2021-03-26 Bid Documents - Drawing PDFs 04_Mechanical_.pdf
PDF 44 MB Posted
- Solicitation number
- 36C24423R0002
About this file
This document provides details for a federal contract solicitation to renovate a boiler plant. The solicitation number is 36C24423R0002 and is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4 for the Z1NB--595-13-101 Renovate Boiler Plant Project# 595-13-101. The description indicates the solicitation is for a boiler plant renovation project numbered 595-13-101. No other details are provided on products or services required, response dates, pricing terms, or other salient information.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6 7
A
8 9
B
C
D
C.2
B.310
14 14 14
CHILLER PLANT
TOILET/LOCKER
ROOM
CONTROL ROOM
GENERATOR
ROOM
OFFICE
TOOL ROOM
BOILER ROOM
FD FD FD
FD
FD
PUMP ROOM
PUMP PIT
EXISTING PAD TO BE REMOVED
SEE STRUCTURAL DRAWINGS
(E)SINK CABINET
SEE PLUMBING DWGS
(E)SAFETY SHOWER
SEE PLUMBING DWGS
(E)STEAM TUNNEL
BUILDING 10
UP
DN
12X10 EA
12X10 EA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t o n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t th re e in c h o n e fo o t
PLAN
NORTH
ACTUAL
NORTH
/2
/2
:0
:0
P
M
MD101
MECHANICAL DEMOLITION PLAN - 0'-0" TO 8'-0"
AFF OF BOILER ROOM
LEBANON BOILER PLANT
RENOVATION
1700 S. LINCOLN AVE.
LEBANON, PA 17024
595-13-101
2021-03-26 JJM JJP0499-0106
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"
1 MECHANICAL DEMOLITION PLAN - 0'-0" TO 8'-0" AFF OF BOILER ROOM
1. REMOVE THE THREE FEED WATER PUMPS AND ASSOCIATED FEED WATER PIPING INCLUDING SUCTION, DISCHARGE, AND RECIRCULATION PIPING AND ASSOCIATED INSULATION, HANGERS, AND
SUPPORTS IN ITS ENTIRETY, FROM THE DEAERATOR TO THE FEED WATER PUMPS AND FROM THE FEED WATER PUMPS TO THE BOILERS. REMOVE ALL ASSOCIATED INLINE DEVICES
INCLUDING ALL VALVES, STRAINERS, FLEX CONNECTORS, GAUGES AND SENSORS. REMOVE THE ASSOCIATED FEEDWATER PUMP CONCRETE PADS.
2. REMOVE THE THREE CONDENSATE TRANSFER PUMPS AND ASSOCIATED CONDENSATE TRANSFER PIPING INCLUDING SUCTION, DISCHARGE, AND RECIRCULATION PIPING AND ASSOCIATED
INSULATION, HANGERS, AND SUPPORTS IN ITS ENTIRETY, FROM THE SURGE TANK TO THE TRANSFER PUMPS AND FROM THE TRANSFER PUMPS TO THE DEAERATOR. REMOVE ALL
ASSOCIATED INLINE DEVICES INCLUDING ALL VALVES, STRAINERS, FLEX CONNECTORS, GAUGES AND SENSORS. REMOVE THE ASSOCIATED TRANSFER PUMP CONCRETE PADS.
3. REMOVE CONDENSATE SURGE TANK AND ASSOCIATED PIPING, INCLUDING HIGH PRESSURE CONDENSATE, LOW PRESSURE CONDENSATE, PUMPED CONDENSATE, SOFTENED WATER, COLD
WATER, CHEMICAL FEED, RECIRCULATION, OVERFLOW, DRAIN, SAMPLE, AND VENT PIPING THROUGH THE ROOF, AND ASSOCIATED PIPE INSULATION, HANGERS AND SUPPORTS IN ITS
ENTIRETY. REMOVE ALL ASSOCIATED INLINE DEVICES INCLUDING ALL VALVES, STRAINERS, GAUGES AND SENSORS.
4. REMOVE THE BLOW DOWN TANK AND ASSOCIATED FLASH TANK, RECIRC TANK, AND PLATE AND FRAME HEAT EXCHANGER. REMOVE ALL ASSOCIATED BOTTOM BLOW DOWN AND SURFACE
BLOW DOWN PIPING, VENT, FLASH STEAM, CONDENSATE, DRAIN, AND COLD WATER PIPING FROM THE BOILERS TO THE FLASH TANK AND BLOW DOWN TANK. REMOVE ALL ASSOCIATED
PIPING BETWEEN THE FLASH TANK AND BLOW DOWN TANK AND THE DEAERATOR AND THE CONDENSATE SURGE TANK. REMOVE ALL INLINE DEVICES INCLUDING ALL ASSOCIATED PUMPS, VALVES, STRAINERS, TRAPS, GAUGES AND SENSORS.
5. REMOVE THE 10"HPS FEEDING THE SITE BUILDINGS FROM THE STEAM HEADER TO THE PRESSURE REDUCING STATION AND FROM THE PRESSURE REDUCING STATION TO AND INCLUDING THE
FIRST FITTING INSIDE THE WALL OF BUILDING 10. REMOVE ASSOCIATED STEAM TRAPS AND CONDENSATE PIPING. INCLUDE ALL ASSOCIATED INSULATION, HANGERS, AND SUPPORTS.
PROVIDE NEW 10" HPS SPOOL PIECE, DRIP LEG AND STEAM TRAP FOR CONNECTION OF TEMPORARY AND NEW STEAM PIPING.
6. REMOVE THE 4"HPS FEEDING THE LAUNDRY BUILDING FROM THE STEAM HEADER TO AND INCLUDING THE FIRST FITTING INSIDE THE WALL OF BUILDING 10. REMOVE ASSOCIATED STEAM
TRAPS AND CONDENSATE PIPING. INCLUDE ALL ASSOCIATED INSULATION, HANGERS, AND SUPPORTS. PROVIDE NEW 4" HPS SPOOL PIECE, DRIP LEG AND STEAM TRAP FOR CONNECTION
OF TEMPORARY AND NEW STEAM PIPING.
7. REMOVE THE 4" DR, 5" VR, AND 4"PR RETURN PIPING FROM, AND INCLUDING, THE FIRST FITTING INSIDE THE WALL OF BUILDING 10 TO THE CONDENSATE SURGE TANK. INCLUDE ALL
ASSOCIATED FLEXIBLE EXPANSION LOOPS, CONDENSATE LIFT PUMPS, INSULATION, HANGERS, AND SUPPORTS. PROVIDE NEW 2" HPC SPOOL PIECE FOR CONNECTION OF TEMPORARY AND
NEW CONDENSATE PIPING.
8. REMOVE THE TWO INLINE CONDENSATE RETURN PUMPS (LOCATED BELOW GRATING) AND ASSOCIATED SUCTION AND DISCHARGE PIPING, INSULATION, VALVES, HANGERS AND SUPPORTS.
9. REMOVE THE BOILER CHEMICAL FEED SYSTEM IN ITS ENTIRETY, INCLUDING ALL ASSOCIATED PUMPS, PIPING VALVES, AND INLINE DEVICES, HANGERS AND SUPPORTS.
10. REMOVE THE BOILER STACK IN ITS ENTIRETY FROM EACH OF THE BOILERS.
11. REMOVE THE AIR COMPRESSOR AND ASSOCIATED HORIZONTAL COMPRESSOR MOUNTED RECEIVER AND THE ASSOCIATED VERTICAL 476-GALLON RECEIVER. INCLUDE ALL ASSOCIATED PIPING, INLINE DEVICES, HANGERS AND SUPPORTS.
12. REMOVE THE BOILER PLANT CONTROL AIR COMPRESSOR AND ASSOCIATED HORIZONTAL COMPRESSOR MOUNTED RECEIVER. INCLUDE ALL ASSOCIATED PIPING, INLINE DEVICES, HANGERS AND
SUPPORTS.
13. REMOVE THE FUEL OIL SUPPLY AND RETURN PIPING FROM THE 2.5" X 1.5" UNIONS AT THE ENTRANCE TO BUILDING 10, AS INDICATED, TO THE CONNECTIONS TO EACH BOILER. INCLUDE
THE ASSOCIATED FUEL OIL PUMPS, STRAINERS, VALVES, INLINE DEVICES, HANGERS AND SUPPORTS.
14. REMOVE THREE 600 BOILER HORSEPOWER WATER TUBE BOILERS AND ASSOCIATED STEAM, CONDENSATE, RELIEF, DRAIN, BLOWDOWN, BLOW-OFF, FEED WATER, GAS AND OIL PIPING, INLINE
DEVICES, INSULATION, HANGERS AND SUPPORTS. INCLUDE ASSOCIATED CONCRETE PADS.
15. REMOVE TOILET EXHAUST FAN, SUPPORTS AND ALL ASSOCIATED WIRING & CONTROL DEVICES.
16. REMOVE 12X10 EXHAUST DUCTWORK, AIR DEVICES AND DUCT SUPPORTS.
17. REMOVE EXHAUST LOUVER AND TEMPORARILY PATCH WALL PENETRATION UNTIL NEW CONSTRUCTION PHASE.
SHEET KEYNOTES
Revisions: Date:
8 9
B
C
D
C.2
B.311 11 11
7 7
9 10
2 13
2 13
2 13
6 7 8
CHILLER PLANT
WALKABLE CEILING
TOOL ROOM
BOLILER ROOM
MID-LEVEL
MEZZANINE
STORAGE
WALKABLE CEILING OFFICE CEILING
WATER
SOFTENER
ROOM
BUILDING 10
DN
UP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
ACTUAL
NORTH
/2
/2
:0
:2
P
M
MD102
MECHANICAL DEMOLITION PLAN - 8'-0" TO
22'-0" AFF OF BOILER ROOM
LEBANON BOILER PLANT
RENOVATION
1700 S. LINCOLN AVE.
LEBANON, PA 17024
595-13-101
2021-03-26 JJM JJP0499-0106
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"
1 MECHANICAL DEMOLITION PLAN - 8'-0" TO 22'-0" AFF OF BOILER ROOM
1. REMOVE THE 10"HPS FEEDING THE SITE BUILDINGS FROM THE STEAM HEADER TO THE PRESSURE REDUCING STATION AND FROM THE PRESSURE REDUCING STATION
TO AND INCLUDING THE FIRST FITTING INSIDE THE WALL OF BUILDING 10. REMOVE ASSOCIATED VALVES, TRAPS AND CONDENSATE AND RELIEF PIPING. INCLUDE ALL
ASSOCIATED INSULATION, HANGERS, AND SUPPORTS. PROVIDE NEW 10" HPS SPOOL PIECE, DRIP LEG AND STEAM TRAP FOR CONNECTION OF TEMPORARY AND NEW
STEAM PIPING.
2. REMOVE THE 6" HPS PIPING FROM EACH BOILER OUTLET TO THE STEAM HEADER. INCLUDE ASSOCIATED VALVES, DRAINS, TRAPS, INLINE DEVICES, INSULATION, HANGERS AND SUPPORTS.
3. REMOVE THE 10" HPS HEADER AND ASSOCIATED STEAM AND CONDENSATE PIPING, TRAPS, VALVES, INLINE DEVICES, INSULATION, HANGERS AND SUPPORTS. REMOVE
THE PRESSURE SENSING CONTROL LINES FROM THE STEAM HEADER AND THE ASSOCIATED VALVES AND DRAINS.
4. REMOVE THE 10" HPS PIPING FROM THE STEAM HEADER TO THE PRESSURE REDUCING STATION ON THE MEZZANINE IN ITS ENTIRETY. INCLUDE ALL INLINE DEVICES, VALVES, RELIEF PIPING, TRAPS, DRAINS, INSULATION, HANGERS AND SUPPORTS.
5. REMOVE THE SAFETY VALVES AND THE ASSOCIATED VENT PIPING FROM EACH OF THE BOILER SAFETY VALVES, THROUGH THE ROOF. REMOVE THE DRIP PAN ELBOWS
AND ASSOCIATED DRAIN PIPING. INCLUDE ASSOCIATED HANGERS AND SUPPORTS.
6. REMOVE THE PRESSURE REDUCING STATION SERVING THE DEAERATOR AND ITS ASSOCIATED PIPING, SAFETY VALVE, ISOLATION VALVES, BY-PASS VALVE, STEAM
TRAPS, STRAINERS AND CONDENSATE PIPING. REMOVE THE SAFETY VALVE RELIEF VENT PIPING THROUGH THE ROOF. REMOVE THE LPS BETWEEN THE PRV AND THE
DEAERATOR. REMOVE THE ASSOCIATED PIPE INSULATION, HANGERS AND SUPPORTS.
7. REMOVE THE HIGH AND LOW PRESSURE STEAM PIPING AND PRESSURE REDUCING STATIONS SERVING THE BOILER PLANT AND CHILLER PLANT UNIT HEATERS &
DEAERATORS FROM THE STEAM HEADER TO AND INCLUDING THE DEAERATOR AND THE UNIT HEATERS. REMOVE THE ASSOCIATED STEAM TRAPS AND CONDENSATE
PIPING. INCLUDE ALL ASSOCIATED INLINE DEVICES, INSULATION, HANGERS, AND SUPPORTS.
8. REMOVE THE AIR COMPRESSOR AND ASSOCIATED HORIZONTAL COMPRESSOR MOUNTED RECEIVER AND THE ASSOCIATED VERTICAL 476-GALLON RECEIVER. INCLUDE
ALL ASSOCIATED PIPING, INLINE DEVICES, HANGERS AND SUPPORTS.
9. REMOVE THE FUEL OIL SUPPLY AND RETURN PIPING FROM THE 2.5" X 1.5" BUSHINGS AT THE ENTRANCE TO BUILDING 10, AS INDICATED, TO THE CONNECTIONS TO
EACH BOILER. INCLUDE THE ASSOCIATED FUEL OIL PUMPS, STRAINERS, VALVES, INLINE DEVICES, HANGERS AND SUPPORTS.
10. REMOVE THE 6" NATURAL GAS PIPING FROM AND INCLUDING THE ELBOW AT THE TOP OF THE RISER TO EACH OF THE BOILERS. INCLUDE ASSOCIATED VALVES, RELIEF PIPING, HANGERS AND SUPPORTS.
11. REMOVE THE BOILER STACK IN ITS ENTIRETY FOR EACH OF THE BOILERS.
12. REMOVE THE THREE FEED WATER PUMPS AND ASSOCIATED FEED WATER PIPING INCLUDING SUCTION, DISCHARGE, AND RECIRCULATION PIPING AND ASSOCIATED
INSULATION, HANGERS, AND SUPPORTS IN ITS ENTIRETY, FROM THE DEAERATOR TO THE FEED WATER PUMPS AND FROM THE FEED WATER PUMPS TO THE BOILERS.
REMOVE ALL ASSOCIATED INLINE DEVICES INCLUDING ALL VALVES, STRAINERS, FLEX CONNECTORS, GAUGES AND SENSORS. REMOVE THE ASSOCIATED FEEDWATER
PUMP CONCRETE PADS.
13. REMOVE THREE 600 BOILER HORSEPOWER WATER TUBE BOILERS AND ASSOCIATED STEAM, CONDENSATE, RELIEF, DRAIN, BLOWDOWN, BLOW-OFF, FEED WATER, GAS
AND OIL PIPING, INLINE DEVICES, CONTROLS, CONTROL PANELS, INSULATION, HANGERS AND SUPPORTS. INCLUDE ASSOCIATED CONCRETE PADS.
14. REMOVE BOILER PLANT MAKE-UP AIR, AIR HANDLING UNIT AND ASSOCIATED DUCTWORK, PIPING, VALVES, INLINE DEVICES, DAMPERS, CONTROLS, INSULATION, HANGERS AND SUPPORTS. REMOVE DUCTWORK AND OUTSIDE AIR INTAKE WALL LOUVER AND PROVIDE TEMPORARY BLANK OFF PANEL FOR CONNECTION OF FUTURE
LOUVER.
8 9
B
C
D
C.2
B.3
3 3
CHILLER PLANT
BOILER ROOM
UPPER-LEVEL
MEZZANINE
ABANDONED
COAL STORAGE
BUILDING 10
UP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
ACTUAL
NORTH
/2
/2
:0
:2
P
M
MD103
MECHANICAL DEMOLITION PLAN - 20'-0" TO
30'-0" AFF OF BOILER ROOM
LEBANON BOILER PLANT
RENOVATION
1700 S. LINCOLN AVE.
LEBANON, PA 17024
595-13-101
2021-03-26 JJM JJP0499-0106
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"
1 MECHANICAL DEMOLITION PLAN - 20'-0" TO 30'-0" AFF OF BOILER ROOM
1. REMOVE THE 6" HPS PIPING FROM EACH BOILER OUTLET TO THE STEAM HEADER. INCLUDE ASSOCIATED VALVES, DRAINS, TRAPS, INLINE DEVICES, INSULATION, HANGERS AND SUPPORTS.
2. REMOVE THE SAFETY VALVES AND THE ASSOCIATED VENT PIPING FROM EACH OF THE BOILER SAFETY VALVES, THROUGH THE ROOF. REMOVE THE DRIP PAN ELBOWS
AND ASSOCIATED DRAIN PIPING. INCLUDE ASSOCIATED HANGERS AND SUPPORTS.
3. REMOVE THE BOILER STACK IN ITS ENTIRETY FROM EACH OF THE BOILERS.
4. REMOVE THE 10" HPS PIPING FROM THE STEAM HEADER TO THE PRESSURE REDUCING STATION ON THE MEZZANINE IN ITS ENTIRETY. INCLUDE ALL INLINE DEVICES, VALVES, RELIEF PIPING, TRAPS, DRAINS, INSULATION, HANGERS AND SUPPORTS.
5. REMOVE THE THREE FEED WATER PUMPS AND ASSOCIATED FEED WATER PIPING INCLUDING SUCTION, DISCHARGE, AND RECIRCULATION PIPING AND ASSOCIATED
INSULATION, HANGERS, AND SUPPORTS IN ITS ENTIRETY, FROM THE DEAERATOR TO THE FEED WATER PUMPS AND FROM THE FEED WATER PUMPS TO THE BOILERS.
REMOVE ALL ASSOCIATED INLINE DEVICES INCLUDING ALL VALVES, STRAINERS, FLEX CONNECTORS, GAUGES AND SENSORS. REMOVE THE ASSOCIATED FEEDWATER
PUMP CONCRETE PADS.
6. REMOVE THE DEAERATOR AND ASSOCIATED PIPING, INCLUDING HIGH PRESSURE STEAM, LOW PRESSURE STEAM, PUMPED CONDENSATE, SOFTENED WATER, CHEMICAL
FEED, RECIRCULATION, OVERFLOW, DRAIN, SAMPLE, AND VENT PIPING AND ASSOCIATED INSULATION, HANGERS AND SUPPORTS IN ITS ENTIRETY, FROM THE DEAERATOR
TO THE STEAM HEADER, AND TO THE CONDENSATE TRANSFER PUMPS, FEED WATER PUMPS, SAFETY VALVES, AND THROUGH THE ROOF. REMOVE ALL ASSOCIATED
INLINE DEVICES INCLUDING ALL VALVES, STRAINERS, GAUGES AND SENSORS.
7. REMOVE THE 6" NATURAL GAS PIPING FROM AND INCLUDING THE ELBOW AT THE TOP OF THE RISER TO EACH OF THE BOILERS. INCLUDE ASSOCIATED VALVES, RELIEF PIPING, HANGERS AND SUPPORTS.
8. REMOVE 1" VENT LINE FROM DEARATOR TERMINATING THRU WINDOW. REMOVE PLUG-IN EXHAUST FAN. (NO NEED TO SEAL, THE WINDOW IS BEING REMOVED FOR THE
NEW DOOR.)
8 9
B
C
D
C.2
B.3333
5 5 5
(E)VENTILATOR
(E)EXHAUST FAN
BUILDING 10
(D)EXHAUST FAN
ABANDONED
COAL STORAGE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
ACTUAL
NORTH
/2
/2
:0
:3
P
M
MD104
MECHANICAL DEMOLITION ROOF PLAN LEBANON BOILER PLANT
RENOVATION
1700 S. LINCOLN AVE.
LEBANON, PA 17024
595-13-101
2021-03-26 JJM JJP0499-0106
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"
1 MECHANICAL DEMOLITION ROOF PLAN
1. ROOFING SYSTEM CONSISTS OF TAPERED INSULATION, PROTECTION COURSE, AND ROOFING SYSTEM. VERIFY MATERIALS, SYSTEMS, AND THICKNESSES IN FIELD. OBTAIN
MANUFACTURER AND WARRANTY INFORMATION FROM COR. ALL REPAIRS AND MODIFICATIONS SHALL PER ROOFING MANUFACTURER AND MAINTAIN THE WARRANTY.
GENERAL NOTES
1. REMOVE THE SAFETY VALVES AND THE ASSOCIATED VENT PIPING FROM EACH OF THE BOILER SAFETY VALVES, THROUGH THE ROOF. REMOVE THE DRIP PAN
ELBOWS AND ASSOCIATED DRAIN PIPING.
2. REMOVE VENT PIPING THROUGH THE ROOF FROM THE DEAERATOR, CONDENSATE SURGE TANK, FLASH TANK, SAFETY VALVES ETC. PATCH THE ROOF
PENETRATION WITH MATERIAL SIMILAR TO EXISTING ROOF AS APPROVED, TO MAINTAIN THE ROOFING WARRANTY.
3. REMOVE THE BOILER STACK & ROOF CURB IN ITS ENTIRETY FROM EACH OF THE BOILERS. PROVIDE TEMPORARY CAP AS REQUIRED TO MAINTAIN WEATHER
TIGHT ROOF OPENING.
4. REMOVE 6" HPS PIPING THROUGH ROOF TO AND INCLUDING SILENCER AND STACK. INCLUDE ASSOCIATED GUY WIRES AND SUPPORTS. CAP ROOF CURB
WEATHER TIGHT.
5. REMOVE EXHAUST FAN, ROOF CURB AND ASSOCIATED DEVICES AND CONTROLS. PROVIDE TEMPORARY CAP AS REQUIRED TO MAINTAIN WEATHER TIGHT ROOF
OPENING.
8 9
B
C
D
C.2
B.3
18' - 0" 18' - 0" 11' - 3 3/4"
8' - 8 1/4"
5' - 7 1/4"
(E)SUMP
PIT
10-BDS-11
10-CRU-2
10-CRU-1 3
4' - 4"
3' - 7 1/2"
NEW TRENCH FOR
FO & BLOWDOWN PIPING
NEW TRENCH FOR
FO & BLOWDOWN PIPING
BUILDING 10
CHILLER PLANT
TOILET/LOCKER
ROOM
CONTROL ROOM
GENERATOR
ROOM
OFFICE
TOOL ROOM
BOILER ROOM
PUMP ROOM
PUMP PIT
10-HRU-1
10' - 3 1/4"
5' - 4" 2' - 8" 2' - 8"12' - 8" 12' - 8" 11' - 3 3/4"
8' - 7 3/4"5' - 4"
10-FOP-1
7 77777
CATWALK
SUPPORT
LOCATIONS
(TYPICAL)
10-FOP-2
CLCLCL
CL
CL CLCLCL CL CL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
ACTUAL
NORTH
/2
/2
:0
:4
P
M
MQ101
MECHANICAL EQUIPMENT ARRANGEMENT
LOWER PLAN
LEBANON BOILER PLANT
RENOVATION
1700 S. LINCOLN AVE.
LEBANON, PA 17024
595-13-101
2021-03-26 JJM JJP0499-0106
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"
1 MECHANICAL EQUIPMENT ARRANGEMENT LOWER PLAN
NEW BOILER PLANT EQUIPMENT TABLE
TAG # QUANTITY DESCRIPTION
1 1
2 1
3 2
BLOW DOWN SEPARATOR W/ AFTERCOOLER
CONDENSATE RECEIVER/PUMPS, 110 GALLON RECEIVER, 150 GPM PUMPS
FUEL OIL PUMP SKID
4 3
5 1 CENTERLINE OF NEW DEARATOR
CENTERLINE OF NEW BOILERS
6 1 SURFACE BLOWOFF HEAT RECOVERY UNIT
7 6 BOILER SUPPORT STEEL (SEE STRUCTURAL DRAWINGS)
8 1 EMERGENCY GENERATOR EQUIPMENT PAD (SEE STRUCTURAL DRAWINGS)
9 1 EMERGENCY GENERATOR DAY TANK EQUIPMENT PAD (SEE STRUCTURAL DRAWINGS)
B
C
D
C.2
B.3
7' - 2 1/4" 2' - 8" 2' - 8 1/4"
9' - 10"
18' - 0" 18' - 0" 11' - 3 3/4"
(R E F T U B E
P U L L
18' - 0"18' - 0"21' - 7 1/4" 11' - 3 3/4"
10-B-310-B-210-B-1 10-FHX-2 10-FHX-3
10-FHX-1
16' - 5"7' - 4 1/4"5' - 2 1/4"
12' - 4"
10-D/A-1
10-FWP-1
10-FWP-2
10-FWP-3
(BELOW D/A)
(BELOW D/A)
(BELOW D/A)
10-CS-1
1 12 2 1
10-STS-1 8
BUILDING 10
CHILLER PLANT
TOILET/LOCKER
ROOM
CONTROL ROOM
GENERATOR
ROOM
OFFICE
TOOL ROOM
BOILER ROOM
MID-LEVEL
MEZZANINE
STORAGE STORAGE
UP
DN
7(2)
BELOW
CONDENSATE TANK
(R E F T U B E
P U L L
(R E F T U B E
P U L L
10-UH-410-UH-310-UH-2
10-UH-1
10-UH-8
10-UH-7 10-UH-6 10-UH-5
5 5 5
15'-0" AFF
TYP OF 8
NEW SAMPLE
COOLERS
BOILER MASTER
CONTROL PANEL
10-FOP-1
10-G-1
10-DT-1
1' - 6"
2' - 9"
CLCLCL
CL
10-CS-1
CONTROL PANEL
10-FOP-1
10-UH-9
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
ACTUAL
NORTH
/2
/2
:0
:5
P
M
MQ102
MECHANICAL EQUIPMENT ARRANGEMENT
UPPER PLAN
LEBANON BOILER PLANT
RENOVATION
1700 S. LINCOLN AVE.
LEBANON, PA 17024
595-13-101
2021-03-26 JJM JJP0499-0106
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"
1 MECHANICAL EQUIPMENT ARRANGEMENT UPPER PLAN
NEW BOILER PLANT EQUIPMENT TABLE
TAG # QUANTITY DESCRIPTION
1 3
700 HP TWO-PASS WET-BACK FIRE TUBE STEAM BOILER. 2-PASS W/
NATURAL GAS/NO. 2 FUEL OIL FIRED.
2 3 BOILER FEEDWATER HEAT EXCHANGER (ECONOMIZER)
3 1 VERTICAL TRAY DEARATOR - 2000 GALLON TANK CAPACITY,
4 1 BOILER FEEDWATER PUMPS, VERTICAL
6 1 CONDENSATE STORAGE TANK - 2200 GALLONS
7 2 CONDENSATE TRANSFER PUMPS
8 1 STEAM TEST SILENCER
5 8 UNIT HEATER
9 1 FUEL OIL PUMP SKID
10 1 EMERGENCY GENERATOR (SEE ELECTRICAL DRAWINGS)
11 1 EMERGENCY GENERATOR DAY TANK
8 9
B
C
D
C.2
B.3
MP302
MP301
(E)INCOMING FO SERVICE
FROM 61"x14" PIT
SEE MP102 FOR CONT.
TYP 6
1-1/2" FOS/R
IN TRENCH
TYP
MAXON AUTOMATED
SHUT-OFF VALVE
10-BDS-1
10-D/A-1
10-B-1 10-B-2 10-B-3
FO & BLOWDOWN PIPING
IN NEW TRENCH.
SEE STRUCTURAL DWGS.
6" HPR TAP
FOR TEMPORARY/FUTURE
CONDENSATE RECIEVER
10-CRU-2
10-CRU-1
6" HPR
1" FOS
1" FOR
1" FOS
1" FOR1" FOS
1" FOR
6" LPR
6"Ø HPR RISE
2" BD 2" BD
2" BD
(E)SUMP PIT
6" BD
2" BD2" BD
3" OFL DN
TO FLOOR DRAIN
4" OFL DN
TO TRENCH
FROM D/A
4" OFL
4" OFL
4" OFL DN TO
10-CRU-1 & 2
6" BD
DISCHARGE
TO SUMP
10" HPS DROP
FROM PRV
3" SOFTENED WATER
(SEE PLUMBING PLANS
FOR CONT.)
3" DOMESTIC WATER
(SEE PLUMBING DRAWINGS
FOR CONT.)
3" DOMESTIC WATER
(SEE MP102 FOR CONT.)
6" BDS VENT
(SEE MP102 FOR CONT.)
3" SW & 3" CW
(SEE MP102
FOR CONT.)
10" HPS CONNECT TO
EXISTING HPS IN TUNNEL
4" HPR CONNECT TO
EXISTING HPR IN TUNNEL
TYP 3
4" HPS CONNECT TO
EXISTING HPS IN TUNNELCHILLER PLANT
TOILET/LOCKER
ROOM
CONTROL ROOM
GENERATOR
ROOM
OFFICE
TOOL ROOM
BOILER ROOM
PUMP ROOM
PUMP PIT
DN
BUILDING 10
(E)STEAM TUNNEL
3" LPR
(TYP)
1" DRAIN ROUTE TO
NEAREST FLOOR DRAIN
10-HRU-1
2-1/2" FLASH STEAM VENT
FROM 10-HRU-1 UP
THRU ROOF
2 1/2" SV
1-1/2" SBO
(SEE MP102
FOR CONT.)
