072100 Building Insulation.pdf
PDF 21 KB Posted
- Attached to
- Y1LZ--693-222 | Parking Structure Solicitation Amendment 2 Federal contract opportunity
- Solicitation number
- 36C24420R0075
About this file
This document includes a federal contract solicitation and related building insulation specification. The solicitation is for the construction of a new parking garage at the Wilkes-Barre VA Medical Center in Pennsylvania, with a project budget between $10 million and $20 million. This procurement is set aside for Service-Disabled Veteran-Owned Small Businesses and will use a tiered evaluation process including large businesses. The contractor will be responsible for correct worker classification and wage compliance. Pricing must be in whole dollars.
The specification provides product and installation requirements for building insulation on the parking garage project. It covers insulation for under slabs, cavity walls, concealed areas, and safing. Product data and certifications must be submitted for approval. Extruded polystyrene, polyisocyanurate, and glass fiber insulations are identified for different applications. Installation methods are defined for perimeter insulation, vapor retarders, and general insulation.
View the file
Other files for this federal contract opportunity
Show all 50
Y1LZ--693-222 | Parking Structure Solicitation Amendment 2 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Parking Garage Project Number 693-222 Department of Veterans Affairs Wilkes-Barre, Pennsylvania
072100 - 1
SECTION 072100 BUILDING INSULATION
PART 1 – GENERAL
1.1 RELATED DOCUMENTS
A. Drawings, Division 0 - Bidding and Contract Requirements and Division 1 General Requirements apply to this Section.
1.2 SUMMARY
A. This Section includes the following:
1. Insulation under slabs-on-grade.
2. Cavity wall insulation.
3. Concealed building insulation.
4. Safing insulation.
B. Related Sections: The following Sections contain requirements that relate to this Section:
1. Division 7 Section "Through-Penetration Firestop Systems” for safing insulation.
2. Division 7 Section "EPDM Single-Ply Membrane Roofing” for insulation specified as part of roofing construction.
1.3 SUBMITTALS
A. General: Submit each item in this Article according to the Conditions of the Contract and Division 1 Specification Sections.
B. Product Data for each type of insulation product specified.
C. Product test reports from and based on tests performed by a qualified independent testing agency evidencing compliance of insulation products with specified requirements including those for thermal resistance, fire-test-response characteristics, water-vapor transmission, water absorption, and other properties, based on comprehensive testing of current products.
D. Research or evaluation reports of the model code organization acceptable to authorities having jurisdiction that evidence compliance of foam-plastic insulations with building code in effect for Project.
1.4 QUALITY ASSURANCE
072100 - 2
A. Single-Source Responsibility for Insulation Products: Obtain each type of building insulation from a single source with resources to provide products complying with requirements indicated without delaying the Work.
B. Fire-Test-Response Characteristics: Provide insulation and related materials with the fire-test-response characteristics indicated on Drawings or specified elsewhere in this Section as determined by testing identical products per test method indicated below by UL or another testing and inspecting agency acceptable to authorities having jurisdiction. Identify materials with appropriate markings of applicable testing and inspecting agency.
1. Surface-Burning Characteristics: ASTM E 84.
2. Fire-Resistance Ratings: ASTM E 119.
3. Combustion Characteristics: ASTM E 136.
1.5 DELIVERY, STORAGE, AND HANDLING
A. Protect insulation materials from physical damage and from deterioration by moisture, soiling, and other sources. Store inside and in a dry location. Comply with manufacturer's written instructions for handling, storing, and protecting during installation.
B. Protect plastic insulation as follows:
1. Do not expose to sunlight, except to extent necessary for period of installation and concealment.
2. Protect against ignition at all times. Do not deliver plastic insulating materials to Project site before installation time.
3. Complete installation and concealment of plastic materials as rapidly as possible in each area of construction.
PART 2 – PRODUCTS
2.1 MANUFACTURERS
A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering insulation products that may be incorporated in the work include, but are not limited to, the following:
1. Extruded-Polystyrene Board Insulation: (Cavity Wall)
a. Amoco Foam Products Company.
b. Dow Chemical Co.
c. UC Industries, Inc.; Owens-Corning Co.
2. Polyisocyanurate Board Insulation: (Roof Insulation)
a. Johns Manville
b. NRG Barriers, Inc.
072100 - 3
3. Glass-Fiber Insulation:
a. CertainTeed Corporation.
b. Knauf Fiber Glass GmbH.
c. Owens-Corning Fiberglas Corporation.
d. Schuller International, Inc.
