Exhibit A-Pricing Page 2023.xlsm.pdf

PDF 518 KB Posted

Attached to
OER - VIENNA PCE SUPERFUND SITE
Solicitation number
ARFQ 0313 DEP2400000004 1
Issued by
Upshur County, West Virginia

About this file

This is a pricing exhibit for a contract with the West Virginia Department of Environmental Protection for operation, maintenance, and monitoring services at the Vienna PCE (chlorinated solvent) remediation site. The contract encompasses a comprehensive range of services including environmental assessment, monitoring well installation, groundwater sampling, and system operation and maintenance. Key services include labor tasks performed by environmental scientists, project managers, environmental technicians, electricians, and CAD/GIS technicians; monitoring well drilling and installation with rotosonic drilling up to 240 linear feet and well abandonment services; biannual and semi-annual groundwater sampling from up to 50 monitoring wells; and weekly, monthly, quarterly, biannual, and annual operation and maintenance activities. The scope also includes preparation of multiple reports including weekly and monthly O&M reports, semi-annual sampling reports, and monitoring well construction reports.

The pricing structure is itemized with estimated quantities for bidding purposes, including labor rates for various professional disciplines, unit costs for drilling and installation activities, and component replacement items such as filters, gauges, solenoid valves, and system parts. Bidders must provide pricing for approximately 71 line items covering hourly labor, per-well services, per-unit equipment, and report deliverables, with an estimated 800 to 1,000 hours for professional services and recurring maintenance tasks scheduled throughout the contract year. The contract includes a parts markup provision (item 71) where vendors submit their percentage markup on materials as a decimal, and a subcontractor use provision without markup markup allowed. No specific contract term, award date, or funding source information is provided in this pricing exhibit.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT "A"

PRICING PAGE

WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

Operation, Maintenance and Monitoring of the Vienna PCE

Item Frequency Specification Description Unit of Measure Est. Qty (For Bidding only)

