Exhibit B - Unit Rates - Revision 1.docx

DOCX document 24 KB Posted

Attached to
MCN Bypass Structure Inspection and Repair
Solicitation number
S-R33123-00012228
Issued by
Union County, Oregon

About this file

This is a unit rates exhibit (Exhibit B) for the MCN Bypass Structure Inspection and Repair project in Union County, Oregon. The document outlines the rate structure and billing requirements for contractors providing inspection and repair services for a 20'x30'x90' tall bypass structure.

The document establishes mark-up rates of 10% for direct expenses, subconsultant invoices, and materials, with receipts required for reimbursement. Labor billing rates are to be provided for both standard time and prevailing wage categories, inclusive of wages, salaries, payroll taxes, insurance, employee benefits, small tools (valued under $1,000), consumables, overhead, and profit. Equipment rates must be listed hourly, daily, and weekly, including mobilization and demobilization costs where applicable. The document also requests a lump sum cost for a new inspection report, which must account for all referenced documents including the RFP, Exhibits A through D, and any applicable addendums.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit B Unit Rates

1. These rates are to be used for all lump sum proposals provided to the District, and work that is authorized to proceed on a T&M basis.

2. Contractor shall provide the following mark-ups and must provide receipts for materials for them to be considered reimbursable:

a. Direct Expenses billed at cost plus 10%.

b. Subconsultant invoices billed at invoice plus 10%

c. All materials billed at cost plus 10%

3. The billing rates for labor shown below are inclusive of all wages and salaries, payroll taxes and insurance, employee benefits, small tools (initial value less than $1,000) and consumables, overhead, and profit.

Classification
Standard Time Billable Hourly Rate
Prevailing Wage Billable Hourly Rate

4. Equipment rates include un-operated costs.

Equipment
Hourly Rate
Daily Rate
Weekly Rate
Mob & Demob Costs (if Applicable)

5. Lump sum cost for new inspection report _$______________________.

a. This includes the RFP Document, Exhibit A, Exhibit B, Exhibit C, Exhibit D.

b. This includes Addendum(s) (List each applicable Amendment(s) ____________.

File details come from the government source that posted it. Updated .