Exhibit_B_-_PRIME-SUB_FORM_for_Contractors_-_26-B-29IF.xls
XLS spreadsheet 38 KB Posted
- Solicitation number
- 26-B-29IF
- Issued by
- Volusia County, Florida
About this file
This is a Prime/Subcontractor Form (Exhibit B) for ITB No. 26-B-29IF, Contract No. C-2063, issued by Volusia County, Florida for the CDBG-CV Seville Village Improvement Association Pavilion Construction project. The form requires bidders to list all proposed subcontractors and specify the dollar value and percentage of work each contractor will perform. Anticipated subcontractor disciplines include demolition, excavation, concrete, timber frame/carpentry, landscaping, surveying, materials supplier/pavilion kit vendor, and equipment rental/crane services. Prime contractors have the option to self-perform work, in which case they must note "self performing" and submit $0.00 for that line item. Any changes to subcontractors during project completion require prior approval from the County Project Manager, and the County reserves the right to seek clarification on subcontractors without allowing changes to the total base bid price.
Bidders must complete all green-shaded cells indicating dollar values for each prime and subcontractor, with all other cells automatically calculated. The total of all work percentages must equal 100 percent as displayed in the grey cell. The total bid amount listed on this form must match the Total Bid Price on the Bid Form, inclusive of any performance or payment bonds. Failure to complete and return this form may result in a non-responsive bid. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference as outlined in the solicitation documents.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2063 | ITB No. 26-B-29IF | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form.
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor |
| $ - 0 | 0.00% | ||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | |||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor |
| Demolition | $ - 0 | 0.00% | |
| Excavation | $ - 0 | 0.00% | |
| Concrete | $ - 0 | 0.00% | |
| Timber Frame/Carpentry | $ - 0 | 0.00% | |
| Landscaping | $ - 0 | 0.00% | |
| Surveying | $ - 0 | 0.00% | |
| Materials Supplier/Pavilion Kit Vendor | $ - 0 | 0.00% | |
| Equipment Rental/Crane | $ - 0 | 0.00% | |
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .