACH OF THE BOILER SAFETY VALVES, THROUGH THE ROOF. REMOVE THE DRIP PAN

ELBOWS AND ASSOCIATED DRAIN PIPING.

2. REMOVE VENT PIPING THROUGH THE ROOF FROM THE DEAERATOR, CONDENSATE SURGE TANK, FLASH TANK, SAFETY VALVES ETC. PATCH THE ROOF

PENETRATION WITH MATERIAL SIMILAR TO EXISTING ROOF AS APPROVED, TO MAINTAIN THE ROOFING WARRANTY.

3. REMOVE THE BOILER STACK & ROOF CURB IN ITS ENTIRETY FROM EACH OF THE BOILERS. PROVIDE TEMPORARY CAP AS REQUIRED TO MAINTAIN WEATHER

TIGHT ROOF OPENING.

4. REMOVE 6" HPS PIPING THROUGH ROOF TO AND INCLUDING SILENCER AND STACK. INCLUDE ASSOCIATED GUY WIRES AND SUPPORTS. CAP ROOF CURB

WEATHER TIGHT.

5. REMOVE EXHAUST FAN, ROOF CURB AND ASSOCIATED DEVICES AND CONTROLS. PROVIDE TEMPORARY CAP AS REQUIRED TO MAINTAIN WEATHER TIGHT ROOF

OPENING.

8 9

B

C

D

C.2

B.3

18' - 0" 18' - 0" 11' - 3 3/4"

8' - 8 1/4"

5' - 7 1/4"

(E)SUMP

PIT

10-BDS-11

10-CRU-2

10-CRU-1 3

4' - 4"

3' - 7 1/2"

NEW TRENCH FOR

FO & BLOWDOWN PIPING

NEW TRENCH FOR

FO & BLOWDOWN PIPING

BUILDING 10

CHILLER PLANT

TOILET/LOCKER

ROOM

CONTROL ROOM

GENERATOR

ROOM

OFFICE

TOOL ROOM

BOILER ROOM

PUMP ROOM

PUMP PIT

10-HRU-1

10' - 3 1/4"

5' - 4" 2' - 8" 2' - 8"12' - 8" 12' - 8" 11' - 3 3/4"

8' - 7 3/4"5' - 4"

10-FOP-1

7 77777

CATWALK

SUPPORT

LOCATIONS

(TYPICAL)

10-FOP-2

CLCLCL

CL

CL CLCLCL CL CL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

/2

/2

:0

:4

P

M

MQ101

MECHANICAL EQUIPMENT ARRANGEMENT

LOWER PLAN

LEBANON BOILER PLANT

RENOVATION

1700 S. LINCOLN AVE.

LEBANON, PA 17024

595-13-101

2021-03-26 JJM JJP0499-0106

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"

1 MECHANICAL EQUIPMENT ARRANGEMENT LOWER PLAN

NEW BOILER PLANT EQUIPMENT TABLE

TAG # QUANTITY DESCRIPTION

1 1

2 1

3 2

BLOW DOWN SEPARATOR W/ AFTERCOOLER

CONDENSATE RECEIVER/PUMPS, 110 GALLON RECEIVER, 150 GPM PUMPS

FUEL OIL PUMP SKID

4 3

5 1 CENTERLINE OF NEW DEARATOR

CENTERLINE OF NEW BOILERS

6 1 SURFACE BLOWOFF HEAT RECOVERY UNIT

7 6 BOILER SUPPORT STEEL (SEE STRUCTURAL DRAWINGS)

8 1 EMERGENCY GENERATOR EQUIPMENT PAD (SEE STRUCTURAL DRAWINGS)

9 1 EMERGENCY GENERATOR DAY TANK EQUIPMENT PAD (SEE STRUCTURAL DRAWINGS)

B

C

D

C.2

B.3

7' - 2 1/4" 2' - 8" 2' - 8 1/4"

9' - 10"

18' - 0" 18' - 0" 11' - 3 3/4"

(R E F T U B E

P U L L

18' - 0"18' - 0"21' - 7 1/4" 11' - 3 3/4"

10-B-310-B-210-B-1 10-FHX-2 10-FHX-3

10-FHX-1

16' - 5"7' - 4 1/4"5' - 2 1/4"

12' - 4"

10-D/A-1

10-FWP-1

10-FWP-2

10-FWP-3

(BELOW D/A)

(BELOW D/A)

(BELOW D/A)

10-CS-1

1 12 2 1

10-STS-1 8

BUILDING 10

CHILLER PLANT

TOILET/LOCKER

ROOM

CONTROL ROOM

GENERATOR

ROOM

OFFICE

TOOL ROOM

BOILER ROOM

MID-LEVEL

MEZZANINE

STORAGE STORAGE

UP

DN

7(2)

BELOW

CONDENSATE TANK

(R E F T U B E

P U L L

(R E F T U B E

P U L L

10-UH-410-UH-310-UH-2

10-UH-1

10-UH-8

10-UH-7 10-UH-6 10-UH-5

5 5 5

15'-0" AFF

TYP OF 8

NEW SAMPLE

COOLERS

BOILER MASTER

CONTROL PANEL

10-FOP-1

10-G-1

10-DT-1

1' - 6"

2' - 9"

CLCLCL

CL

10-CS-1

CONTROL PANEL

10-FOP-1

10-UH-9

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

/2

/2

:0

:5

P

M

MQ102

MECHANICAL EQUIPMENT ARRANGEMENT

UPPER PLAN

LEBANON BOILER PLANT

RENOVATION

1700 S. LINCOLN AVE.

LEBANON, PA 17024

595-13-101

2021-03-26 JJM JJP0499-0106

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"

1 MECHANICAL EQUIPMENT ARRANGEMENT UPPER PLAN

NEW BOILER PLANT EQUIPMENT TABLE

TAG # QUANTITY DESCRIPTION

1 3

700 HP TWO-PASS WET-BACK FIRE TUBE STEAM BOILER. 2-PASS W/

NATURAL GAS/NO. 2 FUEL OIL FIRED.

2 3 BOILER FEEDWATER HEAT EXCHANGER (ECONOMIZER)

3 1 VERTICAL TRAY DEARATOR - 2000 GALLON TANK CAPACITY,

4 1 BOILER FEEDWATER PUMPS, VERTICAL

6 1 CONDENSATE STORAGE TANK - 2200 GALLONS

7 2 CONDENSATE TRANSFER PUMPS

8 1 STEAM TEST SILENCER

5 8 UNIT HEATER

9 1 FUEL OIL PUMP SKID

10 1 EMERGENCY GENERATOR (SEE ELECTRICAL DRAWINGS)

11 1 EMERGENCY GENERATOR DAY TANK

8 9

B

C

D

C.2

B.3

MP302

MP301

(E)INCOMING FO SERVICE

FROM 61"x14" PIT

SEE MP102 FOR CONT.

TYP 6

1-1/2" FOS/R

IN TRENCH

TYP

MAXON AUTOMATED

SHUT-OFF VALVE

10-BDS-1

10-D/A-1

10-B-1 10-B-2 10-B-3

FO & BLOWDOWN PIPING

IN NEW TRENCH.

SEE STRUCTURAL DWGS.

6" HPR TAP

FOR TEMPORARY/FUTURE

CONDENSATE RECIEVER

10-CRU-2

10-CRU-1

6" HPR

1" FOS

1" FOR

1" FOS

1" FOR1" FOS

1" FOR

6" LPR

6"Ø HPR RISE

2" BD 2" BD

2" BD

(E)SUMP PIT

6" BD

2" BD2" BD

3" OFL DN

TO FLOOR DRAIN

4" OFL DN

TO TRENCH

FROM D/A

4" OFL

4" OFL

4" OFL DN TO

10-CRU-1 & 2

6" BD

DISCHARGE

TO SUMP

10" HPS DROP

FROM PRV

3" SOFTENED WATER

(SEE PLUMBING PLANS

FOR CONT.)

3" DOMESTIC WATER

(SEE PLUMBING DRAWINGS

FOR CONT.)

3" DOMESTIC WATER

(SEE MP102 FOR CONT.)

6" BDS VENT

(SEE MP102 FOR CONT.)

3" SW & 3" CW

(SEE MP102

FOR CONT.)

10" HPS CONNECT TO

EXISTING HPS IN TUNNEL

4" HPR CONNECT TO

EXISTING HPR IN TUNNEL

TYP 3

4" HPS CONNECT TO

EXISTING HPS IN TUNNELCHILLER PLANT

TOILET/LOCKER

ROOM

CONTROL ROOM

GENERATOR

ROOM

OFFICE

TOOL ROOM

BOILER ROOM

PUMP ROOM

PUMP PIT

DN

BUILDING 10

(E)STEAM TUNNEL

3" LPR

(TYP)

1" DRAIN ROUTE TO

NEAREST FLOOR DRAIN

10-HRU-1

2-1/2" FLASH STEAM VENT

FROM 10-HRU-1 UP

THRU ROOF

2 1/2" SV

1-1/2" SBO

(SEE MP102

FOR CONT.)

10" HPS

1" SAFETY RELIEF VALVE

ROUTE TO NEAREST

FLOOR DRAIN

MP301

MP302

10-FWP-2

10-FWP-1

10-FWP-3

(BELOW D/A)

(BELOW D/A)

(BELOW D/A)

1" BD FROM

BOILER

2" BD FROM

BOILER

2" BD FROM

BOILER

2" BD FROM

BOILER

2" BD FROM

BOILER

2" BD FROM

BOILER

2" HPS RISE

(TO BOILER ROOM

UNIT HEATERS)

PIPE HANGER

TYPICAL

10-FOP-1

1 1/2" FOS

1 1/2" FOR

1 1/2" SW

1 1/2" SW

EMERGENCY

GENERATOR CURB

(SEE STRUCTURAL

DRAWINGS)

FUEL OIL DAY

TANK CURB

(SEE STRUCTURAL

DRAWINGS)

10-FOP-2

CARBON MONOXIDE SENSOR

MOUNT 4'-0" AFF

CO

CARBON MONOXIDE SENSOR

MOUNT 4'-0" AFF

CO

CARBON MONOXIDE SENSOR

MOUNT 4'-0" AFF

CO

CARBON MONOXIDE SENSOR

(MOUNT 4'-0" AFF)

PROPANE SENSOR

(MOUNT 18" AFF)

CO

P

CO

P

CARBON MONOXIDE SENSOR

(MOUNT 3'-0" ABOVE

PUMP PIT FLOOR)

