Exhibit B - Construction Drawings.pdf
PDF 2 MB Posted
- Attached to
- CONSTRUCTION HVAC UNIT (PHARMACY DEPARTMENT)
- Solicitation number
- ARFQ 0512 WEH2600000003 3
- Issued by
- Mingo County, West Virginia
About this file
This is a set of construction drawings and specifications for HVAC upgrades to the pharmacy department at Welch Community Hospital in Welch, West Virginia, prepared by The Thrasher Group, Inc. The project involves demolition of existing HVAC components and installation of a new rooftop unit (RTU-1), ductwork, controls, and related mechanical systems for the hospital pharmacy and compounding areas totaling 135 square feet. The scope includes supply and return ductwork modifications, installation of new ceiling diffusers with HEPA filters in the pharmacy and ante-rooms, removal and replacement of pneumatic controls with direct digital controls (DDC), installation of temperature and humidity sensors, and a new control panel. The contractor must coordinate work with ongoing hospital operations, maintain infection control barriers, firestop all fire barrier penetrations per UL specifications, and verify existing conditions prior to commencing work. Construction documents are dated July 1, 2025, and reference the 2018 International Building Code, 2021 NFPA 101 Life Safety Code, 2020 NFPA 70 National Electric Code, and West Virginia State Building Code adopted August 1, 2022.
The rooftop unit specified is an AAON model 550 with 1.75 tons of cooling capacity, 1,478 CFM supply airflow, and approximately 100 MBH total heating capacity, configured with an enthalpy economizer, power exhauster, hot gas reheat coil, and BACnet IP controls. The new electrical branch circuit from existing panel PD5 to the RTU will be approximately 100 feet in length and installed in the first-floor ceiling space. Mechanical work includes removal of existing ductwork sections, caps, and capping of remaining ducts with airtight seals. The contractor must provide all materials, labor, and equipment for complete HVAC system installation; coordinate diffuser and grille locations with architectural and lighting plans; install 1-inch ductliner in the first 15 feet of return air ducts; and ground all ducts across flexible connections. The contractor is also responsible for verifying roof loading capacity and determining necessary structural reinforcements with a registered professional structural engineer before unit installation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WV-43 WV-36.pdf | ||
| DoHS Federal Funds Addendum.pdf | ||
| WV75 - Construction Bid Submission Review.pdf | ||
| Exhibit A Pricing Page HVAC.docx | DOCX document | |
| Bid Bond Instructions (1).pdf | ||
| WV72 Drug Free Coversheet (1).pdf | ||
| Maintenance Bond.pdf | ||
| TCA.pdf | ||
| WV HIPAA BAA.pdf | ||
| DoHS PAffidavit.pdf | ||
| Specifications.docx | DOCX document | |
| BondLaborMat (1).pdf | ||
| Addendum 1.pdf | ||
| AIA Documents.pdf | ||
| WV73 Drug Free Affidavit (1).pdf | ||
| Bid Bond.pdf | ||
| Pre-bid sign in sheet.pdf | ||
| BondPerform (1).pdf | ||
| Final_ARFQ_0512_WEH2600000003_1_WV_ARFQ_FORM.PDF |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. THE SCOPE OF THE WORK IS GENERALLY LIMITED TO THE AREAS SHOWN ON
THESE PLANS. WORK NECESSARY TO RUN ELECTRICAL SERVICE TO EXISTING
PANELS OR EXTEND OR REROUTE OTHER UTILITY LINES IS ALSO INCLUDED.
2. VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO COMMENCEMENT
OF ANY ON SITE ACTIVITIES.
3. PATCH EXISTING WALLS WHERE DEMOLITION OR OTHER CUTTING OF WALL
SURFACES IS REQUIRED TO MATCH EXISTING CONSTRUCTION AND FINISHES,
INCLUDING INSULATION MATERIALS.
4. THE OTHER AREAS OF THE BUILDING WILL REMAIN IN OPERATION FOR THE
DURATION OF THE CONSTRUCTION CONTRACT. COOPERATION AND
CONSIDERATION BY THE CONTRACTOR AND WORKMEN ON SITE WILL BE
REQUIRED. THE CONTRACTOR SHALL SCHEDULE AND COORDINATE WORK
ACTIVITIES WITH THE OWNER.
5. CONTRACTOR SHALL INSTALL NECESSARY TEMPORARY CONSTRUCTION
BARRIERS AND AIR EQUIPMENT TO SATISFY REQUIRED INFECTION CONTROL AND
RISK ASSESSMENT NEEDS.
6. WHERE CONSTRUCTION (DEMOLITION OR NEW WORK) INVOLVES ANY EXISTING
FIRE BARRIERS, THE CONTRACTOR SHALL FIRESTOP ALL PENETRATIONS TO THE
REQUIRED PERFORMANCE STANDARD OF THE FIRE BARRIER ACCORDING UL
SPECIFICATIONS.
GENERAL NOTES:
C
AD
F
IL
E:
THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPERTY OF THE THRASHER GROUP, INC. REPRODUCTION OF THESE DOCUMENTS IN WHOLE, OR IN PART FOR ANY REASON WITHOUT PRIOR WRITTEN PERMISSION IS STRICTLY PROHIBITED. COPYRIGHT © 2025 THE THRASHER GROUP, INC.
VICINITY MAP
FOR AGENCY REVIEW DATE: _________ BY: ________
FOR BIDDING DATE: _________ BY: ________
FOR CONSTRUCTION DATE: _________ BY: ________
GENERAL WV CODE COMPLIANCES
PROJECT INFORMATION
U
SER
PLO
T D
ATE/TIM
E:
OWNER INFORMATIONPROJECT DATA
PROJECT ARCHITECT: ARCHITECTURE
2018 INTERNATIONAL BUILDING CODE
2018 INTERNATIONAL PLUMBING CODE
2018 INTERNATIONAL MECHANICAL CODE
2021 NFPA 101 - LIFE SAFETY CODE
2020 NFPA 70 - NATIONAL ELECTRIC CODE
2017 ICC A117.1 STANDARD FOR ACCESSIBLE
AND USABLE BUILDINGS AND FACILITIES
ASHRAE 90.1-2013 ENERGY STANDARD FOR
BUILDINGS
WV STATE FIRE CODE - ADOPTED MAY 1, 2024
WV STATE BUILDING CODE - ADOPTED AUG 1, 2022
1000 CORPORATE LANDING
CHARLESTON, WV 25311
MEP
CASEY ARTHUR
ARCHITECT WV #4644
CARTHUR@THETHRASHERGROUP.COM
304.343.7601
PROJECT No.