2.2 INSULATING MATERIALS
A. General: Provide insulating materials that comply with requirements and with referenced standards.
B. Extruded-Polystyrene Board Insulation: Rigid, cellular polystyrene thermal insulation formed from polystyrene base resin by an extrusion process using hydrochlorofluorocarbons as blowing agent to comply with ASTM C 578 for type and with other requirements indicated below:
1. Type IV, 1.60-lb/cu. ft. minimum density, unless otherwise indicated.
2. Surface-Burning Characteristics: Maximum flame-spread and smoke-developed indices of 75 and 450, respectively.
3. Recycled Content: Not less than 50 percent blend of postconsumer and recovered polystyrene resins.
C. Polyisocyanurate Board Insulation: Rigid, cellular polyisocyanurate thermal insulation with core formed by using hydrochlorofluorocarbons as blowing agent and faced on both sides with aluminum foil to comply with referenced standards and with other requirements indicated below:
1. Federal Standard: FS HH-I-1972/1, Class 1 (nonreinforced core) or 2 (reinforced core).
2. ASTM Standard: ASTM C 1289, Type I, Class 1 or 2.
3. Surface-Burning Characteristics: Maximum flame-spread and smoke-developed indices of 75 and 450, respectively, based on tests performed on unfaced core on thicknesses up to 4 inches.
4. Thermal Resistivity: 7.2 deg F x h x sq. ft./Btu x in. at 75 deg F.
D. Unfaced, Flexible Glass-Fiber Sound Attenuation Insulation combining glass fibers with thermosetting resin binders to comply with ASTM C 665, Type I; or with ASTM E 136, Type I.
2.3 SAFING INSULATION AND ACCESSORIES
A. Slag-Wool-Fiber Board Safing Insulation: Semirigid boards designed for use as fire stop at openings between edge of slab and exterior wall panels, produced by combining slag-wool fibers with thermosetting resin binders to comply with ASTM C612, Type IA and IB; nominal density of 4 lb/cu. Ft.; passing ASTM E 136 for combustion characteristics; thermal resistivity of 4 deg F x h x sq. ft./BTU x in. at 75 deg F.
072100 - 4
B. Caulking Compound: Material approved by manufacturer of safing insulation for sealing joint between foil backing of safing insulation and edge of concrete floor slab against penetration of smoke.
C. Safing Clips: Galvanized steel safing clips approved by manufacturer of saving insulation for holding safing insulation in place.
2.4 VAPOR RETARDERS
A. Polyethylene Vapor Retarder: ASTM D 4397, Class A, 10 mils thick, with maximum permeance rating of 0.13 perm.
B. Vapor-Retarder Tape: Pressure-sensitive tape of type recommended by vapor retarder manufacturer for sealing joints and penetrations in vapor retarder.
C. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, the following:
1. Reinforced-Polyethylene Vapor Retarders:
a. DURA-SKRIM 6WW; Raven Industries, Inc.
b. Griffolyn T-65; Reef Industries, Inc., Griffolyn Div.
2.5 AUXILIARY INSULATING MATERIALS
A. Adhesive for Bonding Insulation: Product with demonstrated capability to bond insulation securely to substrates indicated without damaging insulation and substrates.
2.6 INSULATION FASTENERS
A. Adhesively Attached, Spindle-Type Anchors: Plate welded to projecting spindle;
capable of holding insulation, of thickness indicated, securely in position indicated with self-locking washer in place; and complying with the following requirements:
1. Plate: Perforated galvanized carbon-steel sheet, 0.030 inch thick by 2 inches square.
2. Spindle: Copper-coated low carbon steel, fully annealed, 0.105 inches in diameter, length to suit depth of insulation indicated.
B. Insulation-Retaining Washers: Self-locking washers formed from 0.016-inch- thick galvanized steel sheet, with beveled edge for increased stiffness, sized as required to hold insulation securely in place, but not less than 1-1/2 inches square or in diameter.
1. Where spindles will be exposed to human contact after installation, protect ends with capped self-locking washers incorporating a spring steel insert to ensure permanent retention of cap.
072100 - 5
C. Anchor Adhesive: Product with demonstrated capability to bond insulation anchors securely to substrates indicated without damaging insulation, fasteners, and substrates.
D. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, the following:
1. Adhesively Attached, Spindle-Type Anchors:
a. TACTOO Insul-Hangers; AGM Industries, Inc.
b. Spindle Type Gemco Hangers; Gemco.