10" HPS
1" SAFETY RELIEF VALVE
ROUTE TO NEAREST
FLOOR DRAIN
MP301
MP302
10-FWP-2
10-FWP-1
10-FWP-3
(BELOW D/A)
(BELOW D/A)
(BELOW D/A)
1" BD FROM
BOILER
2" BD FROM
BOILER
2" BD FROM
BOILER
2" BD FROM
BOILER
2" BD FROM
BOILER
2" BD FROM
BOILER
2" HPS RISE
(TO BOILER ROOM
UNIT HEATERS)
PIPE HANGER
TYPICAL
10-FOP-1
1 1/2" FOS
1 1/2" FOR
1 1/2" SW
1 1/2" SW
EMERGENCY
GENERATOR CURB
(SEE STRUCTURAL
DRAWINGS)
FUEL OIL DAY
TANK CURB
(SEE STRUCTURAL
DRAWINGS)
10-FOP-2
CARBON MONOXIDE SENSOR
MOUNT 4'-0" AFF
CO
CARBON MONOXIDE SENSOR
MOUNT 4'-0" AFF
CO
CARBON MONOXIDE SENSOR
MOUNT 4'-0" AFF
CO
CARBON MONOXIDE SENSOR
(MOUNT 4'-0" AFF)
PROPANE SENSOR
(MOUNT 18" AFF)
CO
P
CO
P
CARBON MONOXIDE SENSOR
(MOUNT 3'-0" ABOVE
PUMP PIT FLOOR)
PROPANE SENSOR
(MOUNT 3'-0" ABOVE
PUMP PIT FLOOR)
CO
CARBON MONOXIDE SENSOR
(MOUNT 1'-6" AFF)
T
10-UH-7
T
10-UH-6
T
10-UH-8
T
10-UH-5
T
10-UH-2
T
10-UH-3
T
10-UH-4
T
10-UH-1
8765432 9
VOID-For Temp Plots
4 53
3' - 6"
10-CFT-01
CHEMICAL FEED
TANKS
CHEMICAL TESTING
SINK LOCATION
EMERGENCY
EYEWASH/SHOWER
LOCATION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
ACTUAL
NORTH
/8
/2
:4
:0
P M
MP101
MECHANICAL NEW WORK FLOOR/TRENCH
LEVEL PLAN
LEBANON BOILER PLANT
RENOVATION
1700 S. LINCOLN AVE. LEBANON, PA 17024
595-13-101
2021-03-26 JJM JJP0499-0106
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"
1 MECHANICAL NEW WORK FLOOR/TRENCH LEVEL PLAN
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.
3. REFER TO DRAWINGS MP701 AND MP702 FOR EQUIPMENT SCHEDULES.
GENERAL NOTES
1. REFER TO STRUCTURAL DRAWINGS FOR PIPING RESTRAINT.
2. SEE STRUCTURAL FOR PIPE GUARD.
3. LOCATE UNIT HEATER THERMOSTAT 4'-6" AFF. FAN SHALL CYCLE TO MAINTAIN A SETPOINT OF
50°F.
4. 4" D/A OVERFLOW TO DUPLEX CONDENSATE PUMPS 10-CRU-1 & 2.
WORK WITH FLOW DIAGRAMS, DRAWINGS MP601, MP602 & MP603.
5. SEE FLOW DIAGRAM DRAWINGS MP601, MP602 & MP603 FOR D/A AND SURGE TANK SYSTEM
BYPASS PIPING.
SHEET KEYNOTES
Revisions: Date:
1 ADDENDUM NO. 1-ADDED D/A AND SURGE TANK BYPASS PIPING 07/28/21
RFI #1 04/06/22
8 9
B
C
D
C.2
B.3
MP302
MP301
10-B-3 10-B-2
10-B-1
10-CS-1
(N)LOWER CATWALK
ELEV:12'-0" TOG
8" LPS
18' - 2"COP
24" BOILER
STACK
24" BOILER STACK
24" BOILER STACK
10-FHX-310-FHX-2
10-FHX-1
10-D/A-1
10-FWP-2
10-FWP-1
10-FWP-3
(N)CATWALK
ELEV:13'-8" TOG
(BELOW D/A)
(BELOW D/A)
(BELOW D/A)
SV-12
8" HPS UP TO
STEAM HEADER
(SEE MP103
FOR CONT.)
8" HPS DROP
TO BOILER
8" HPS DROP
TO BOILER
8" HPS DROP
TO BOILER
4" NG TO
GAS TRAIN
2-1/2" BFW
TO BOILER
2-1/2" BFW
TO BOILER 4" SV-5 &
SV-6 UP
THRU ROOF4" SV-3 & SV-4
UP THRU ROOF
4" SV-1 & SV-2
UP THRU ROOF
3'X3' OPENING
IN GRATING FOR
ACCESS BELOW
(SEE STRUCTURAL
DRAWINGS)
2-1/2"
TANK BYPASS
10-CTP-1
10-CTP-2
(BELOW COND.
TANK)
8" HPS
DRIP LEGS
W/ STEAM TRAPS
(E)8" NATURAL GAS
SUPPLY
(E)1" LPG
SUPPLY
NEW FO PIPING
CONNECTIONS TO EXISTING
INCOMING FO SERVICE
2" FOS
1-1/2" FOR
CONNECTIONS FOR
TEMPORARY BOILERS
1 1/2" FOR
(E)6" NG MAXON
AUTOMATED
SHUT-OFF VALVE
IN VERTICAL
3" PC TAP THRU WALL
TO TEMPORARY/FUTURE
BOILERS
2 1/2" LPR
6" BDS VENT
UP THRU ROOF
6" BDS VENT
(SEE DWG MP101
FOR CONT.)
1" BD DN
TO TRENCH
1" BD DN
TO TRENCH 2" BD DN
TO TRENCH
2-1/2"
BFW RISE
4" NG DROP
2-1/2" BFW RISE
4" NG DROP 2-1/2" BFW RISE
4" NG DROP
OVERHEAD DOOR
(SEE STRUCTURAL DWGS)
1" BD DN
TO TRENCH
2" BD DN
TO TRENCH
2-1/2"
TANK BYPASS
DRAIN DN TO
(E)SUMP
2" SV FROM
BELOW & UP
THRU ROOF
6" PCR FROM
10-CRU-1 & 2
BELOW
3" OFL DN
TO FLOOR DRAIN
3" OFL
4" OFL DN
TO TRENCH
4" OFL
3" CTPD
3" SW UP
2" BD DN
TO TRENCH
NEW 1" LPG
CONNECTION TO
(E)1" INCOMING LPG
3/4" LPG DROP
TO GAS TRAIN
3/4" LPG DROP
TO GAS TRAIN
3/4" LPG DROP
TO GAS TRAIN
10-CS-1
CONTROL PANEL
3" SW
(SEE MP101
FOR CONT.)
3" SW & 3" CW
(SEE MP101 FOR CONT.)
10" HPS THRU WALL FOR
TEMPORARY/FUTURE
CONNECTION
3" CTPD UP
CHILLER PLANT
CONTROL ROOM
GENERATOR
ROOM
OFFICE
BOILER ROOM
MID-LEVEL
MEZZANINE
COND. TANK
ROOM
TOOL ROOM
STORAGE STORAGE
DN
UP
BUILDING 10
8" HPS UP TO
STEAM HEADER
(SEE MP103
FOR CONT.)
4" SV UP
THRU ROOF
10-UH-1
10-UH-2 10-UH-3
10-UH-4
10-UH-5
10-UH-610-UH-7
10-UH-8 1-1/2" SBO
(SEE MP101 FOR CONT.)
(2)SAMPLE COOLERS
FOR BOILERS 1,2&3 AND DEARATOR
(COORDINATE LOCATION WITH SINK,
SEE PLUMBING DWGS)
2" FOS
MP301
MP302
2-1/2" BFW
TO BOILER
4" NG TO
GAS TRAIN
4" NG TO
GAS TRAIN
2-1/2" FLASH STEAM VENT
FROM 10-HRU-1 UP
THRU ROOF
10-FOP-1
1 1/2" HPR
1-1/2" HPR DN TO
CONDENSATE STORAGE TANK
1-1/2" HPR DROP
1-1/2" HPR DROP
1 1/2" HPR
2" HPS DN TO
10" STEAM MAIN
1 1/2" HPR
1-1/2" HPS RISE
FROM BELOW CATWALK
1-1/2" HPS DROP
BELOW CATWALK
1 1/2" HPS
3/4" HPS3/4" HPR
1" HPR
1" HPS
3/4" HPR
3/4" HPS
1 1/2" HPS
1 1/2" HPR
8" HPS
DRIP LEGS
W/ STEAM TRAPS
3/4" HPR
3/4" HPS
3/4" HPR
3/4" HPS
1" HPS1" HPR 1 1/2" HPS
1 1/2" HPR
2" HPS
PIPE HANGER
TYPICAL
2-1/2" EMERGENCY MAKE-UP WATER
(SEE PLUMBING PLANS FOR CONT.)