CLIENT
PROJECT ENGINEER:
KEN SMITH, PE
KESMITH@THETHRASHERGROUP.COM
304.343.7601
DESIGN PROFESSIONAL
MAKILA CARR
MCARR@THETHRASHERGROUP.COM
304.343.7601
7/ 2/
:1
9:
P M
C :\U se rs
\m ca rr\ O ne D riv e
- T hr as he r E ng in ee rin g
G ro up \D oc um en ts
\W el ch H os pi ta l P ha rm ac y
H
VA
C U pg ra de s_
C en tra l_
R
_2
7_ m ca rrL Y5
B2 .rv t
WELCH HOSPITAL PHARMACY HVAC
UPGRADES
CONSTRUCTION DOCUMENTS
JULY 1ST, 2025
WELCH, WV
T60-11490.00
SHEET INDEX
A1.03 DEMOLITION & NEW CONSTRUCTION RCP
ME1.01 LEGEND & SCHEDULE
M2.01 PARTIAL FIRST FLOOR DEMO & NEW WORK &
PARTIAL ROOF PLAN NEW WORK -
MECHANICAL
M5.01 MECHANICAL DETAILS
M5.02 HVAC CONTROLS & PANEL BOARD SCHEDULE
PROJECT LOCATION
WELCH COMMUNITY HOSPITAL
454 MCDOWELL ST
WELCH, WV 24801
304.436.8461
WELCH COMMUNITY HOSPITAL
454 MCDOWELL ST
WELCH, WV 24801
304.436.8461
HVAC RENOVATIONS TO EXISTING HOSPITAL
PHARMACY
IBC CONSTRUCTION TYPE: II-A
IBC OCCUPANCY TYPE: I-2
NFPA OCCUPANCY GROUP: HEALTH CARE
NFPA CONSTRUCTION TYPE: II (222)
FULLY SPRINKLED: YES
FIRE ALARM SYSTEM: YES
TOTAL OCCUPANCY AREA: 135 SF
(MECHANICAL SYSTEM RENOVATIONS ONLY)
07/01/25 CCA
07/01/25 CCA
2'x2' LAY-IN CEILING TILE
REFLECTED CEILING PLAN LEGEND
NOTE: CONTRACTOR TO COORDINATE RCP BETWEEN ARCHITECTURAL AND MEP DRAWINGS
BULK HEAD
WALLS BELOW
NOT IN PROJECT SCOPE
NOT IN PROJECT SCOPE
NOT IN PROJECT SCOPE
NOT IN PROJECT SCOPE
NOT IN PROJECT SCOPE
NOT IN PROJECT SCOPE
DEMOLITION PLAN LEGEND
EXISTING TO REMAIN
EXISTING TO BE DEMOLISHED
EXTENTS TO BE DEMOLISHED
1. BEFORE PROCEEDING WITH THE DEMOLITION AND REMOVAL WORK, THE CONTRACTOR SHALL SECURE ALL NECESSARY PERMITS FOR THE EXECUTION OF THE WORK AND SHALL PAY ALL FEES IN CONNECTION THEREWITH.
THE CONTRACTOR SHALL FURNISH RECEIPT FOR SUCH PERMITS TO THE OWNER.
2. THE CONTRACTOR SHALL CONFORM TO APPLICABLE BUILDING CODES FOR DEMOLITION OF STRUCTURES, SAFETY
OF ADJACENT STRUCTURES, DUST CONTROL, RUNOFF CONTROL AND MATERIAL DISPOSAL.
3. THE CONTRACTOR SHALL CONFORM TO APPLICABLE REGULATORY PROCEDURES WHEN DISCOVERING
HAZARDOUS OR CONTAMINATED MATERIALS.
4. IN AN EMERGENCY AFFECTING THE SAFETY OF LIFE OR PROPERTY, ON OR ADJOINING THE SITE, THE
CONTRACTOR SHALL ACT TO PREVENT SUCH THREATENED LOSS OR INJURY.
5. THE CONTRACTOR SHALL PROVIDE, ERECT AND MAINTAIN TEMPORARY BARRIERS, WARNING LIGHTS AND OTHER PROTECTION AS REQUIRED TO ADEQUATELY PROTECT THE WORK, ADJACENT AREAS AND THE PUBLIC AT ALL
TIMES.
6. PROTECT EXISTING STRUCTURE, FINISHES AND OTHER SUCH ITEMS WHICH ARE INDICATED TO REMAIN.
7. ALL EXISTING EXTERIOR MASONRY WALLS, ROOFING SYSTEMS AND BUILDING SHELL STRUCTURE INCLUDING STRUCTURAL COLUMNS, BEAMS, BAR JOISTS, CROSS BRACING, ROOF DECKING, BEARING WALLS AND CONCRETE
FLOOR SLABS SHALL REMAIN UNLESS OTHERWISE NOTED, TYPICAL.
8. THE CONTRACTOR SHALL REMOVE ALL ABANDONED FURRING, FASTENERS HANGERS, BRACKETS, ANGLES, CLIPS, MISC. TACK STRIPS, TACK BOARDS, HOOKS, SIGNS, SHELVES, RUBBLE AND DEBRIS COMPLETELY; INCLUDING
THOSE ITEMS NOT SPECIFICALLY CALLED OUT ON THE DRAWINGS, TYPICAL.
9. ALL ELEMENTS TO THE DRAWING ARE TO BE VERIFIED IN THE FIELD.
GENERAL DEMOLITION NOTES
SHEET No.
C
AD
F
PROJECT No.
DRAWN:
CHECKED:
DATE:
DATE:
LA
YO
U T
TA
B:
PL
O
T D
AT
E/
TI
M
U
SE
R
P (304) 624-4108
600 WHITE OAKS BLVD.
P.O. BOX 940
BRIDGEPORT, WV 26330
www.thethrashergroup.com
F (304) 624-7831
N O
BY
D
AT
E D
ES
C
R
IP
TI
O
N
THE INFORMATION CONTAINED HEREIN IS
THE SOLE PROPERTY OF THE THRASHER
GROUP, INC. REPRODUCTION OF THESE
DOCUMENTS IN WHOLE, OR IN PART FOR
ANY REASON WITHOUT PRIOR WRITTEN
PERMISSION IS STRICTLY PROHIBITED.
COPYRIGHT © 2025
THE THRASHER GROUP, INC.
7/ 2/
:0
4:
P M
C :\U se rs
\m ca rr\ O ne D riv e
- T hr as he r E ng in ee rin g
G ro up \D oc um en ts
\W el ch H os pi ta l P ha rm ac y
H
VA
C U pg ra de s_
C en tra l_
R
_2
7_ m ca rrL Y5
B2 .rv t
JU
LY
ST
, 2
M
JC
C O
N
ST
R U
C
TI
O N
D O
C U
M
EN
TS
A1.03
D
EM
O
LI
TI
O
N
N
EW
C O
N
ST
R U
C
TI
O N
R C
P
MJC 07/01/25
T60-11490.00
W
EL
C H
H O
SP
IT
AL
P
H
AR
M
AC
Y H
VA
C
U
PG
R
AD
ES
W
EL
C H
, W V
DEMOLITION & NEW
CONSTRUCTION RCP
CCA 07/01/25
W
EL
C H
C O
M M
U N
IT
Y
H O
SP
IT
AL
1/8" = 1'-0"A1.03
1 REFLECTED CEILING PLAN - NEW CONSTRUCTION
CONSTRUCTION NOTES
NOTE # DESCRIPTION
1 INSTALL NEW ARMSTRONG CLEAN ROOM CEILING TILE (FLAT & CLEANABLE TILE
CAULKED TO GRID) AND GRID. INSTALL GASKETED CEILING GRID IN ANTE AND
COMPOUNDING ROOMS.
2 INSTALL NEW CEILING TILE AND GRID AS REQUIRED. MATCH NEW TILE & GRID TO
EXISTING ACT SYTEM.
1/8" = 1'-0"A1.03
2 REFLECTED CEILING PLAN - DEMOLITION
DEMOLITION NOTES
NOTE # DESCRIPTION
1 REMOVE EXISTING CEILING AS REQUIRED BY NEW WORK
SYMBOL LEGEND
DESCRIPTIONSYMBOL
EQUIPMENT SYMBOL - SEE LIST ON DWGS.
RIGID AIR DUCT SYSTEM
FLEXIBLE DUCT
MANUAL CONTROL DAMPER (W/LOCKING DEVICE0
CEILING SUPPLY DIFFUSER
CEILING RETURN OR EXHAUST GRILLE
DUCT SIZE INSIDE DIMENSIONS - 24"W x 10"D
DUCT SIZE - 10" DIAMETER
THERMOSTAT / SENSOR
PLAN NOTE
24”x10”
10ӯ
T S
A
DIFFUSER SYMBOL - SEE SCHEDULE
NECK SIZE
DESIGN CUBIC FEE PER MINUTE OF AIR
QUANITY FOR ROOM OR SPACE
D1 8ӯ
(2)
ABBREVIATIONS
AFF ABOVE FINISHED FLOOR
BF BELOW FLOOR
BCU BLOWER COIL UNIT
CFM CUBIC FEET PER MINUTE
COP COEFFICIENT OF PERFORMANCE
CU CONDENSING UNIT
DN DOWN
DB DRY BULB
DU DUCTLESS UNIT
EA EXHAUST AIR
EAT ENTER AIR TEMPERATURE
EC ELECTRICAL CONTRACTOR
ECH ELECTRIC CEILING HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
ESP EXTERIOR STATIC PRESSURE
EUH ELECTRIC UNIT HEATER
EWH ELECTRIC WALL HEATER
FD FIRE DAMPER
FPD FEET PER MINUTE
GC GENERAL CONTRACTOR
GUH GAS UNIT HEATER
KW KILOWATTS
HP HORSEPOWER
L LOUVER
LAT LEAVING AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MH MOUNTING HEIGHT
MBH THOUSAND BTU/HR
MOD MOTORIZED DAMPER
NIC NOT INCLUDED IN CONTRACT
NTS NOT TO SCALE
O.A. OUTSIDE AIR
PC PLUMBING CONTRACTOR
PD PRESSURE DROP
RA RETURN AIR
RH RELATIVE HUMIDITY
RPM REVOLUTIONS PER MINUTE
RTU ROOFTOP UNIT
SA SUPPLY AIR
SD SMOKE DETECTOR
SF SUPPLY FAN
STR STARTER (MOTOR)
TS TIP SPEED
TSP TOTAL STATIC PRESSURE
(TYP) TYPICAL
TZ TRANSFORMER
UNO UNLESS NOTED OTHERWISE
W/ WITH
WH WATER HEATER
WB WET BULB
W/O WITHOUT
WP WEATHER PROOF
GENERAL MECHANICAL NOTES:
1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO
INSTALL COMPLETE AND OPERABLE HVAC SYSTEM AS INDICATED ON THE DRAWINGS,
AS SPECIFIED AND AS REQUIRED BY CODE.
2. CERTAIN ITEMS SUCH AS RISES AND DROPS IN DUCTWORK, ACCESS DOORS, VOLUME
DAMPERS, ETC., ARE INDICATED FOR CLARITY IN CERTAIN AREAS. THIS DOES NOT
RELIEVE THE CONTRACTOR OF PROVIDING THESE ITEMS NOT SHOWN IN OTHER
AREAS AS REQUIRED FOR A COMPLETE INSTALLATION.
3. UNLESS NOTED OTHERWISE, LOCATE ALL ROOM THERMOSTATS 5'-0" ABOVE FINISH
FLOOR.
4. ALL DUCTWORK SHALL CLEAR DOORS AND WINDOWS.
5. ALL DUCTWORK DIMENSIONS, AS SHOWN ON DRAWINGS, ARE INTERNAL CLEAR
DIMENSIONS. DUCT SIZE SHALL BE INCREASED IN SIZE TO COMPENSATE FOR
INTERNAL LININGS.
6. COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATIONS WITH ARCHITECTURAL
PLANS, LIGHTING, AND OTHER ITEMS LOCATED IN CEILING.
7. LOCATE ALL MECHANICAL EQUIPMENT FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS
PANELS, CONTROLS, AND VALVING.
8. PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK SYSTEMS CONNECTED TO AIR
HANDLING UNITS, FANS, AND OTHER EQUIPMENT THAT REQUIRE VIBRATION
ISOLATION. FLEXIBLE CONNECTIONS SHALL BE PROVIDED AT THE POINT OF
CONNECTION UNLESS NOTED OTHERWISE.
9. RUNS OF FLEXIBLE DUCTWORK SHALL NOT EXCEED 5 FEET.
10. ALL DUCTS SHALL BE GROUNDED ACROSS FLEXIBLE CONNECTIONS WITH FLEXIBLE
COPPER GROUNDING STRAPS.
