This is a Unit Rates exhibit (Exhibit B) that outlines the billing structure and markup requirements for contract work with the District. The document appears to be related to a project that includes repairs identified during a site walk conducted on December 18, 2024, though specific repair details are not provided in this exhibit.
The document establishes markup rates of 10% for direct expenses, subconsultant invoices, and materials, with receipts required for reimbursement. Labor billing rates are to be provided for both standard time and prevailing wage categories, with rates including wages, payroll taxes, insurance, employee benefits, small tools (valued under $1,000), consumables, overhead, and profit. Equipment rates are to be quoted on hourly, daily, and weekly bases, with separate mobilization and demobilization costs for projects within District territory. The document references additional scope details contained in the RFP Document and Exhibits A through D, as well as any applicable addenda.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit B Unit Rates
1. These rates are to be used for all lump sum proposals provided to the District, and work that is authorized to proceed on a T&M basis.
2. Contractor shall provide the following mark-ups and must provide receipts for materials for them to be considered reimbursable:
a. Direct Expenses billed at cost plus 10%.
b. Subconsultant invoices billed at invoice plus 10%
c. All materials billed at cost plus 10%
3. The billing rates for labor shown below are inclusive of all wages and salaries, payroll taxes and insurance, employee benefits, small tools (initial value less than $1,000) and consumables, overhead, and profit.
| Classification |
| Standard Time Billable Hourly Rate |
| Prevailing Wage Billable Hourly Rate |
4. Equipment rates include un-operated costs. Mobilization & Demobilization costs are for hourly and daily use only and includes mobilization and demobilization to projects located in the District territory.
| Equipment |
| Hourly Rate |
| Daily Rate |
| Weekly Rate |
| Mob & Demob Costs (if Applicable) |
5. Cost of known repairs from site walk on 12/18/2024 and scope included in the RFP documents _$______________________.
a. This includes the RFP Document, Exhibit A, Exhibit B, Exhibit C, Exhibit D.
b. This includes Addendum(s) (List each applicable Amendment(s) ____________.