2-1/2" EMERGENCY MAKE-UP
WATER TO 10-CS-1
8" SV-11
FROM DEARATOR
8" LPS
4" OFL
8" LPS UP
TO PRV-1
PRV-2 & PRV-3
BOILER MASTER
CONTROL PANEL
10-G-1
E
LE
C T R
IC
A L
P A N E
LS
10-DT-1
S E E
S H E E T G C
F O R
C O N
TI
N U A T
IO
N
40x96 OA DN FROM
MEZZANINE
W/ WIRE MESH
BIRD SCREEN
96x30 RADIATOR
EXHAUST LOUVER
3/4" FOS & FOR
FROM MEZZANINE
1" FOR
3/4" FOS
3/4" FOS
1" FOR
DO TO 10-G-1
10-FOP-2
10-UH-9
8x8 EA UP
THRU CEILING
TOILET/LOCKER
ROOM
EG-1
230 CFM
EG-1
230 CFM
(2)3" EMERGENCY VENTS
& 2" NORMAL VENT
UP THRU MEZZANINE & ROOF
8" GENERATOR
EXHAUST UP TO
MEZZANINE
GAS DETECTION
CONTROLLOR
T
10-UH-9
T
10-EF-4
8765432 9
(BELOW)
VOID-For Temp Plots
6 7
6 7
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
ACTUAL
NORTH
/2
/2
:3
:3
A
M
MP102
MECHANICAL NEW WORK LOWER CATWALK
PLAN
LEBANON BOILER PLANT
RENOVATION
1700 S. LINCOLN AVE. LEBANON, PA 17024
595-13-101
2021-03-26 JJM JJP0499-0106
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"
1 MECHANICAL NEW WORK LOWER CATWALK PLAN
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.
3. REFER TO DRAWINGS MP701 AND MP702 FOR EQUIPMENT SCHEDULES.
GENERAL NOTES
1. 66"W X 42"H GENERATOR RADIATOR EXHAUST LOUVER. RUSKIN MODEL ELM90HFA ADJUSTABLE
LOUVER OR EQUAL WITH 120 VAC ELECTRIC ACTUATOR, FACTORY MOUNTED AND TESTED.
LOUVER AND ACTUATOR SHALL BE DESIGNED TO WITHSTAND THE FORCES OF A 125 MPH
WIND, 40 PSF MINIMUM.
2. THE EMERGENCY GENERATOR RADIATOR EXHAUST DAMPER SHALL OPEN ON A SIGNAL FROM THE
EMERGENCY GENERATOR CONTROL SYSTEM. THE DAMPER SHALL BE OPEN WHEN THE
GENERATOR IS RUNNING AND CLOSED WHEN THE GENERATOR IS OFF.
3. SUPPORT 10-UH-9 FROM STRUCTURAL STEEL. BOTTOM OF UNIT HEATER 8'-0" AFF.
4. LOCATE UNIT HEATER THERMOSTAT 4'-6" AF. UNIT HEATER FAN SHALL CYCLE TO MAINTAIN A
SETPOINT OF 70°F.
5. LOCATE 10-EF-4 THERMOSTAT 4'-6" ABOVE UPPER PUMP ROOM FLOOR. INTERLOCK
10-GRV-5 DAMPER WITH 10-EF-4, THE DAMPER SHALL BE OPEN WHEN EXHAUST FAN IS ON
AND CLOSED WHEN THE EXHAUST FAN IS OFF. EXHAUST FAN SHALL CYCLE TO MAINTAIN A
TEMPERATURE OF 80°F.
6. 4" D/A OVERFLOW TO DUPLEX CONDENSATE PUMPS 10-CRU-1 & 2.
WORK WITH FLOW DIAGRAMS, DRAWINGS MP601, MP602 & MP603.
7. SEE FLOW DIAGRAM DRAWINGS MP601, MP602 & MP603 FOR D/A AND SURGE TANK SYSTEM
BYPASS PIPING.
SHEET KEYNOTES
1 ADDENDUM NO. 1-ADDED D/A AND SURGE TANK BYPASS PIPING 07/28/21
8 9
B
C
D
C.2
B.3
MP302
MP301
(N)UPPER CATWALK
ELEV:19'-0" TOG
8" HPS
29' - 4"COP
8" HPS
29' - 4"COP
8" HPS
29' - 4"COP
24"Ø BOILER STACK
FROM BOILER
PRV-1
TO DEAREATOR
12" HIGH PRESSURE
STEAM HEADER, 115 PSIG
10-D/A-1
24"Ø BOILER STACK
FROM BOILER
24"Ø BOILER STACK
FROM BOILER
8" HPS DROP 8" HPS DROP
3" BFW
3" BFW
3" BFW
3" BFW
DROP
8" LPS DROP
TO D/A
2-1/2" BFW
DROP TO 10-BFT-32-1/2" BFW
DROP TO 10-
BFT-2
2-1/2" BFW
DROP TO 10-BFT-1
10" HPS DROP
TO PRV
3" CTPD DN
8" CTPD DROP
8" CTPD RISE
10-STS-1
18" HPS
(SILENCER DISCHARGE
UP THRU ROOF)
4" SV-1 & SV-2
DN TO BOILER
4" SV-3 & SV-4
DN TO BOILER
4" SV-5 & SV-6
UP THRU ROOF
& DN TO BOILER
10" HPS
24' - 11 1/2"COP
3" CTPD
24' - 0 1/4"COP1-1/2" VENT
UP THRU ROOF
24"Ø BOILER STACK
UP THRU (E) ROOF
PENETRATION
24"Ø BOILER STACK
UP THRU (E) ROOF
PENETRATION 24"Ø BOILER STACK
UP THRU (E) ROOF
PENETRATION
(E)6" NG
6" NG
2" SAFETY VENT
FROM 10-CRU-2
UP THRU ROOF
2" SAFETY VENT
FROM 10-CRU-1
UP THRU ROOF
6" BLOWDOWN
SEPARATOR VENT
UP THRU ROOF
4" NG DROP
TO GAS TRAIN
4" NG DROP
TO GAS TRAIN
4" NG DROP
TO GAS TRAIN
3" SW
3" CTPD
3" SW DROP
3/4" LPG DROP
TO GAS TRAIN
3/4" LPG DROP
TO GAS TRAIN
3/4" LPG DROP
TO GAS TRAIN
1" LPG DROP
1" LPG
1" LPG
3/4" LPG
4" SAFETY VENT
FROM 10-CS-1
UP THRU ROOF
BOILER ROOM
UPPER-LEVEL
MEZZANINE
WALKABLE
CEILING
UP
ABANDONED
COAL STORAGE
BUILDING 10
4" SV-3 & SV-4
UP THRU ROOF
4" SV-1 & SV-2
UP THRU ROOF
3" SW
3" SW
NG FLOWMETER
NG FLOW
CONDITIONER
NG FLOWMETER
NG FLOW
CONDITIONER
NG FLOWMETER
NG FLOW
CONDITIONER
MP301
MP302
10" CAPPED TAP
10" CAPPED TAP
2-1/2" FLASH STEAM VENT
FROM 10-HRU-1 UP
THRU ROOF
PIPE HANGER
TYPICAL
PIPE HANGER
TYPICAL
PIPE HANGER
TYPICAL
SV-10
8" LPS DN
TO DEAERATOR
10" VENT
FROM SV-12
108x44 OA
INTAKE LOUVER
M x
O A
BOD 28" ABOVE MEZZANINE
40x96 OA DN
THRU MEZZANINE
TO GENERATOR ROOM
3/4" FOS & FOR
DN THRU MEZZANINE
TO 10-DT-1
3/4" FOS & FOR
THRU EXTERIOR WALL
TO 10-FOT-1.
SEE GC101 FOR
CONTINUATION
S E E
S H E E T G C
F O R
C O N
TI
N U A T
IO
N
10x10 EA RISE
ALONG WALL
10x10 EA UP
THRU ROOF TO
10-EF-5
(2)3" EMERGENCY VENTS
& 2" NORMAL VENT
UP THRU MEZZANINE & ROOF
12"Ø GENERATOR EXHAUST
UP THRU ROOF
GENERATOR EXHAUST MUFFLER
(HUNG FROM ROOF STRUCTURE)
8"Ø GENERATOR
EXHAUST DN
THRU MEZZANINE
TO 10-G-1
NG NG NGNATURAL GAS SENSOR
(MOUNTED TO BOTTOM OF ROOF
TRUSS ABOVE GAS TRAIN) TYP 3
VDVD
8x8 EA UP
THRU CEILING
8x8 EA UP
THRU CEILING
1 2
T
10-EF-1
10-EF-2
10-EF-3
8765432 9
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
ACTUAL
NORTH
/2
/2
:0
:0
P
M
MP103
MECHANICAL NEW WORK UPPER CATWALK
PLAN
LEBANON BOILER PLANT
RENOVATION
1700 S. LINCOLN AVE.
LEBANON, PA 17024
595-13-101
2021-03-26 JJM JJP0499-0106
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"
1 MECHANICAL NEW WORK UPPER CATWALK PLAN
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.
3. REFER TO DRAWINGS MP701 AND MP702 FOR EQUIPMENT SCHEDULES.
GENERAL NOTES
1. 108"W X 42"H OUTSIDE AIR INTAKE LOUVER. RUSKIN MODEL ELF6375DXD OR EQUAL. 15,000
CFM AT 0.13" W.C. PRESSURE DROP LOUVER SHALL BE DESIGNED TO WITHSTAND THE FORCES
OF A 125 MPH WIND, 40 PSF MINIMUM. INSTALL LOUVER IN WALL OPENING LEFT BY THE
REMOVAL OF THE EXISTING AHU LOUVER LOCATED ABOVE THE MEZZANINE.
2. OUTSIDE AIR INTAKE DAMPER SHALL OPEN ON A SIGNAL FROM THE EMERGENCY GENERATOR
CONTROL SYSTEM. THE DAMPER SHALL BE OPEN WHEN THE GENERATOR IS RUNNING AND BE
CLOSED WHEN THE GENERATOR IS OFF.
3. LOCATE EXHAUST FAN THERMOSTAT 18'-0" AFF. 10-EF-1, 2 & 3 SHALL RUN TO MAINTAIN A
SETPOINT OF 80°F.
8 9
B
C
D
C.2
B.3
MP302
24" BOILER STACK
W/ WEATHER CAP
4" SV-5 & SV-6
4" SV-1 & SV-2
18" HPS
(SILENCER DISCHARGE)
1-1/2" SAFETY VENT
FROM DEAERATOR
6" BLOWDOWN
SEPARATOR VENT
2" SAFETY VENT
FROM 10-CRU-1
2" SAFETY VENT
FROM 10-CRU-2
4" SAFETY VENT
FROM 10-CS-1
(E)VENTILATOR
(E)EXAHUST FAN
BUILDING 10
ROOF CURB
TYP
ROOF CURB
10-GRV-2
10-GRV-410-GRV-3
10-EF-3
ROOF CURB
10-EF-2
ROOF CURB
10-EF-1
4" SV-3 & SV-4
10-GRV-1
2-1/2" FLASH STEAM VENT
FROM 10-HRU-1
ROOF CURB
10-EF-4
10-GRV-5
SV-10
SV-11
10" VENT
FROM SV-12
10-EF-5
(2)3" EMERGENCY VENTS
& 2" NORMAL VENT
12" GENERATOR
EXHAUST
24" BOILER STACK
W/ WEATHER CAP
24" BOILER STACK
W/ WEATHER CAP
8765432 9
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
ACTUAL
NORTH
/2
/2
:0
:1
P
M
MP104
MECHANICAL NEW WORK ROOF PLAN LEBANON BOILER PLANT
RENOVATION
1700 S. LINCOLN AVE.
LEBANON, PA 17024
595-13-101
2021-03-26 JJM JJP0499-0106
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"
1 MECHANICAL NEW WORK ROOF PLAN
1. REFER TO DRAWING M-001 FOR NOTES, SYMBOLS AND ABBREVIATIONS.
2. REFER TO DRAWINGS MP601, MP602, MP603 AND MP604 FOR SYSTEM FLOW DIAGRAMS.
3. REFER TO DRAWINGS MP701 AND MP702 FOR EQUIPMENT SCHEDULES.
1. ROOFING SYSTEM CONSISTS OF TAPERED INSULATION, PROTECTION COURSE, AND ROOFING
SYSTEM. VERIFY MATERIALS, SYSTEMS, AND THICKNESSES IN FIELD. OBTAIN MANUFACTURER
AND WARRANTY INFORMATION FROM COR. ALL REPAIRS AND MODIFICATIONS SHALL PER
ROOFING MANUFACTURER AND MAINTAIN THE WARRANTY.
GENERAL NOTES
10-B-310-B-210-B-1
8" LPS
10-CS-1
8" HPS
8" HPS8" HPS
Boiler Room 0' - 0"
Roof 33' - 2"
Lower Catwalk 12' - 0"
Upper Catwalk 19' - 0"
Upper Pump Room -6' - 1"
Lower Pump Room -9' - 7"
3" CTPD10-STS-1
10-CTP-2
3" CTPD
10-HRU-1
2" BD 2" BD 2" BD
4" NG
4" NG 4" NG
1 1/2" BD
1 1/2" SW
1 1/2" SW
10" HPS
4" SV
1 1/2" HPS
1 1/2" BD
3" SW
10-UH-8
3" CTPD
1 1/2" HPR
PIPE CURB
SEE DETAIL 3/MP502
(TYPICAL)
10-D/A-1
6" PCR
2-1/2" EMERGENCY
MAKE-UP WATER
8765432 9
Boiler Room 0' - 0"
Lower Catwalk 12' - 0"
Upper Catwalk 19' - 0"
Upper Pump Room -6' - 1"
Lower Pump Room -9' - 7"