11. TURNING VANES SHALL BE INSTALLED IN ALL RECTANGULAR DUCT ELBOWS THAT
EXCEED 45° CHANGE IN DIRECTION.
12. INSTALL 1" DUCTLINER IN FIRST 15' OF ALL RETURN AIR DUCTS.
13. SMOKE DETECTORS SHALL BE FURNISHED AND WIRED BY THE ELECTRICAL
CONTRACTOR. THE MECHANICAL CONTRACTOR SHALL INSTALL THE SMOKE
DETECTOR IN THE DUCTWORK.
14. CONTROL RELAYS SHALL BE WIRED BY THE ELECTRICAL CONTRACTOR. THE
MECHANICAL CONTRACTOR SHALL FURNISH AND INSTALL THE RELAY IN THE
EQUIPMENT.
1. COORDINATE HVAC DEMOLITION WITH OTHER TRADES AND GENERAL CONTRACTOR.
DO NOT DEMOLISH EQUIPMENT OR COMPONENTS WITHOUT APPROVAL.
2. UNDER NO CIRCUMSTANCE SHALL DEMOLITION CAUSE DAMAGE OR REMOVAL IN
WHOLE OR IN PART OF ANY STRUCTURAL MEMBER WITHOUT EXPRESS APPROVAL OF
THE GENERAL CONTRACTOR.
3. CAP AND PROTECT ANY EXPOSED EQUIPMENT, DUCT, PIPE OR ELECTRICAL CABLE /
CONDUIT THAT RESULTS FROM DEMOLITION. UNDER NO CIRCUMSTANCE WILL
DEMOLITION RESULT IN THE PERMANENT EXPOSURE OF ANY CHARGED OR LIVE
COMPONENT OR ANY EQUIPMENT TO BE RE-USED.
4. PROTECT ANY EQUIPMENT, SYSTEM, OR COMPONENT THEREOF THAT SHALL BE RE-
USED.
5. COORDINATE DISPOSAL OF ALL REMOVED ITEMS WITH THE GENERAL CONTRACTOR.
TURN OVER ANY COMPONENTS TO THE OWNER AS DESIGNATED IN CLEAN
CONDITION, WITHOUT DAMAGE, AND WITH OPENING SEALED. FURNISH RECEIPTS OF
PROPER DISPOSAL OF ALL ITEMS REMOVED TO THE GENERAL CONTRACTOR UPON
REQUEST. RECEIPTS SHALL INDICATE DISPOSAL IN ACCORDANCE WITH ALL LOCAL,
STATE AND FEDERAL REGULATIONS.
DEMOLITION NOTES
RTU-1 PHARMACY LAB AAON 550 1.75 1478 0.5 1.0 200 36.3 79.1 67.2 28.0 17.4 VARIABLE 2.3 43.3 100.4 SCR 10.0 550 0.25 0.08 24 25 859HEPA 460/3/601.00 854RQA002AA3HBA0AA01N0
LOCATION RM #UNIT
ROOFTOP UNIT SCHEDULE
MFG. MODEL #
SUPPLY
ESP (IN.
RPM BHP HP CFM % WB(°F)DB (°F) TOTAL MBH
SENSIBLE
STAGES TONS DB (°F) DB(°F)
STAGES OR
KW ESP (IN. WC)CFM BHP HP RPM PRIMARY MCA MOCP VOLT/PH/HZ
UNIT WEIGHTAIR
CFM
SUPPLY FAN
WC)
OUTSIDE AIR VOLUME
EAT
MBH
REFRIGERANT COIL
EAT LAT
SCR
ELECTRIC HEATER POWER EXHAUSTER FILTERS UNIT ELECTRICAL
(LB)
NOTES:
1. UNIT SHALL BE CONFIGURED FOR HORIZONTAL SUPPLY / RETURN WITH ENTHALPY ECONOMIZER, BAROMETRIC RELIEF, AND POWER EXHAUST.
2. DRAIN PAN SHALL BE TYPE 304 STAINLESS STEEL OR PLASTIC SLOPED IN TWO PLANES FOR COMPLETE DRAINAGE.
3. ALL MOTORS SHALL BE PREMIUM EFFICIENT. UNIT WEIGHT SHALL INCLUDE CURB, POWER EXHAUSTER AND ALL OTHER UNIT COMPONENTS.
4. POWER EXHAUSTERS RUN INTERMITTENTLY AND MODULATE TO RELIEVE EXCESS BUILDING PRESSURE. PROVIDE AIR PRESSURE CONTROL FOR POWER EXHAUSTER.
5. PROVIDE CURB HEIGHT TO MAKE UNIT OUTDOOR AIR INTAKE SET A MINIMUM OF 30" ABOVE ROOF. CONTRACTOR SHALL SHIM AND LEVEL UNIT ON CURB AS REQUIRED FOR A PLUM AND LEVEL UNIT INSTALLATION.
6. CONDENSING SECTION FOR ROOFTOP UNIT SHALL BE SELECTED BASED ON 95 °F.
7. EXTERNAL STATIC FOR SUPPLY FAN INCLUDES SUPPLY DUCT AND RETURN DUCT. SUPPLY FAN TOTAL STATIC SHALL INCLUDE LOADED FILTERS, COILS, UNIT CASING, AND EXTERNAL STATIC.
8. EQUIPMENT MANUFACTURERS SHALL PROVIDE UNIT WITH DISCONNECTS, MOTOR STARTERS, AND CONTROL TRANSFORMER.
9. FANS SHALL OPERATE IN STABLE NON-SURGE FASHION THROUGH FAN CURVE FROM POINT OF CLEAN FILTER TO POINT OF FILTER CHANGE OUT.
10. FURNISH UNIT WITH LINEBACKER EAC-8000 PHASE PROTECTOR OR EQUAL FACTORY INSTALLED.
11. PROVIDE HOT GAS REHEAT COIL WITH MODULATING CONTROL.
12. COOLING COIL SELECTION SHALL BE BASED ON A 50° TO 52°F LAT DB REQUIRED FOR DEHUMIDIFICATION.
13. AAON ROOFTOP UNIT SUPPLIER- CONTACT CHRIS HESS OF TOBEY KARG PHONE: (412)-736-5582.
14. PROVIDE NON FUSED DISCONNECT, UNIT MOUNTED GFI RECEPTACLE, RECEPTACLE SHALL BE FACTORY WIRED AND POWERED.
15. RTU MFG SHALL FURNISH AND INSTALL PROVISIONS ON ALL HVAC UNITS TO ALLOW FOR TESTING AND BALANCING OF EQUIPMENT BUT NOT LIMITED TO MULTI-SPEED MOTORS, DAMPERS FOR AIRFLOW ADJUSTMENT, ETC.
