About this file
This is an exhibit form from a Kissimmee Utility Authority (KUA) solicitation for high voltage electrical substation services in Florida. The document serves as a template for contractors to document their relevant project experience, requiring submission of a minimum of five reference projects. For each project, contractors must provide comprehensive details including project location, owner information, project management contacts with phone numbers and addresses, contractor personnel (project manager, superintendent, and lead foreman) with corresponding phone numbers, project cost, contracted completion timeframe, notice to proceed date, demobilization date, maximum station voltage, whether the station remained energized during work, coordination status of any outages, safety incident records, and specific work performed such as power transformer relocation, as-built documentation, and energized work activities.
The exhibit form requires contractors to document critical operational and safety metrics for each reference project, including the number of uncoordinated outages (if applicable), safety violations or accidents, and detailed descriptions of any energized work performed along with corresponding employee certifications or training documentation. This information allows KUA to evaluate contractor experience and capability in performing complex high voltage substation work, including repairs, rebuilds, expansions, modifications, maintenance, testing, troubleshooting, and new installations on both high and low voltage systems. The form emphasizes contractor ability to work on live stations, coordinate with utility owners, maintain safety standards, and provide proper documentation of completed work.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT “B”
SUBSTATION CONSTRUCTION PROJECT EXPERIENCE
Complete one form for each reference project (minimum of five projects).
Project
Project Address Owner
Owner's Project Manager (PM) & Title PM Email
PM Phone Number PM Address
Contractor's Project Manager Project Manager's Phone Number
Contractor's Superintendent Superintendent's Phone Number
Contractor's Lead Foreman Foreman's Phone Number
Total Cost of Substation Project Contracted Time for Project Completion
Date of Notice to Proceed Date of Demobilization
Station Voltage (Maximum Level)
Station Was Live While Work Was Completed (Yes / No)
Outages Were Coordinated With Owner (If Station Was Live)
Number of Uncoordinated Station Outages
(If Station Was Live)
Number of Safety Violations or Accidents
Power Transformer Relocated Under Contractor's Supervision
(Yes / No)
As Builts Provided (Yes / No)
Energized Work Performed (Yes / No)
Description of Energized Work Performed and Employee Certification or Training (if applicable)