2. Insulation-Retaining Washers:
a. RC150; AGM Industries, Inc.
b. SC150; AGM Industries, Inc.
c. Dome-Cap; Gemco.
d. R-150; Gemco.
e. S-150; Gemco.
3. Anchor Adhesives:
a. TACTOO Adhesive; AGM Industries, Inc.
b. Tuff Bond Hanger Adhesive; Gemco.
PART 3 – EXECUTION
3.1 EXAMINATION
A. Examine substrates and conditions, with Installer present, for compliance with requirements of Sections in which substrates and related work are specified and to determine if other conditions affecting performance of insulation are satisfactory. Do not proceed with installation until unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Clean substrates of substances harmful to insulations or vapor retarders, including removing projections capable of puncturing vapor retarders or that interfere with insulation attachment.
3.3 INSTALLATION, GENERAL
A. Comply with insulation manufacturer's written instructions applicable to products and application indicated.
B. Install insulation that is undamaged, dry, unsoiled, and has not been exposed at any time to ice and snow.
072100 - 6
C. Extend insulation in thickness indicated to envelop entire area to be insulated. Cut and fit tightly around obstructions and fill voids with insulation. Remove projections that interfere with placement.
D. Apply single layer of insulation to produce thickness indicated, unless multiple layers are otherwise shown or required to make up total thickness.
3.4 INSTALLATION OF PERIMETER AND UNDER-SLAB INSULATION
A. On vertical surfaces, set units in adhesive applied according to manufacturer's written instructions. Use adhesive recommended by insulation manufacturer.
B. Protect below-grade insulation on vertical surfaces from damage during backfilling by applying protection board. Set in adhesive according to written instructions of insulation manufacturer.
3.5 NOT USED
3.6 INSTALLATION OF GENERAL BUILDING INSULATION
A. Apply insulation units to substrates by method indicated, complying with manufacturer's written instructions. If no specific method is indicated, bond units to substrate with adhesive or use mechanical anchorage to provide permanent placement and support of units.
B. Seal joints between closed-cell (nonbreathing) insulation units by applying adhesive, mastic, or sealant to edges of each unit to form a tight seal as units are shoved into place. Fill voids in completed installation with adhesive, mastic, or sealant as recommended by insulation manufacturer.
C. Set vapor-retarder-faced units with vapor retarder to warm side of construction, unless otherwise indicated. Do not obstruct ventilation spaces, except for firestopping.
1. Tape joints and ruptures in vapor retarder, and seal each continuous area of insulation to surrounding construction to ensure airtight installation.
D. Set reflective, foil-faced units with not less than 0.75-inch air space in front of foil as indicated.
E. Install mineral-fiber blankets in cavities formed by framing members according to the following requirements:
1. Use blanket widths and lengths that fill cavities formed by framing members.
Where more than one length is required to fill cavity, provide lengths that will produce a snug fit between ends.
2. Place blankets in cavities formed by framing members to produce a friction fit between edges of insulation and adjoining framing members.
072100 - 7
3.7 NOT USED
3.8 INSTALLATION OF VAPOR RETARDERS
A. General: Extend vapor retarder to extremities of areas to be protected from vapor transmission. Secure in place with adhesives or other anchorage system as indicated. Extend vapor retarder to cover miscellaneous voids in insulated substrates, including those filled with loose-fiber insulation.
B. Seal vertical joints in vapor retarders over framing by lapping not less than 2 wall studs. Fasten vapor retarders to framing at top, end, and bottom edges; at perimeter of wall openings; and at lap joints. Space fasteners 16 inches o.c.
C. Seal overlapping joints in vapor retarders with adhesives or vapor-retarder tape according to vapor retarder manufacturer's instructions. Seal butt joints and fastener penetrations with vapor-retarder tape. Locate all joints over framing members or other solid substrates.
D. Firmly attach vapor retarders to substrates with mechanical fasteners or adhesives as recommended by vapor retarder manufacturer.
E. Seal joints caused by pipes, conduits, electrical boxes, and similar items penetrating vapor retarders with vapor-retarder tape to create an airtight seal between penetrating objects and vapor retarder.
F. Repair any tears or punctures in vapor retarders immediately before concealment by other work. Cover with vapor-retarder tape or another layer of vapor retarder.
3.9 PROTECTION
A. General: Protect installed insulation and vapor retarders from damage due to harmful weather exposures, physical abuse, and other causes. Provide temporary coverings or enclosures where insulation is subject to abuse and cannot be concealed and protected by permanent construction immediately after installation.
END OF SECTION 072100