16. PROVIDE WITH 2" PLEATED MERV 8 FILTERS AND CLOGGED FILTER SWITCH.
17. EXTERNAL STATIC FOR POWERED EXHAUSTER INCLUDES RETURN DUCTWORK AND GRILLES. POWER EXHAUSTER TOTAL STATIC SHALL INCLUDE ALL LOSSES INCLUDING LOSSES WITHIN RTU.
18. CURB SHALL BE FACTORY CONSTRUCTED.
19. ALL HEATING COILS SHALL BE MOUNTED IN THE REHEAT POSITION.
20. PROVIDE HAIL GUARD PROTECTION.
21. PROVIDE HINGED FILTER DOOR AND TOOL LESS ACCESS PANELS.
22. UNIT CASING SHALL BE DOUBLE WALL WITH R-13 FOAM INSULATION.
23. PROVIDE WITH BACNET IP CONTROLLER, OUTSIDE AIR TEMP/HUMIDITY SENSOR, SUPPLY AIR TEMP SENSOR, DIGITAL SPACE TEMP/HUMIDITY SENSOR, BUILDING PRESSURE SENSOR, PROOF OF AIR FLOW, MODULATING
HOT GAS REHEAT MODULE, AND HOT GAS REHEAT VALVE.
DESCRIPTIONUSEMODEL NO.MANUFACTURERMARK NOTES
A. SIZE OF NECK FOR ABOVE ARE SHOWN ON PLAN.
GENERAL NOTES:
3. WHITE FINISH
2. ALUMINUM
1. STEEL
NOTES:
B. SIZE OF GRILLE FOR ABOVE ARE SHOWN ON PLAN.
D1 PRICE LFDC SUPPLY 1,3
24"x24" FLUSH PERFORATED FACE CEILING DIFFUSER WITH
ROOM SIDE REPLACEABLE HEPA FILTER, ROOM SIDE
ADJUSTABLE DAMPER, AND FRAME FOR LAY-IN CEILING.
DIFFUSER SCHEDULE GENERAL ELECTRICAL NOTES
1. ALL ELECTRICAL WORK SHALL BE CONSTRUCTED IN ACCORDANCE WITH
THE NEC.
2. ALL INTERIOR WIRING SHALL BE IN EMT TYPE CONDUIT ACCORDING TO THE
NEC.
3. ALL EXTERIOR WIRING SHALL BE IN RMC TYPE CONDUIT WITH LMFC TO
EQUIPMENT DISCONNECT ACCORDING TO THE NEC.
4. ALL WORK SHALL COMPLY WITH NFPA 70.
5. ELECTRICAL BRANCH CIRCUITS SHALL NOT SHARE A COMMON NEUTRAL.
6. SIZE ALL FUSES, CONDUCTORS AND BREAKERS WITH EQUIPMENT
MANUFACTURER.
7. MECHANICAL EQUIPMENT CONVENIENCE OUTLET SHALL BE GFCI
PROTECTED.
8. EXISTING PANEL PD5 (RIGHT) IS LOCATED IN THE SECOND FLOOR
ELECTRICAL ROOM.
9. NEW RTU-1 BRANCH CIRCUIT BREAKER MANUFACTURER AND TYPE SHALL
CORRESPOND WITH THE EXISTING PANEL PD5 (RIGHT SIDE)
MANUFACTURER AND TYPE.
10. NEW BRANCH CIRCUIT FROM PANEL PD5 TO NEW RTU-1 SHALL BE
INSTALLED IN THE FIRST FLOOR CEILING SPACE.
11. NEW RTU-1 BRANCH CIRCUIT WILL BE APPROXIMATELY 100' IN LENGTH
FROM THE EXISTING PANEL PD5 TO THE NEW RTU-1. CONTRACTOR SHALL
VERIFY PRIOR TO CONSTRUCTION.
SHEET No.
C
AD
F
CHECKED:
DATE:
DATE:
LA
YO
U T
TA
B:
PL
O
T D
AT
E/
TI
P.O. BOX 940
BRIDGEPORT, WV 26330
www.thethrashergroup.com
F (304) 624-7831
N O
BY
D
AT
E D
ES
C
R
IP
TI
O
N
THE INFORMATION CONTAINED HEREIN IS
THE SOLE PROPERTY OF THE THRASHER
GROUP, INC. REPRODUCTION OF THESE
DOCUMENTS IN WHOLE, OR IN PART FOR
ANY REASON WITHOUT PRIOR WRITTEN
PERMISSION IS STRICTLY PROHIBITED.
COPYRIGHT © 2024
THE THRASHER GROUP, INC.
6/
/2
9:
:1
AM
C :\R ev itF ile s2
5\
W
EL
C H
H P_
M
EP
_R
_k es m ith
FJ
R
H C
.rv t
JU
LY
, 2
KE
S
C O
N
ST
R U
C
TI
O N
D O
C U
M
EN
TS
ME1.01
LE
G
EN
D
S
C H
ED
U
LE
KES 07/01/2025
T60-11490
W
EL
C H
H O
SP
IT
AL
P
H
AR
M
AC
Y H
VA
C
U
PG
R
AD
ES
W
EL
C H
, W V
LEGEND & SCHEDULE
TTG 07/01/2025
W
EL
C H
C O
M M
U N
IT
Y
H O
SP
IT
AL
12"x12"R1 160
12"x12"R1 160
12"x12"R1 200
"x
12"x10"
8"x10"
T H
S
10"øD1 160 10"øD1 160
10"øD1 200
RTU
12"x10"
14"x10"
11 12
SHEET No.
C
AD
F
CHECKED:
DATE:
DATE:
LA
YO
U T
TA
B:
PL
O
T D
AT
E/
TI
P.O. BOX 940
BRIDGEPORT, WV 26330
www.thethrashergroup.com
F (304) 624-7831
N O
BY
D
AT
E D
ES
C
R
IP
TI
O
N
THE INFORMATION CONTAINED HEREIN IS
THE SOLE PROPERTY OF THE THRASHER
GROUP, INC. REPRODUCTION OF THESE
DOCUMENTS IN WHOLE, OR IN PART FOR
ANY REASON WITHOUT PRIOR WRITTEN
PERMISSION IS STRICTLY PROHIBITED.