PROPANE SENSOR

(MOUNT 3'-0" ABOVE

PUMP PIT FLOOR)

CO

CARBON MONOXIDE SENSOR

(MOUNT 1'-6" AFF)

T

10-UH-7

T

10-UH-6

T

10-UH-8

T

10-UH-5

T

10-UH-2

T

10-UH-3

T

10-UH-4

T

10-UH-1

8765432 9

VOID-For Temp Plots

4 53

3' - 6"

10-CFT-01

CHEMICAL FEED

TANKS

CHEMICAL TESTING

SINK LOCATION

EMERGENCY

EYEWASH/SHOWER

LOCATION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

/8

/2

:4

:0

P M

MP101

MECHANICAL NEW WORK FLOOR/TRENCH

LEVEL PLAN

LEBANON BOILER PLANT

RENOVATION

1700 S. LINCOLN AVE. LEBANON, PA 17024

595-13-101

2021-03-26 JJM JJP0499-0106

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"

1 MECHANICAL NEW WORK FLOOR/TRENCH LEVEL PLAN

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.

3. REFER TO DRAWINGS MP701 AND MP702 FOR EQUIPMENT SCHEDULES.

GENERAL NOTES

1. REFER TO STRUCTURAL DRAWINGS FOR PIPING RESTRAINT.

2. SEE STRUCTURAL FOR PIPE GUARD.

3. LOCATE UNIT HEATER THERMOSTAT 4'-6" AFF. FAN SHALL CYCLE TO MAINTAIN A SETPOINT OF

50°F.

4. 4" D/A OVERFLOW TO DUPLEX CONDENSATE PUMPS 10-CRU-1 & 2.

WORK WITH FLOW DIAGRAMS, DRAWINGS MP601, MP602 & MP603.

5. SEE FLOW DIAGRAM DRAWINGS MP601, MP602 & MP603 FOR D/A AND SURGE TANK SYSTEM

BYPASS PIPING.

SHEET KEYNOTES

Revisions: Date:

1 ADDENDUM NO. 1-ADDED D/A AND SURGE TANK BYPASS PIPING 07/28/21

RFI #1 04/06/22

8 9

B

C

D

C.2

B.3

MP302

MP301

10-B-3 10-B-2

10-B-1

10-CS-1

(N)LOWER CATWALK

ELEV:12'-0" TOG

8" LPS

18' - 2"COP

24" BOILER

STACK

24" BOILER STACK

24" BOILER STACK

10-FHX-310-FHX-2

10-FHX-1

10-D/A-1

10-FWP-2

10-FWP-1

10-FWP-3

(N)CATWALK

ELEV:13'-8" TOG

(BELOW D/A)

(BELOW D/A)

(BELOW D/A)

SV-12

8" HPS UP TO

STEAM HEADER

(SEE MP103

FOR CONT.)

8" HPS DROP

TO BOILER

8" HPS DROP

TO BOILER

8" HPS DROP

TO BOILER

4" NG TO

GAS TRAIN

2-1/2" BFW

TO BOILER

2-1/2" BFW

TO BOILER 4" SV-5 &

SV-6 UP

THRU ROOF4" SV-3 & SV-4

UP THRU ROOF

4" SV-1 & SV-2

UP THRU ROOF

3'X3' OPENING

IN GRATING FOR

ACCESS BELOW

(SEE STRUCTURAL

DRAWINGS)

2-1/2"

TANK BYPASS

10-CTP-1

10-CTP-2

(BELOW COND.

TANK)

8" HPS

DRIP LEGS

W/ STEAM TRAPS

(E)8" NATURAL GAS

SUPPLY

(E)1" LPG

SUPPLY

NEW FO PIPING

CONNECTIONS TO EXISTING

INCOMING FO SERVICE

2" FOS

1-1/2" FOR

CONNECTIONS FOR

TEMPORARY BOILERS

1 1/2" FOR

(E)6" NG MAXON

AUTOMATED

SHUT-OFF VALVE

IN VERTICAL

3" PC TAP THRU WALL

TO TEMPORARY/FUTURE

BOILERS

2 1/2" LPR

6" BDS VENT

UP THRU ROOF

6" BDS VENT

(SEE DWG MP101

FOR CONT.)

1" BD DN

TO TRENCH

1" BD DN

TO TRENCH 2" BD DN

TO TRENCH

2-1/2"

BFW RISE

4" NG DROP

2-1/2" BFW RISE

4" NG DROP 2-1/2" BFW RISE

4" NG DROP

OVERHEAD DOOR

(SEE STRUCTURAL DWGS)

1" BD DN

TO TRENCH

2" BD DN

TO TRENCH

2-1/2"

TANK BYPASS

DRAIN DN TO

(E)SUMP

2" SV FROM

BELOW & UP

THRU ROOF

6" PCR FROM

10-CRU-1 & 2

BELOW

3" OFL DN

TO FLOOR DRAIN

3" OFL

4" OFL DN

TO TRENCH

4" OFL

3" CTPD

3" SW UP

2" BD DN

TO TRENCH

NEW 1" LPG

CONNECTION TO

(E)1" INCOMING LPG

3/4" LPG DROP

TO GAS TRAIN

3/4" LPG DROP

TO GAS TRAIN

3/4" LPG DROP

TO GAS TRAIN

10-CS-1

CONTROL PANEL

3" SW

(SEE MP101

FOR CONT.)