1 As needed/directed 4.1 Environmental Scientist - (for tasks not listed)

Hour 800

3 As needed/directed 4.2 Project Manager - (for tasks not listed)

Hour 1000

4 As needed/directed 4.3 Environmental Technician (System Operator) - (for tasks not listed)

Hour 1,000

5 As needed/directed 4.4 Electrician Hour 250

6 As needed/directed 4.5 CAD/GIS Technician Hour 200

As needed/directed (Monitoring Well

Installation) 5.2.1

Mobilization and demobilization

Per Well 1

8 Monitoring Well Installation 5.2.2 Rotosonic Drilling Per linear foot 240

9 Monitoring Well Installation 5.2.3 2-inch monitoring well Per linear foot 240

10 Monitoring Well Installation 5.2.4 Well abandonment (if needed)

Per linear foot 160

11 Monitoring Well Installation 5.2.5 Borehole abandonment Per linear foot 160

12 Monitoring Well Installation 5.2.6 Reclamation of disturbed areas

Per square foot 90

13 Monitoring Well Installation 5.2.7 DOT 17-C Drums Each 15

14 Monitoring Well Installation 5.2.8 IDW disposal Per drum 15

15 Monitoring Well Installation 5.2.9 PID Organic vapor analyzer Per day 3

16 Report/Deliverable 5.2.10 Monitoring Well Construction Report

Each 3

17 Report/Deliverable 5.3.1 Sampling Plan Update Each 4

18 Sampling - Biannual 5.3.1.1.1 Sampling of groundwater monitoring wells - low flow

Per Well 50

19 Sampling - Biannual 5.3.1.1.2 Sampling of groundwater monitoring wells - PDB

Per Well 35

20 Groundwater Gauging - Semi-annual 5.3.2 Gauging depth to water in all site monitoring wells

Per Well 152

21 Sampling - Semi-annual 5.3.3 Sampling of AS/SVE monitoring wells

Per Well 26

22 As needed/directed 5.3.4 Report Writing (for tasks not listed)

Hour 500

23 Report/Deliverable 5.3.4 Semi-annual Sampling Report Each 2

24 Weekly 5.4.1 Perform weekly O&M activities

Each 52

25 Monthly 5.4.2 Perform monthly O&M activities

Each 12

26 Quarterly 5.4.3 Perform quarterly O&M activities

Each 4

27 Biannually 5.4.4 Perform biannual O&M activities

Each 4

28 Annually 5.4.5 Perform annual O&M activities

Each 1

29 As needed/directed 5.4.6 Restart computers Each 24

30 As needed/directed 5.4.6 Change bag filters when DP reaches 12 psig

Each 1

31 As needed/directed 5.4.6 Change out or backwash liquid phase when GAC media becomes spent

Each 1

32 As needed/directed 5.4.6 Check EW-1 well vault for leaks

Each 1

33 As needed/directed 5.4.6 Check pull boxes for leaks Each 1

34 As needed/directed 5.4.6 Clean or replace blower inlet air filters

Each 1

35 As needed/directed 5.4.6 Empty condensate collection drums at TU2

Each 1

36 As needed/directed 5.4.6 Pull and check extraction well pump for bio-fouling

Each 1

WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

Operation, Maintenance and Monitoring of the Vienna PCE

Item Frequency Specification Description Unit of Measure Est. Qty (For Bidding only)

37 As needed/directed 5.4.6 Shock chlorinate extraction well as needed

Each 1

38 As needed/directed 5.4.6 Clean transformers Each 1

39 As needed/directed 5.4.6 Clean exhaust fan blades and motor

Each 1

40 As needed/directed 5.4.6 Clean or replace SVE blower inlet air filter element

Each 1

41 Component 5.5.1 Oil filter for air sparge systems

Each 1

42 Component 5.5.1 Air filter for air sparge systems

Each 1

43 Component 5.5.1 Belts for air sparge systems Each 1

44 Component 5.5.1 Solenoid Valve for Air Sparge Systems

Each 1

45 Component 5.5.1 Oil filter for air sparge (TU3) C300, C400 compressor

Each 1

46 Component 5.5.1 Oil filter separator for air sparge (TU1) C300, C400 compressor

Each 1

47 Component 5.5.1 Oil filter separator for air sparge (TU3) C300, C400 compressor

Each 1

48 Component 5.5.1 Air filter for air sparge(TU3) C300, C400 compressor

Each 1

49 Component 5.5.1 PDX filter for Air Sparge (TU3) C300, C400 compressor

Each 1

50 Component 5.5.1 PDX filter for Air Sparge (TU1) C300, C400 compressor

Each 1

51 Component 5.5.1 Solenoid Time Delay Fuses

ATQR 1/2

Each 1

52 Component 5.5.1 Solenoid Rebuild Kit Each 1

53 Component 5.5.1 Vacuum Gauge (0-30” WC vacuum) for SVE Manifold/Wellhead

Each 1

54 Component 5.5.1 Differential pressure gauge for VGAC Tanks DPI-200, 201

(0-10" WC)

Each 1

55 Component 5.5.1 Differential pressure gauge for Drop out tank DPI-100 (0-

15" WC)

Each 1

56 Component 5.5.1 Air Sparge Manifold & Wellhead gauge (0-100 PSI)

Each 1

57 Component 5.5.1 Pressure gauge (0-15" WC) PI 200, 201 on VGAC-201, 202 Tanks

Each 1

58 Component 5.5.1 Moisture separator air filter Each 1

59 Component 5.5.1 Belt set for SVE Systems Each 2

60 Component 5.5.1 Filter element for SVE Systems

Each 2

61 Component 5.5.1 Oil for SVE Systems Per Gallon 20

62 Component 5.5.1 Screen 18x18 mesh for VC Vessels

Each 2

63 Component 5.5.1 Mechanical shaft seal Transfer pumps

Each 2

64 Component 5.5.1 Oil-food grade for air sparge systems

Per Gallon 20

65 Component 5.5.1 25 micron bag filter for TU 3 Bag Filters

Each 2

66 Component 5.5.1 O-ring for bag filter housing lid for TU 3 Bag Filters

Each 2

67 Report/Deliverable 5.6.1 Weekly O&M report Each 52

68 Report/Deliverable 5.6.2 Monthly O&M report Each 12

69 Report/Deliverable 5.6.3 Semi-annual Sampling Report Each 2

WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

Operation, Maintenance and Monitoring of the Vienna PCE

Item Frequency Specification Description Unit of Measure Est. Qty (For Bidding only) 70 Report/Deliverable 5.6.4 O&M Manual Update Each 1

71 Parts Markup 5.5.2 Vendor's percentage of parts markup (presented as a decimal)

72 As needed/As directed 5.1 Subcontractors Use (No Markup)

No bid item