COPYRIGHT © 2024
THE THRASHER GROUP, INC.
6/
/2
9:
:0
AM
C :\R ev itF ile s2
5\
W
EL
C H
H P_
M
EP
_R
_k es m ith
FJ
R
H C
.rv t
JU
LY
, 2
KE
S
C O
N
ST
R U
C
TI
O N
D O
C U
M
EN
TS
M2.01
PA
R
TI
AL
F
IR
ST
F
LO
O
R D
EM
O
A N
D N
EW
W
O R
K
PA
R
TI
AL
R O
O F
PL
AN
N
EW
W O
R K
-M
EC
H
AN
IC
AL
KES 07/01/2025
T60-11490
W
EL
C H
H O
SP
IT
AL
P
H
AR
M
AC
Y H
VA
C
U
PG
R
AD
ES
W
EL
C H
, W V
PARTIAL FIRST FLOOR
DEMO AND NEW WORK
& PARTIAL ROOF PLAN
NEW WORK -
MECHANICAL
TTG 07/01/2025
W
EL
C H
C O
M M
U N
IT
Y
H O
SP
IT
AL
1/8" = 1'-0"
PARTIAL FIRST FLOOR DEMO PLAN -
MECHANICAL
1/8" = 1'-0"
PARTIAL FIRST FLOOR NEW WORK
PLAN - MECHANICAL
1/8" = 1'-0"
PARTIAL ROOF NEW WORK PLAN -
MECHANICAL
PARTIAL FIRST FLOOR DEMO PLAN - MECHANICAL KEYNOTES
NOTE # DESCRIPTION
1 REMOVE SECTION OF DUCT SHOWN. CAP END OF DUCT TO REMAIN
AND SEAL AIRTIGHT.
2 REMOVE EXHAUST FAN LOCATED ON TOP OF DUCT.
3 REMOVE SUPPL AIR DIFFUSER AND ASSOCIATED FLEXIBLE DUCT.
4 EXISTING WALL MOUNTED RETURN GRILLE TO REMAIN AND BE
REUSED.
5 EXISTING ROOF DRAIN PIPE TO REMAIN AND BE REUSED.
6 REMOVE EXISTING PNEUMATIC CONTROLS FROM AIR HANDLER.
SEE M5.02 FOR NEW WORK.
7 REMOVE EXISTING HOT WATER VALVE AND PNEUMATIC ACTUATOR.
SEE NEW WORK PLAN.
8 REMOVE SECTION OF DUCT SHOWN. CAP END OF DUCT TO REMAIN
AND SEAL AIRTIGHT. CAP MAIN DUCT AND SEAL AIRTIGHT.
9 EXISTING WALL MOUNTED PRESSURE MONITOR TO REMAIN AND BE
REUSED.
10 WHERE CONSTRUCTION INVOLVES ANY EXISTING FIRE BARRIERS,
THE CONTRACTOR SHALL FIRESTOP ALL PENETRATIONS TO THE
REQUIRED PERFORMANCE STANDARD OF THE FIRE BARRIER
ACCORDING TO UL SPECIFICATIONS.
PARTIAL FIRST FLOOR NEW WORK PLAN - MECHANICAL KEYNOTES
NOTE # DESCRIPTION
1 14" X 10" UP THROUGH ROOF.
2 14" X 10" UP THROUGH ROOF. COORDINATE EXACT LOCATION WITH
ROOF DRIAN PIPIING.
3 PROVIDE NEW DDC CONTROLS FOR EXISING AIR HANDLER. SEE
M5.02.
4 PROVIDE NEW HOT WATER CONTROL VALVE WITH DDC
CONTROLLED ACTUATOR.
5 SPACE TEMPERATURE AND HUMIDITY SENSOR TO EXISTING AIR
HANDLER.
6 TEMPERATURE/HUMIDITY SENSOR TO RTU-1.
7 EXISTING WALL MOUNTED PRESSURE MONITOR.
CALIBRATE/ADJUST AS REQUIRED.
8 EXISTING ROOF DRAIN PIPE.
9 WHERE CONSTRUCTION INVOLVES ANY EXISTING FIRE BARRIERS,
THE CONTRACTOR SHALL FIRESTOP ALL PENETRATIONS TO THE
REQUIRED PERFORMANCE STANDARD OF THE FIRE BARRIER
ACCORDING TO UL SPECIFICATIONS.
10 NEW DDC CONTROL PANEL. COORDINATE EXACT LOCATION WITH
OWNER AND EXISTING EQUIPMENT. PROVIDE POWER FROM
NEAREST 120 VOLT CIRCUIT.
PARTIAL ROOF NEW WORK PLAN - MECHANICAL KEYNOTES
NOTE # DESCRIPTION
1 14" X 10" DOWN TO BELOW.
2 12" X 10" DOWN TO BELOW.
3 EXISTING EXHAUST GOOSENECK.
4 EXISTING PLUMBING VENT.
5 EXISTING ROOF DRAIN.
6 ROOF DUCT SUPPORT, SEE DETAIL (TYPICAL).
7 PRE-FABRICATED DOUBLE WALL RETURN DUCT WITH 2" INSULATION
AND WEATHERPROOF COVER.
8 PRE-FABRICATED DOUBLE WALL SUPPLY DUCT WITH 2" INSULATION
AND WEATHERPROOF COVER.
9 PROVIDE TRANSITION FROM UNIT INLET SIZE TO 14" X 10".
10 PROVIDE TRANSITION FROM UNIT OUTLET SIZE TO 12" X 10".
11 LOCATE UNIT SUCH THAT OUTSIDE AIR INTAKE IS A MINIMUM OF 10
FEET FROM EXHAUST OUTLET AND PLUMBING VENT.
12 CONTRACTOR SHALL VERIFY LOADING OF EXISTING ROOF
STRUCTURE WITH THE NEW ROOFTOP EQUIPMENT AND DETERMINE
THE NECESSARY REINFORCEMENTS WITH A REGISTERED
PROFESSIONAL STRUCTURAL ENGINEER.