3" SW & 3" CW

(SEE MP101 FOR CONT.)

10" HPS THRU WALL FOR

TEMPORARY/FUTURE

CONNECTION

3" CTPD UP

CHILLER PLANT

CONTROL ROOM

GENERATOR

ROOM

OFFICE

BOILER ROOM

MID-LEVEL

MEZZANINE

COND. TANK

ROOM

TOOL ROOM

STORAGE STORAGE

DN

UP

BUILDING 10

8" HPS UP TO

STEAM HEADER

(SEE MP103

FOR CONT.)

4" SV UP

THRU ROOF

10-UH-1

10-UH-2 10-UH-3

10-UH-4

10-UH-5

10-UH-610-UH-7

10-UH-8 1-1/2" SBO

(SEE MP101 FOR CONT.)

(2)SAMPLE COOLERS

FOR BOILERS 1,2&3 AND DEARATOR

(COORDINATE LOCATION WITH SINK,

SEE PLUMBING DWGS)

2" FOS

MP301

MP302

2-1/2" BFW

TO BOILER

4" NG TO

GAS TRAIN

4" NG TO

GAS TRAIN

2-1/2" FLASH STEAM VENT

FROM 10-HRU-1 UP

THRU ROOF

10-FOP-1

1 1/2" HPR

1-1/2" HPR DN TO

CONDENSATE STORAGE TANK

1-1/2" HPR DROP

1-1/2" HPR DROP

1 1/2" HPR

2" HPS DN TO

10" STEAM MAIN

1 1/2" HPR

1-1/2" HPS RISE

FROM BELOW CATWALK

1-1/2" HPS DROP

BELOW CATWALK

1 1/2" HPS

3/4" HPS3/4" HPR

1" HPR

1" HPS

3/4" HPR

3/4" HPS

1 1/2" HPS

1 1/2" HPR

8" HPS

DRIP LEGS

W/ STEAM TRAPS

3/4" HPR

3/4" HPS

3/4" HPR

3/4" HPS

1" HPS1" HPR 1 1/2" HPS

1 1/2" HPR

2" HPS

PIPE HANGER

TYPICAL

2-1/2" EMERGENCY MAKE-UP WATER

(SEE PLUMBING PLANS FOR CONT.)

2-1/2" EMERGENCY MAKE-UP

WATER TO 10-CS-1

8" SV-11

FROM DEARATOR

8" LPS

4" OFL

8" LPS UP

TO PRV-1

PRV-2 & PRV-3

BOILER MASTER

CONTROL PANEL

10-G-1

E

LE

C T R

IC

A L

P A N E

LS

10-DT-1

S E E

S H E E T G C

F O R

C O N

TI

N U A T

IO

N

40x96 OA DN FROM

MEZZANINE

W/ WIRE MESH

BIRD SCREEN

96x30 RADIATOR

EXHAUST LOUVER

3/4" FOS & FOR

FROM MEZZANINE

1" FOR

3/4" FOS

3/4" FOS

1" FOR

DO TO 10-G-1

10-FOP-2

10-UH-9

8x8 EA UP

THRU CEILING

TOILET/LOCKER

ROOM

EG-1

230 CFM

EG-1

230 CFM

(2)3" EMERGENCY VENTS

& 2" NORMAL VENT

UP THRU MEZZANINE & ROOF

8" GENERATOR

EXHAUST UP TO

MEZZANINE

GAS DETECTION

CONTROLLOR

T

10-UH-9

T

10-EF-4

8765432 9

(BELOW)

VOID-For Temp Plots

6 7

6 7

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

/2

/2

:3

:3

A

M

MP102

MECHANICAL NEW WORK LOWER CATWALK

PLAN

LEBANON BOILER PLANT

RENOVATION

1700 S. LINCOLN AVE. LEBANON, PA 17024

595-13-101

2021-03-26 JJM JJP0499-0106

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"

1 MECHANICAL NEW WORK LOWER CATWALK PLAN

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.

3. REFER TO DRAWINGS MP701 AND MP702 FOR EQUIPMENT SCHEDULES.

GENERAL NOTES

1. 66"W X 42"H GENERATOR RADIATOR EXHAUST LOUVER. RUSKIN MODEL ELM90HFA ADJUSTABLE

LOUVER OR EQUAL WITH 120 VAC ELECTRIC ACTUATOR, FACTORY MOUNTED AND TESTED.

LOUVER AND ACTUATOR SHALL BE DESIGNED TO WITHSTAND THE FORCES OF A 125 MPH

WIND, 40 PSF MINIMUM.

2. THE EMERGENCY GENERATOR RADIATOR EXHAUST DAMPER SHALL OPEN ON A SIGNAL FROM THE

EMERGENCY GENERATOR CONTROL SYSTEM. THE DAMPER SHALL BE OPEN WHEN THE

GENERATOR IS RUNNING AND CLOSED WHEN THE GENERATOR IS OFF.

3. SUPPORT 10-UH-9 FROM STRUCTURAL STEEL. BOTTOM OF UNIT HEATER 8'-0" AFF.

4. LOCATE UNIT HEATER THERMOSTAT 4'-6" AF. UNIT HEATER FAN SHALL CYCLE TO MAINTAIN A

SETPOINT OF 70°F.

5. LOCATE 10-EF-4 THERMOSTAT 4'-6" ABOVE UPPER PUMP ROOM FLOOR. INTERLOCK

10-GRV-5 DAMPER WITH 10-EF-4, THE DAMPER SHALL BE OPEN WHEN EXHAUST FAN IS ON

AND CLOSED WHEN THE EXHAUST FAN IS OFF. EXHAUST FAN SHALL CYCLE TO MAINTAIN A

TEMPERATURE OF 80°F.

6. 4" D/A OVERFLOW TO DUPLEX CONDENSATE PUMPS 10-CRU-1 & 2.

WORK WITH FLOW DIAGRAMS, DRAWINGS MP601, MP602 & MP603.

7. SEE FLOW DIAGRAM DRAWINGS MP601, MP602 & MP603 FOR D/A AND SURGE TANK SYSTEM

BYPASS PIPING.

SHEET KEYNOTES

1 ADDENDUM NO. 1-ADDED D/A AND SURGE TANK BYPASS PIPING 07/28/21

8 9

B

C

D

C.2

B.3

MP302

MP301

(N)UPPER CATWALK

ELEV:19'-0" TOG

8" HPS

29' - 4"COP

8" HPS

29' - 4"COP

8" HPS

29' - 4"COP

24"Ø BOILER STACK

FROM BOILER

PRV-1

TO DEAREATOR

12" HIGH PRESSURE

STEAM HEADER, 115 PSIG

10-D/A-1

24"Ø BOILER STACK

FROM BOILER

24"Ø BOILER STACK

FROM BOILER

8" HPS DROP 8" HPS DROP

3" BFW

3" BFW

3" BFW

3" BFW

DROP

8" LPS DROP

TO D/A

2-1/2" BFW

DROP TO 10-BFT-32-1/2" BFW

DROP TO 10-

BFT-2

2-1/2" BFW

DROP TO 10-BFT-1

10" HPS DROP

TO PRV

3" CTPD DN

8" CTPD DROP

8" CTPD RISE

10-STS-1

18" HPS

(SILENCER DISCHARGE

UP THRU ROOF)

4" SV-1 & SV-2

DN TO BOILER

4" SV-3 & SV-4

DN TO BOILER

4" SV-5 & SV-6

UP THRU ROOF

& DN TO BOILER

10" HPS

24' - 11 1/2"COP

3" CTPD

24' - 0 1/4"COP1-1/2" VENT

UP THRU ROOF

24"Ø BOILER STACK

UP THRU (E) ROOF

PENETRATION

24"Ø BOILER STACK

UP THRU (E) ROOF

PENETRATION 24"Ø BOILER STACK

UP THRU (E) ROOF

PENETRATION

(E)6" NG

6" NG

2" SAFETY VENT

FROM 10-CRU-2

UP THRU ROOF

2" SAFETY VENT

FROM 10-CRU-1

UP THRU ROOF

6" BLOWDOWN

SEPARATOR VENT

UP THRU ROOF

4" NG DROP

TO GAS TRAIN

4" NG DROP

TO GAS TRAIN

4" NG DROP

TO GAS TRAIN

3" SW

3" CTPD

3" SW DROP

3/4" LPG DROP

TO GAS TRAIN

3/4" LPG DROP

TO GAS TRAIN

3/4" LPG DROP

TO GAS TRAIN

1" LPG DROP

1" LPG

1" LPG

3/4" LPG

4" SAFETY VENT

FROM 10-CS-1

UP THRU ROOF

BOILER ROOM

UPPER-LEVEL

MEZZANINE

WALKABLE

CEILING

UP

ABANDONED

COAL STORAGE

BUILDING 10

4" SV-3 & SV-4

UP THRU ROOF

4" SV-1 & SV-2

UP THRU ROOF

3" SW

3" SW

NG FLOWMETER

NG FLOW

CONDITIONER

NG FLOWMETER

NG FLOW

CONDITIONER

NG FLOWMETER

NG FLOW

CONDITIONER

MP301

MP302

10" CAPPED TAP

10" CAPPED TAP

2-1/2" FLASH STEAM VENT

FROM 10-HRU-1 UP

THRU ROOF

PIPE HANGER

TYPICAL

PIPE HANGER

TYPICAL

PIPE HANGER

TYPICAL

SV-10

8" LPS DN

TO DEAERATOR

10" VENT

FROM SV-12

108x44 OA

INTAKE LOUVER

M x

O A

BOD 28" ABOVE MEZZANINE

40x96 OA DN

THRU MEZZANINE

TO GENERATOR ROOM

3/4" FOS & FOR

DN THRU MEZZANINE

TO 10-DT-1

3/4" FOS & FOR

THRU EXTERIOR WALL

TO 10-FOT-1.