10-UH-7 10-UH-6 10-UH-5
8" HPS
8" HPS3" HPS
8" LPS
8" LPS
3" HPS
3" HPS
8" HPS
8" HPS
10" HPS
12" HPS
10" HPS
10" HPS
10" HPS
6" BD
5" HPR4" HPR
4" HPR
(E)SUMP
2 1/2" LPR
3" OFL
4" HPS
10" HPS
PRV-1
6" LPS
TO DEARATOR
WELDED CAP
TYPICAL
SV-10
2" HPS
10" TAP W/
BLIND FLANGE
3" PC VALVE & TAP
FOR TEMPORARY PUMPS
6" HPR
6" BD
EXISTING
PIPE TUNNEL
10" TAP W/
BLIND FLANGE
10-EF-4
PIPE RESTRAINT
SEE STRUCTURAL DWGS
87654 9
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
/2
/2
:0
:2
P
M
MP301
MECHANICAL SECTIONS LEBANON BOILER PLANT
RENOVATION
1700 S. LINCOLN AVE.
LEBANON, PA 17024
595-13-101
2021-03-26 JJM JJP0499-0106
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"
1 MECHANICAL OVERALL BOILER ROOM SECTION
SCALE: 1/4" = 1'-0"
2 MECHANICAL SECTION @ STEAM HEADER & TUNNEL
10-B-2 ø
E A
H P S
10-FHX-2
Boiler Room 0' - 0"
Roof 33' - 2"
Lower Catwalk 12' - 0"
Upper Catwalk 19' - 0"
CENTERLINE OF
12" HEADER
10-UH-3
10-UH-6
10-GRV-410-GRV-2
10-EF-3
4" SV
3" SW
3" CTPD
2 1/2" BFW
6" NG
2 1/2" BFW
3/4" HPS3/4" HPR
4" NG
3/4" LPG
1" BD
1 1/2" FOS
1 1/2" FOR
18" HIGH BOILER STACK CURB
SEE DETAIL 1/MP502
PIPE CURB
SEE DETAIL 3/MP502
3/4" HPS
3/4" HPR
WEATHER CAP
Boiler Room 0' - 0"
Roof 33' - 2"
Lower Catwalk 12' - 0"
Upper Catwalk 19' - 0"
Upper Pump Room -6' - 1"
2" BD
10-BDS-1
3" OFL
3" SW
10" HPS
6" HPS
6" HPS
8" HPS
10" HPS
6" SV
3" CTPD
PRV-2
1 1/2" BD
PRV-3
10" HPS
TO TUNNEL
10" HPS FROM
STEAM HEADER
SV-12
10" SV
1 1/2" HPR
2" HPS
PIPE CURB
SEE DETAIL 3/MP502
NOTE: FOR PRV SUPPORT SEE STRUCTURAL DWGS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
/2
:0
:2
P
M
MP302
MECHANICAL SECTIONS LEBANON BOILER PLANT
RENOVATION
1700 S. LINCOLN AVE.
LEBANON, PA 17024
595-13-101
2021-03-26 JJM JJP0499-0106
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/4" = 1'-0"
1 MECHANICAL SECTION @ BOILER 2
SCALE: 1/4" = 1'-0"
2 MECHANICAL SECTION @ PRV 2 & 3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD MILLER-REMICK LLC
PROFESSIONAL ENGINEERCONSULTANT
321 4 5 6 7 8 9 10
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEEER
MR PROJECT NO:
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e r in c h o n e fo o t n e in c h o n e fo o t n e a n d o n e h a lf in c h o n e fo o t re e in c h o n e fo o t
/2
:0
:4
P
M
MP303
MECHANICAL 3D VIEWS LEBANON BOILER PLANT
RENOVATION
1700 S. LINCOLN AVE.
LEBANON, PA 17024
595-13-101
2021-03-26 JJM JJP0499-0106
BID DOCUMENTS
FULLY SPRINKLERED
SCALE:
1 3D BOILER ROOM
SCALE:
2 3D PUMP PIT & SURGE TANK
SCALE:
3 3D DEARATOR
SCALE:
4 3D @ 10-B-1
SCALE:
5 3D LOWER LEVEL/TUNNEL
SCALE:
6 3D PRV-2 & 3
SCALE:
7 3D PRV-1 & STEAM HEADER
NTSNTS
NTS
NTS
NTS
NTS
NTS
MECHANICAL (STEAM GENERATION)
DETAILS - 1
MP501
JJMJJM
LEBANON BOILER
PLANT RENOVATION
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0106
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT 595-13-101
Project Director
2021-03-26
FULLY SPRINKLERED
DETAILS - 2
MP502
JJMJJM
LEBANON BOILER
PLANT RENOVATION
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0106
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT 595-13-101
Project Director
DETAILS - 3
MP503
JJMJJM
LEBANON BOILER
PLANT RENOVATION
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0106
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT 595-13-101
Project Director
MECHANICAL STEAM GENERATION
FLOW DIAGRAM - BOILERS
MP601
JJPJM
LEBANON BOILER
PLANT RENOVATION
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0106
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT 595-13-101
Project Director
NATURAL GAS AND NO. 2 FUEL OIL
FLOW DIAGRAM
MP604
JJPJM
LEBANON BOILER
PLANT RENOVATION
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0106
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT 595-13-101
Project Director
TEMPORARY STEAM BOILER SYSTEM
PHASE 1 (RENTAL & TEMPORARY )
MP605
JJPJM
LEBANON BOILER
PLANT RENOVATION
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0106
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT 595-13-101
Project Director
EMERGENCY GENERATOR FUEL OIL
FLOW DIAGRAM
MP606
RHDJM
LEBANON BOILER
PLANT RENOVATION
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0106
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT 595-13-101
Project Director
2021-03-26
1 ADDENDUM #3 08-10-21
SCHEDULES - 1
MP701
JJMJJM
LEBANON BOILER
PLANT RENOVATION
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0106
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT 595-13-101
Project Director
SCHEDULES - 2
MP702
JJMJJM
LEBANON BOILER
PLANT RENOVATION
NO. DESCRIPTION DATE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
MILLER-REMICK LLC
PROFESSIONAL ENGINEER
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0499-0106
B
A
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ENGINEER OF RECORDCONSULTANT 595-13-101
Project Director
2021-03-26
1 07/28/2021
| 2021-03-26 Bid Documents - Drawing PDFs 00_General Information |
| 2021-03-26 Bid Documents - Drawing PDFs 01_Civil |
| GC101 |
| GC102 |
| 2021-03-26 Bid Documents - Drawing PDFs 02_Structural |
| S-001 |
| S-002 |
| SD101 |
| SD102 |
| SD501 |
| SD502 |
| SF101 |
| SF102 |
| SF103 |
| SF104 |
| SF105 |
| S-501 |
| S-502 |
| S-503 |
| S-504 |
| S-505 |
| S-506 |
| S-507 |
| S-508 |
| 2021-03-26 Bid Documents - Drawing PDFs 02a_Fire Protection |
| FX001 |
| FX101 |
| FX102 |
| 2021-03-26 Bid Documents - Drawing PDFs 03_Plumbing |
| P-001 |
| PD101 |
| PD102 |
| PD103 |
| PD104 |
| PP101 |
| PP102 |
| PP103 |
| PP104 |
| PP105 |
| P-601 |
| P-701 |
| 2021-03-26 Bid Documents - Drawing PDFs 03a_Life Safety |
| 2021-03-26 Bid Documents - Drawing PDFs 04_Mechanical |
| M-001 |
| M-001 |
| MD101 |
| M-001 |
| MD102 |
| M-001 |
| MD103 |
| M-001 |
| MD104 |
| M-001 |
| M-001 |
| M-001 |
| M-001 |
| M-001 |
| M-001 |
| M-001 |
| M-001 |
| M-001 |
| M-001 |
| M-001 |
| M-001 |
| M-001 |
| M-001 |
| M-001 |
| M-001 |
| M-001 |
| M-001 |
| M-001 |
| M-001 |
| 2021-03-26 Bid Documents - Drawing PDFs 05_Electrical |
| E-001 |
| E-002 |
| ED101 |
| EL101 |
| EP101 |
| EP102 |
| EP111 |
| E-501 |
| E-601 |
| E-701 |
| E-001 |
| E-002 |
| ED101 |
| EL101 |
| EP101 |
| EP102 |
| EP111 |
| E-501 |
| E-601 |
| E-701 |
| E-001 |
| E-002 |
| ED101 |
| EL101 |
| EP101 |
| EP102 |
| EP111 |
| E-501 |
| E-601 |
| E-701 |
| E-001 |
| E-002 |
| ED101 |
| EL101 |
| EP101 |
| EP102 |
| EP111 |
| E-501 |
| E-601 |
| E-701 |
| E-001 |
| E-002 |
| ED101 |
| EL101 |
| EP101 |
| EP102 |
| EP111 |
| E-501 |
| E-601 |
| E-701 |
| E-001 |
| E-002 |
| ED101 |
| EL101 |
| EP101 |
| EP102 |
| EP111 |
| E-501 |
| E-601 |
| E-701 |
| E-001 |
| E-002 |
| ED101 |
| EL101 |
| EP101 |
| EP102 |
| EP111 |
| E-501 |
| E-601 |
| E-701 |
| E-001 |
| E-002 |
| ED101 |
| EL101 |
| EP101 |
| EP102 |
| EP111 |
| E-501 |
| E-601 |
| E-701 |
| E-001 |
| E-002 |
| ED101 |
| EL101 |
| EP101 |
| EP102 |
| EP111 |
| E-501 |
| E-601 |
| E-701 |
| E-001 |
| E-002 |
| ED101 |
| EL101 |
| EP101 |
| EP102 |
| EP111 |
| E-501 |
| E-601 |
| E-701 |
File details come from the government source that posted it. Updated .