NOT TO SCALE
KEY PLAN
APPROXIMATE
LOCATION OF
SECOND FLOOR
ELECTRICAL ROOM
D E F
C
B
A
GG
F
E
D
A
B
C
FLEX DUCT
BELLMOUTH TAKE-OFF
BUCKLEY AIR PRODUCTS
TYPE BM-D OR EQUAL
WITH DAMPER
DUCT MAIN
PLASTIC TIE BAND
CONICAL SPIN-IN FITTING
WITH DAMPER-GENFLEX
MODEL SM-2D OR EQUAL
FABRICATED SQUARE TO
ROUND TAP WITH DAMPER-
AREA OF TAP TO BE
1.5xAREA OF BRANCH
VOLUME DAMPERG
G
NOTES
A
B
C
E
D
G K
F H
J
INSULATED ROOF CURB
ANGLE IRON SUPPORT
EXISTING ROOF INSULATION
ROOFTOP EQUIPMENT
6" THICK LAYER OF FIBERGLASS
INSULATION WITH A MINIMUM DENSITY
OF 5 POUNDS/CUBIC FT.
1/2" THICK GYPSUM BOARD OR
PLYWOOD
EXISTING STRUCTURAL SUPPORTS
EXISTING ROOFING
ROOF CURB
EXISTING ROOF DECK
A
B
C
D
E
F
G
H
K
J
1. PROVIDE 5 # DENSITY INSULATION UNDER UNIT ON TOP OF ROOF AND INSIDE ROOF CURB.
COVER INSULATION WITH 1/2" THICK PLYWOOD OR GYPSUM BOARD AND CAULK BETWEEN
PLYWOOD OR GYPSUM BOARD AND ROOF CURB.
2. ROOF INSULATION SHALL EXTEND UNDER UNIT.
C
B
A B
A
CE
F
D
D
E
F
GALVANIZED STEEL UNISTRUT
SET TIMBER ON WALKWAY PAD
ROOF
DUCT
SECURE DUCT TO UNISTRUT WITH
METAL STRAP WRAPPED OVER DUCT
AND SCREWED TO UNISTRUT
TREATED 6"x6" TIMBER WITH
BOTTOM CORNERS ROUNDED
G
G SECURE UNISTRUT TO 6"X6" WITH
ANGLE BRACKETS AND SCREWS
A
B
C
C D E
D B
PLASTIC OR STAINLESS STEEL TIE BAND
ALL BENDS TO BE LONG RADIUS
HANGER BANDS IN ACCORDANCE WITH FLEX
MANUFACTURERS INSTRUCTIONS
INSULATED FLEXIBLE DUCT (5'-0" MAX. LENGTH)
SQUARE TO ROUND ADAPTER OR ROUND TRANSITION
(WHERE REQ'D.)
A
E
F G
CEILING DIFFUSER OR GRILLE
CEILING
ELEVATION
F G
H SEAL AROUND DIFFUSER AT CEILING PENETRATIONH
NO SCALE
DETAIL-"A"
DUCT
ROOF
ROOF CURB
CORNER SEAMS
FLASHING WITH WELDED
SEAL WITH SILICONE
ON 6" CENTERS AND
RIVETED OR BOLTED
1 1/2" STANDING SEAMA
B
C
D
E
D
E
B
C
A
1 1/2"X 1 1/2"X 1/8" STEEL ANGLE
WITH RIVETED OR BOLTED
ON 6" CENTERS
F
F
G
H
J
K
ROOF CURB
K
J
DUCT
DETAIL-"A"
ROOFH
G
SHEET No.
C
AD
F
CHECKED:
DATE:
DATE:
LA
YO
U T
TA
B:
PL
O
T D
AT
E/
TI
P.O. BOX 940
BRIDGEPORT, WV 26330
www.thethrashergroup.com
F (304) 624-7831
N O
BY
D
AT
E D
ES
C
R
IP
TI
O
N
THE INFORMATION CONTAINED HEREIN IS
THE SOLE PROPERTY OF THE THRASHER
GROUP, INC. REPRODUCTION OF THESE
DOCUMENTS IN WHOLE, OR IN PART FOR
ANY REASON WITHOUT PRIOR WRITTEN
PERMISSION IS STRICTLY PROHIBITED.
COPYRIGHT © 2024
THE THRASHER GROUP, INC.
6/
/2
9:
:1
AM
C :\R ev itF ile s2
5\
W
EL
C H
H P_
M
EP
_R
_k es m ith
FJ
R
H C
.rv t
JU
LY
, 2
KE
S
C O
N
ST
R U
C
TI
O N
D O
C U
M
EN
TS
M5.01
M
EC
H
AN
IC
AL
D
ET
AI
LS
KES 07/01/2025
T60-11490
W
EL
C H
H O
SP
IT
AL
P
H
AR
M
AC
Y H
VA
C
U
PG
R
AD
ES
W
EL
C H
, W V
MECHANICAL DETAILS
TTG 07/01/2025
W
EL
C H
C O
M M
U N
IT
Y
H O
SP
IT
AL
NOT TO SCALE
ALTERNATE METHODS OF FELX DUCT CONNECTIONS
NOT TO SCALE
DETAIL OF ROOFTOP AIR CONDITIONING UNIT
NOT TO SCALE
DETAIL OF DUCT SUPPORT ON ROOF
NOT TO SCALE
INSTALLATION DETAILS FOR FLEXIBLE
DUCTS
NOT TO SCALE
DETAIL OF DUCT THRU ROOF
FLOW DIAGRAM: AIR HANDLER UNIT
H - 3
D - 13
D - 14ACT - 12
T - 18
T - 13
T - 8
V - 1
LLT - 12 T - 22
T - 6 CO2 - 4
S - 5
H - 7 T - 16
OA
RLF
HDW - 15
R - 25
MS - 6
D - 2
DPT- 9
R - 17
T - 2
HDW - 23
H - 6
DA
RA
ACT - 44
SPH (AI)
MAD (AO)
CC LAT (AI)
PH LAT (AI)
OAT (AI)
PH (AO)
MA LLT (BI)
RAT (AI) RA CO2 (AI)
CND OVRFL (BI)
OAH (AI) MAT (AI)
SAF (BO)
SAF (BI)
CMP1 (BO)
SPT (AI)
SPT SP (AI)
RLF DPR (AO)
POINTS LIST: AIR HANDLER UNIT
SYSTEM POINT DESCRIPTION POINTS ALARMS
G R
AP
H
IC
AN
AL
O G
H
AR
D W
AR
E
IN
PU
T (A
I)
BI
N
AR
Y
H
AR
D W
AR
E
IN
PU
T (B
I)
AN
AL
O G
H
AR
D W
AR
E
O U
TP
U
T (A
O
BI
N
AR
