Exhibit_B_-_PRIME-SUB_FORM_25-B-70IF.xls
XLS spreadsheet 38 KB Posted
- Attached to
- Hurricane Nicole Seawall Extensions and Repairs for 14th, 15th, and 29th Avenues in New Smyrna Beach
- Solicitation number
- 25-B-70IF
- Issued by
- Volusia County, Florida
About this file
This is a Prime/Subcontractor Form (Exhibit B) for ITB No. 25-B-70IF issued by Volusia County, Florida, related to the Hurricane Nicole Seawall Extensions and Repairs project covering three work sites at 14th Avenue, 15th Avenue, and 29th Avenue in New Smyrna Beach. The project addresses storm surge erosion damage to seawalls and dunes caused by Hurricane Nicole and includes seawall extension, backfill operations, and restoration of public beach access points across the three locations. Bidders are required to submit this form identifying all proposed subcontractors and must complete it to avoid bid rejection.
The form requires bidders to allocate the total bid price across anticipated project disciplines including demolition, excavation and sitework, seawall panel installation, helical anchor installation, backfill and grading, concrete work, testing services, and surveying. Prime contractors may self-perform work or utilize subcontractors, with each discipline assigned a specific dollar value and corresponding percentage of work. The form is used to determine local preference eligibility in accordance with Section 2.8(D) of the solicitation. All monetary values and percentages must be completed in designated green cells, with the total across all disciplines equaling 100 percent. The prime contractor remains responsible for ensuring all subcontractors maintain appropriate licensing, and any subcontractor changes during project execution require prior approval from the County Project Manager. No changes to total base bid pricing are permitted if subcontractor modifications occur.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2024 | ITB No. 25-B-70IF | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Exhibit G - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor |
| $ - 0 | 0.00% | ||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | |||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor |
| Demolition | $ - 0 | 0.00% | |
| Excavation and Sitework | $ - 0 | 0.00% | |
| Seawall Panel Installation | $ - 0 | 0.00% | |
| Helical Anchor Installation | $ - 0 | 0.00% | |
| Backfill and Grading | $ - 0 | 0.00% | |
| Concrete | $ - 0 | 0.00% | |
| Testing (Concrete & Compaction) | $ - 0 | 0.00% | |
| Surveying | $ - 0 | 0.00% | |
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |