About this file

This document contains an exhibit template for collecting subcontractor information on a federal construction contract and the related solicitation amendment. The template requests information on major subcontractors for a parking structure project at the Wilkes-Barre VA Medical Center between $10-20 million. Subcontractors must provide references, consent to share past performance, and describe any liquidated damages assessed in the last five years. The solicitation is set aside for veteran-owned small businesses and utilizes tiered evaluations down to the large business level. Pricing must be in whole dollars. The contractor will be responsible for correct worker classification and wage compliance. The solicitation may be cancelled before award if in the government's best interest.

View the file

Other files for this federal contract opportunity

Other files attached to Y1LZ--693-222 | Parking Structure Solicitation Amendment 2, newest first.
File Type Posted
014219 Reference Standards.docx DOCX document
014500 Quality Control.docx DOCX document
Parking Garage Arch Dwgs Add 1.pdf PDF
A6.2 Signage.pdf PDF
329000 Planting.pdf PDF
283100.pdf PDF
280528-33.pdf PDF
262416.pdf PDF
262200.pdf PDF
260573.pdf PDF
238216.pdf PDF
230593.pdf PDF
230541.pdf PDF
230510.pdf PDF
211200.pdf PDF
088000 General Glazing.pdf PDF
081100 Steel Doors and Frames.pdf PDF
079200 Joint Sealants Spec.pdf PDF
076200 Sheet Metal Flashing _ Trim.pdf PDF
072100 Building Insulation.pdf PDF
019100.docx DOCX document
017800 Final Cleaning_Single Prime.pdf PDF
015816.docx DOCX document
015719.doc DOC document
014219.docx DOCX document
014500.docx DOCX document
013323.docx DOCX document
013200 Construction Progress Documentation_Single Prime.pdf PDF
013150 Project Meetings_Single Prime.pdf PDF
S02 ParkStruct FP Dwg.pdf PDF
Pstruct Dwg 16-20.pdf PDF
Pstruct Dwg 11-15.pdf PDF
Pstruct Dwg 4.pdf PDF
S02 Dwg P1-P2.pdf PDF
S02 Dwg E3-E4.pdf PDF
S02 Geotechnical Report 11-30-15.pdf PDF
EXHIBIT C - Calculation of Self-Performed Work.docx DOCX document
36C24420R0075.docx DOCX document
012700 Cutting and Patching_Single Prime.pdf PDF
2903 312000 Earthwork 02.pdf PDF
280800.pdf PDF
262726.pdf PDF
230800.pdf PDF
221400.pdf PDF
221300.pdf PDF
220523.pdf PDF
210800.pdf PDF
210512.pdf PDF
111200 Parking Control Equipment.pdf PDF
099600 High Performance Coatings.pdf PDF
Show all 50

Y1LZ--693-222 | Parking Structure Solicitation Amendment 2 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit B – Subcontractor Information and Consent Form

Each major subcontractor and/or Teaming Partner must also complete an Exhibit B, “Subcontractor Information and Consent Form” to be considered. Offerors shall have major subcontractors identify on the Exhibit A two references, owners (if they were the Prime) or other Prime contractors they have worked for. References for subcontractors from the proposing offeror are not acceptable. See Exhibit “A” format for information to be provided. Written references for subcontractors may be included and are encouraged; however, subcontractors do not need to send out past performance questionnaires.

A. Multiple Subcontractors may be named for the same discipline but is limited to a maximum of three (3) subcontractors per discipline.

B. Provide information regarding the assessment of liquidated damages on any contracts within the last five years. (Frequency, circumstances, severity of problem, etc.)

C. Offerors are strongly encouraged to include with their proposals information on problems encountered on relevant projects and the specific corrective actions taken to remedy the problems.

D. Other Past Performance Considerations. Information provided, shall be limited to the period starting 5 years prior to the solicitation release date.

a. -Effectiveness of value engineering (VEC) proposals you submitted on prior contracts. (Provide a brief description; impact on cost, schedule, efficiency or quality; contract number; name and phone number of customer benefiting from the VEC).

b. -Professional/Industry awards (Identify award type, date of award and copy of certificate if applicable), Letters of appreciation, recognition or commendations.

c. -Discuss unique skills and accomplishments (Explain unique skills and/or accomplishments and provide supporting information for verification).

Subcontractor and/or Teaming Partner Consent for the Release of Past Performance Information to the Prime Contractor and Reference Information:

Past performance information concerning subcontractors and teaming partners cannot be disclosed to a private party without the subcontractor’s or teaming partner’s consent. Because a prime contractor is a private party, the Government will need that consent before disclosing subcontractor/teaming partner past and present performance information to the prime during exchanges. In an effort to assist the Government in assessing your past performance relevancy we request that the following consent form be completed by the major subcontractors/teaming partners identified in your proposal. The completed consent forms shall be submitted to the offering contractor for submission with the past performance volume.

(Name of Firm) is currently planning on participating as a (subcontractor and or a teaming partner) with (prime contractor or name of entity providing proposal) in responding to the Request for Proposal Number 36C24420R0075 – Construct Parking Structure issued by the Department of Veterans Affairs, WBVAMC, 1111 East End Blvd, Wilkes-Barre, PA 18711.

We understand that the Government is placing increased emphasis on past performance in order to obtain best value in source selections. In order to facilitate the performance confidence assessment process we are signing this consent form to allow you to discuss our past and present performance information with the prime contractor during the source selection process.

(Signature) (Title of Individual with authority to sign for and legally bind the company

Address:

City/State/Zip Code: Date:

Reference List (required):

1. Contract No. And Title

Describe your role (Prime/Sub) and work Performed

Reference POC Name Phone Fax

Email address:

2. Contract No. And Title

Describe your role (Prime/Sub) and work Performed

Reference POC Name Phone Fax

Email address:

3. Contract No. And Title

Describe your role (Prime/Sub) and work Performed

Reference POC Name_ Phone Fax

Email address:

Page 1 of Page 1 of

File details come from the government source that posted it. Updated .