SEE GC101 FOR

CONTINUATION

S E E

S H E E T G C

F O R

C O N

TI

N U A T

IO

N

10x10 EA RISE

ALONG WALL

10x10 EA UP

THRU ROOF TO

10-EF-5

(2)3" EMERGENCY VENTS

& 2" NORMAL VENT

UP THRU MEZZANINE & ROOF

12"Ø GENERATOR EXHAUST

UP THRU ROOF

GENERATOR EXHAUST MUFFLER

(HUNG FROM ROOF STRUCTURE)

8"Ø GENERATOR

EXHAUST DN

THRU MEZZANINE

TO 10-G-1

NG NG NGNATURAL GAS SENSOR

(MOUNTED TO BOTTOM OF ROOF

TRUSS ABOVE GAS TRAIN) TYP 3

VDVD

8x8 EA UP

THRU CEILING

8x8 EA UP

THRU CEILING

1 2

T

10-EF-1

10-EF-2

10-EF-3

8765432 9

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

/2

/2

:0

:0

P

M

MP103

MECHANICAL NEW WORK UPPER CATWALK

PLAN

LEBANON BOILER PLANT

RENOVATION

1700 S. LINCOLN AVE.

LEBANON, PA 17024

595-13-101

2021-03-26 JJM JJP0499-0106

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"

1 MECHANICAL NEW WORK UPPER CATWALK PLAN

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.

3. REFER TO DRAWINGS MP701 AND MP702 FOR EQUIPMENT SCHEDULES.

GENERAL NOTES

1. 108"W X 42"H OUTSIDE AIR INTAKE LOUVER. RUSKIN MODEL ELF6375DXD OR EQUAL. 15,000

CFM AT 0.13" W.C. PRESSURE DROP LOUVER SHALL BE DESIGNED TO WITHSTAND THE FORCES

OF A 125 MPH WIND, 40 PSF MINIMUM. INSTALL LOUVER IN WALL OPENING LEFT BY THE

REMOVAL OF THE EXISTING AHU LOUVER LOCATED ABOVE THE MEZZANINE.

2. OUTSIDE AIR INTAKE DAMPER SHALL OPEN ON A SIGNAL FROM THE EMERGENCY GENERATOR

CONTROL SYSTEM. THE DAMPER SHALL BE OPEN WHEN THE GENERATOR IS RUNNING AND BE

CLOSED WHEN THE GENERATOR IS OFF.

3. LOCATE EXHAUST FAN THERMOSTAT 18'-0" AFF. 10-EF-1, 2 & 3 SHALL RUN TO MAINTAIN A

SETPOINT OF 80°F.

8 9

B

C

D

C.2

B.3

MP302

24" BOILER STACK

W/ WEATHER CAP

4" SV-5 & SV-6

4" SV-1 & SV-2

18" HPS

(SILENCER DISCHARGE)

1-1/2" SAFETY VENT

FROM DEAERATOR

6" BLOWDOWN

SEPARATOR VENT

2" SAFETY VENT

FROM 10-CRU-1

2" SAFETY VENT

FROM 10-CRU-2

4" SAFETY VENT

FROM 10-CS-1

(E)VENTILATOR

(E)EXAHUST FAN

BUILDING 10

ROOF CURB

TYP

ROOF CURB

10-GRV-2

10-GRV-410-GRV-3

10-EF-3

ROOF CURB

10-EF-2

ROOF CURB

10-EF-1

4" SV-3 & SV-4

10-GRV-1

2-1/2" FLASH STEAM VENT

FROM 10-HRU-1

ROOF CURB

10-EF-4

10-GRV-5

SV-10

SV-11

10" VENT

FROM SV-12

10-EF-5

(2)3" EMERGENCY VENTS

& 2" NORMAL VENT

12" GENERATOR

EXHAUST

24" BOILER STACK

W/ WEATHER CAP

24" BOILER STACK

W/ WEATHER CAP

8765432 9

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

ACTUAL

NORTH

/2

/2

:0

:1

P

M

MP104

MECHANICAL NEW WORK ROOF PLAN LEBANON BOILER PLANT

RENOVATION

1700 S. LINCOLN AVE.

LEBANON, PA 17024

595-13-101

2021-03-26 JJM JJP0499-0106

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"

1 MECHANICAL NEW WORK ROOF PLAN

1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.

2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.

3. REFER TO DRAWINGS MP701 AND MP702 FOR EQUIPMENT SCHEDULES.

1. ROOFING SYSTEM CONSISTS OF TAPERED INSULATION, PROTECTION COURSE, AND ROOFING

SYSTEM. VERIFY MATERIALS, SYSTEMS, AND THICKNESSES IN FIELD. OBTAIN MANUFACTURER

AND WARRANTY INFORMATION FROM COR. ALL REPAIRS AND MODIFICATIONS SHALL PER

ROOFING MANUFACTURER AND MAINTAIN THE WARRANTY.

GENERAL NOTES

10-B-310-B-210-B-1

8" LPS

10-CS-1

8" HPS

8" HPS8" HPS

Boiler Room 0' - 0"

Roof 33' - 2"

Lower Catwalk 12' - 0"

Upper Catwalk 19' - 0"

Upper Pump Room -6' - 1"

Lower Pump Room -9' - 7"

3" CTPD10-STS-1

10-CTP-2

3" CTPD

10-HRU-1

2" BD 2" BD 2" BD

4" NG

4" NG 4" NG

1 1/2" BD

1 1/2" SW

1 1/2" SW

10" HPS

4" SV

1 1/2" HPS

1 1/2" BD

3" SW

10-UH-8

3" CTPD

1 1/2" HPR

PIPE CURB

SEE DETAIL 3/MP502

(TYPICAL)

10-D/A-1

6" PCR

2-1/2" EMERGENCY

MAKE-UP WATER

8765432 9

Boiler Room 0' - 0"

Lower Catwalk 12' - 0"

Upper Catwalk 19' - 0"

Upper Pump Room -6' - 1"

Lower Pump Room -9' - 7"

10-UH-7 10-UH-6 10-UH-5

8" HPS

8" HPS3" HPS

8" LPS

8" LPS

3" HPS

3" HPS

8" HPS

8" HPS

10" HPS

12" HPS

10" HPS

10" HPS

10" HPS

6" BD

5" HPR4" HPR

4" HPR

(E)SUMP

2 1/2" LPR

3" OFL

4" HPS

10" HPS

PRV-1

6" LPS

TO DEARATOR

WELDED CAP

TYPICAL

SV-10

2" HPS

10" TAP W/

BLIND FLANGE

3" PC VALVE & TAP

FOR TEMPORARY PUMPS

6" HPR

6" BD

EXISTING

PIPE TUNNEL

10" TAP W/

BLIND FLANGE

10-EF-4

PIPE RESTRAINT

SEE STRUCTURAL DWGS

87654 9

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

/2

/2

:0

:2

P

M

MP301

MECHANICAL SECTIONS LEBANON BOILER PLANT

RENOVATION

1700 S. LINCOLN AVE.

LEBANON, PA 17024

595-13-101

2021-03-26 JJM JJP0499-0106

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"

1 MECHANICAL OVERALL BOILER ROOM SECTION

SCALE: 1/4" = 1'-0"

2 MECHANICAL SECTION @ STEAM HEADER & TUNNEL

10-B-2 ø

E A

H P S

10-FHX-2

Boiler Room 0' - 0"

Roof 33' - 2"

Lower Catwalk 12' - 0"

Upper Catwalk 19' - 0"

CENTERLINE OF

12" HEADER

10-UH-3

10-UH-6

10-GRV-410-GRV-2

10-EF-3

4" SV

3" SW

3" CTPD

2 1/2" BFW

6" NG

2 1/2" BFW

3/4" HPS3/4" HPR

4" NG

3/4" LPG

1" BD

1 1/2" FOS

1 1/2" FOR

18" HIGH BOILER STACK CURB

SEE DETAIL 1/MP502

PIPE CURB

SEE DETAIL 3/MP502

3/4" HPS

3/4" HPR

WEATHER CAP

Boiler Room 0' - 0"

Roof 33' - 2"

Lower Catwalk 12' - 0"

Upper Catwalk 19' - 0"

Upper Pump Room -6' - 1"

2" BD

10-BDS-1

3" OFL

3" SW

10" HPS

6" HPS

6" HPS

8" HPS

10" HPS

6" SV

3" CTPD

PRV-2

1 1/2" BD

PRV-3

10" HPS

TO TUNNEL

10" HPS FROM

STEAM HEADER

SV-12

10" SV

1 1/2" HPR

2" HPS

PIPE CURB

SEE DETAIL 3/MP502

NOTE: FOR PRV SUPPORT SEE STRUCTURAL DWGS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

/2

:0

:2

P

M

MP302

MECHANICAL SECTIONS LEBANON BOILER PLANT

RENOVATION

1700 S. LINCOLN AVE.

LEBANON, PA 17024

595-13-101

2021-03-26 JJM JJP0499-0106

BID DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/4" = 1'-0"

1 MECHANICAL SECTION @ BOILER 2

SCALE: 1/4" = 1'-0"

2 MECHANICAL SECTION @ PRV 2 & 3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ENGINEER OF RECORD MILLER-REMICK LLC

PROFESSIONAL ENGINEERCONSULTANT

321 4 5 6 7 8 9 10

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEEER

MR PROJECT NO:

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t

/2

:0

:4

P

M

MP303

MECHANICAL 3D VIEWS LEBANON BOILER PLANT

RENOVATION

1700 S. LINCOLN AVE.

LEBANON, PA 17024

595-13-101

2021-03-26 JJM JJP0499-0106

BID DOCUMENTS

FULLY SPRINKLERED

SCALE:

1 3D BOILER ROOM

SCALE:

2 3D PUMP PIT & SURGE TANK

SCALE:

3 3D DEARATOR

SCALE:

4 3D @ 10-B-1

SCALE:

5 3D LOWER LEVEL/TUNNEL

SCALE:

6 3D PRV-2 & 3

SCALE:

7 3D PRV-1 & STEAM HEADER

NTSNTS

NTS

NTS

NTS

NTS

NTS

MECHANICAL (STEAM GENERATION)

DETAILS - 1

MP501

JJMJJM

LEBANON BOILER

PLANT RENOVATION

NO. DESCRIPTION DATE

B

A

C

D

E

F

1 2 3 4 5 6 87 9

97 8654321

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned Small Business

MR PROJECT NO: 0499-0106

B

A

C

D

E

F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

BID DOCUMENTS

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT 595-13-101

Project Director

2021-03-26

FULLY SPRINKLERED

DETAILS - 2

MP502

JJMJJM

LEBANON BOILER

PLANT RENOVATION

NO. DESCRIPTION DATE

B

A

C

D

E

F

1 2 3 4 5 6 87 9

97 8654321

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned Small Business

MR PROJECT NO: 0499-0106

B

A

C

D

E

F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

BID DOCUMENTS

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT 595-13-101

Project Director

DETAILS - 3

MP503

JJMJJM

LEBANON BOILER

PLANT RENOVATION

NO. DESCRIPTION DATE

B

A

C

D

E

F

1 2 3 4 5 6 87 9

97 8654321

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned Small Business

MR PROJECT NO: 0499-0106

B

A

C

D

E

F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

BID DOCUMENTS

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT 595-13-101

Project Director

MECHANICAL STEAM GENERATION

FLOW DIAGRAM - BOILERS

MP601

JJPJM

LEBANON BOILER

PLANT RENOVATION

NO. DESCRIPTION DATE

B

A

C

D

E

F

1 2 3 4 5 6 87 9

97 8654321

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned Small Business

MR PROJECT NO: 0499-0106

B

A

C

D

E

F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

BID DOCUMENTS

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT 595-13-101

Project Director

NATURAL GAS AND NO. 2 FUEL OIL

FLOW DIAGRAM

MP604

JJPJM

LEBANON BOILER

PLANT RENOVATION

NO. DESCRIPTION DATE

B

A

C

D

E

F

1 2 3 4 5 6 87 9

97 8654321

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned Small Business

MR PROJECT NO: 0499-0106

B

A

C

D

E

F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

BID DOCUMENTS

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT 595-13-101

Project Director

TEMPORARY STEAM BOILER SYSTEM

PHASE 1 (RENTAL & TEMPORARY )

MP605

JJPJM

LEBANON BOILER

PLANT RENOVATION

NO. DESCRIPTION DATE

B

A

C

D

E

F

1 2 3 4 5 6 87 9

97 8654321

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned Small Business

MR PROJECT NO: 0499-0106

B

A

C

D

E

F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

BID DOCUMENTS

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT 595-13-101

Project Director

EMERGENCY GENERATOR FUEL OIL

FLOW DIAGRAM

MP606

RHDJM

LEBANON BOILER

PLANT RENOVATION

NO. DESCRIPTION DATE

B

A

C

D

E

F

1 2 3 4 5 6 87 9

97 8654321

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned Small Business

MR PROJECT NO: 0499-0106

B

A

C

D

E

F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

BID DOCUMENTS

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT 595-13-101

Project Director

2021-03-26

1 ADDENDUM #3 08-10-21

SCHEDULES - 1

MP701

JJMJJM

LEBANON BOILER

PLANT RENOVATION

NO. DESCRIPTION DATE

B

A

C

D

E

F

1 2 3 4 5 6 87 9

97 8654321

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned Small Business

MR PROJECT NO: 0499-0106

B

A

C

D

E

F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

BID DOCUMENTS

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT 595-13-101

Project Director

SCHEDULES - 2

MP702

JJMJJM

LEBANON BOILER

PLANT RENOVATION

NO. DESCRIPTION DATE

B

A

C

D

E

F

1 2 3 4 5 6 87 9

97 8654321

MILLER-REMICK LLC

PROFESSIONAL ENGINEER

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned Small Business

MR PROJECT NO: 0499-0106

B

A

C

D

E

F

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

BID DOCUMENTS

Office of

Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ENGINEER OF RECORDCONSULTANT 595-13-101

Project Director

2021-03-26

1 07/28/2021

2021-03-26 Bid Documents - Drawing PDFs 00_General Information
2021-03-26 Bid Documents - Drawing PDFs 01_Civil
GC101
GC102
2021-03-26 Bid Documents - Drawing PDFs 02_Structural
S-001
S-002
SD101
SD102
SD501
SD502
SF101
SF102
SF103
SF104
SF105
S-501
S-502
S-503
S-504
S-505
S-506
S-507
S-508
2021-03-26 Bid Documents - Drawing PDFs 02a_Fire Protection
FX001
FX101
FX102
2021-03-26 Bid Documents - Drawing PDFs 03_Plumbing
P-001
PD101
PD102
PD103
PD104
PP101
PP102
PP103
PP104
PP105
P-601
P-701
2021-03-26 Bid Documents - Drawing PDFs 03a_Life Safety
2021-03-26 Bid Documents - Drawing PDFs 04_Mechanical
M-001
M-001
MD101
M-001
MD102
M-001
MD103
M-001
MD104
M-001
M-001
M-001
M-001
M-001
M-001
M-001
M-001
M-001
M-001
M-001
M-001
M-001
M-001
M-001
M-001
M-001
M-001
M-001
M-001
2021-03-26 Bid Documents - Drawing PDFs 05_Electrical
E-001
E-002
ED101
EL101
EP101
EP102
EP111
E-501
E-601
E-701
E-001
E-002
ED101
EL101
EP101
EP102
EP111
E-501
E-601
E-701
E-001
E-002
ED101
EL101
EP101
EP102
EP111
E-501
E-601
E-701
E-001
E-002
ED101
EL101
EP101
EP102
EP111
E-501
E-601
E-701
E-001
E-002
ED101
EL101
EP101
EP102
EP111
E-501
E-601
E-701
E-001
E-002
ED101
EL101
EP101
EP102
EP111
E-501
E-601
E-701
E-001
E-002
ED101
EL101
EP101
EP102
EP111
E-501
E-601
E-701
E-001
E-002
ED101
EL101
EP101
EP102
EP111
E-501
E-601
E-701
E-001
E-002
ED101
EL101
EP101
EP102
EP111
E-501
E-601
E-701
E-001
E-002
ED101
EL101
EP101
EP102
EP111
E-501
E-601
E-701