Y
H
AR
D W
AR
E
O U
TP
U
T (B
O
SO
FT
W
AR
E
PO
IN
T
(S
FT
H
AR
D W
AR
E
IN
TE
R
LO
C K
(H D
W
W
IR
EL
ES
S (W
LS
N
ET
W O
R K
(N
ET
H
IG
H
A N
AL
O
G L
IM
IT
LO
W
A N
AL
O
G L
IM
IT
BI
N
AR
Y
LA
TC
H D
IA
G
N O
ST
IC
SE
N
SO
R
F
AI
L C
O M
M U
N
IC
AT
IO
N F
AI
L
COIL LEAVING AIR LOW TEMP
CUTOUT ALARM
LLT
X X
COMPRESSOR 1 COMMAND
CMP1
X X
CONDENSATE OVERFLOW
DETECTION LOCAL
CND OVRFL
X X X X
COOLING COIL LEAVING
TEMPERATURE
CC LAT
X X X X X
MIXED AIR DAMPER COMMAND
MAD
X X
MIXED AIR LOW TEMPERATURE
CUTOUT ALARM
MA LLT
X X
MIXED AIR TEMPERATURE LOCAL
MAT
X X X X
OUTDOOR AIR RELATIVE HUMIDITY
LOCAL
OAH
X X
OUTDOOR AIR TEMPERATURE
LOCAL
OAT
X X
PREHEAT LEAVING COIL
TEMPERATURE LOCAL
PH LAT
X X X
PREHEAT OUTPUT COMMAND
PH
X X
RELIEF AIR DAMPER COMMAND
RLF DPR
X X
RETURN AIR CO2 LOCAL
RA CO2
X X X
RETURN AIR TEMPERATURE LOCAL
RAT
X X
SPACE HUMIDITY LOCAL
SPH
X X X
SPACE STATIC PRESSURE LOCAL
SPP
X X X X
SPACE TEMPERATURE LOCAL
SPT
X X X X X
SPACE TEMPERATURE SETPOINT
LOCAL
SPT SP
X X
SUPPLY FAN START STOP
COMMAND
SAF
X X
SUPPLY FAN STATUS
SAF
X X
BAS COMMUNICATION STATE
BAS COM
X X
MAINTENANCE REQUIRED
MNT REQ
X X
MIXED AIR TEMPERATURE LOW
LIMIT SETPOINT
MA LLT STPT
X
OCCUPIED COOLING SETPOINT
OCC CLG STPT
X X
OCCUPIED HEATING SETPOINT
OCC HTG STPT
X X
SUPPLY FAN FAILURE
SF FAIL
X X X
UNOCCUPIED COOLING SETPOINT
UNOCC CLG STPT
X X
UNOCCUPIED HEATING SETPOINT
UNOCC HTG STPT
X X
SHEET No.
C
AD
F
CHECKED:
DATE:
DATE:
LA
YO
U T
TA
B:
PL
O
T D
AT
E/
TI
P.O. BOX 940
BRIDGEPORT, WV 26330
www.thethrashergroup.com
F (304) 624-7831
N O
BY
D
AT
E D
ES
C
R
IP
TI
O
N
THE INFORMATION CONTAINED HEREIN IS
THE SOLE PROPERTY OF THE THRASHER
GROUP, INC. REPRODUCTION OF THESE
DOCUMENTS IN WHOLE, OR IN PART FOR
ANY REASON WITHOUT PRIOR WRITTEN
PERMISSION IS STRICTLY PROHIBITED.
COPYRIGHT © 2024
THE THRASHER GROUP, INC.
6/
/2
9:
:1
AM
C :\R ev itF ile s2
5\
W
EL
C H
H P_
M
EP
_R
_k es m ith
FJ
R
H C
.rv t
JU
LY
, 2
KE
S/
BH
C O
N
ST
R U
C
TI
O N
D O
C U
M
EN
TS
M5.02
H
VA
C C
O N
TR
O
LS
, P
AN
EL
BO
AE
D S
C H
ED
U
LE
KES/BH 07/01/2025
T60-11490
W
EL
C H
H O
SP
IT
AL
P
H
AR
M
AC
Y H
VA
C
U
PG
R
AD
ES
W
EL
C H
, W V
HVAC CONTROLS,
PANELBOAED
SCHEDULE
TTG 07/01/2025
W
EL
C H
C O
M M
U N
IT
Y
H O
SP
IT
AL
| Welch Hospital Pharmacy HVAC Upgrades_CS_250702.pdf |
| Sheets |
| G1.00 - COVER SHEET |
| Welch Hospital Pharmacy HVAC Upgrades_Permit Set_250702.pdf |
| Welch Hospital Pharmacy HVAC Upgrades_CS_250702.pdf |
| Sheets |
| G1.00 - COVER SHEET |
| Welch Hospital Pharmacy HVAC Upgrades_A1.03_250702.pdf |
| Sheets |
| A1.03 - DEMOLITION & NEW CONSTRUCTION RCP |
| ME101.pdf |
| Sheets |
| M2.01 - PARTIAL FIRST FLOOR DEMO AND NEW WORK & PARTIAL ROOF PLAN NEW WORK - MECHANICAL |
| M5.01 - MECHANICAL DETAILS |
| M5.02 - HVAC CONTROLS, PANELBOAED SCHEDULE |
| ME1.01 - LEGEND & SCHEDULE |
| M201.pdf |
| Sheets |
| M2.01 - PARTIAL FIRST FLOOR DEMO AND NEW WORK & PARTIAL ROOF PLAN NEW WORK - MECHANICAL |
| M5.01 - MECHANICAL DETAILS |
| M5.02 - HVAC CONTROLS, PANELBOAED SCHEDULE |
| ME1.01 - LEGEND & SCHEDULE |
| M501.pdf |
| Sheets |
| M2.01 - PARTIAL FIRST FLOOR DEMO AND NEW WORK & PARTIAL ROOF PLAN NEW WORK - MECHANICAL |
| M5.01 - MECHANICAL DETAILS |
| M5.02 - HVAC CONTROLS, PANELBOAED SCHEDULE |
| ME1.01 - LEGEND & SCHEDULE |
| M502.pdf |
| Sheets |
| M2.01 - PARTIAL FIRST FLOOR DEMO AND NEW WORK & PARTIAL ROOF PLAN NEW WORK - MECHANICAL |
| M5.01 - MECHANICAL DETAILS |
| M5.02 - HVAC CONTROLS, PANELBOAED SCHEDULE |
| ME1.01 - LEGEND & SCHEDULE |