About this file
Operations and Maintenance Manual Summary
This document is a Revised Final Operations and Maintenance (O&M) Manual for the Vienna PCE Superfund Site in Vienna, West Virginia, prepared by CDM Smith under EPA Region III Response Action Contract (RAC) No. EPS30706. The manual provides comprehensive guidance for the operation, maintenance, monitoring, and management of three groundwater treatment units (TU1, TU2, and TU3) that employ air sparging, soil vapor extraction (SVE), and groundwater extraction technologies to remediate tetrachloroethene (PCE) contamination. The manual was updated in October 2015 to reflect system modifications following the relocation of TU4 to the Ravenswood PCE Superfund Site in May 2009. The remedial objective is to reduce groundwater PCE concentration to a risk-based drinking water level of 5 micrograms per liter (MCL) to achieve a cumulative excess cancer risk of 1 x 10⁻⁵ and a Hazard Index of 1.0.
The manual establishes recommended staffing positions including a project manager, operator, and project engineer, and provides detailed technical specifications for all equipment, control systems, operating procedures, maintenance schedules, and monitoring requirements. TU1 consists of two 30 HP compressors, a 5 HP SVE blower, and two vapor-phase GAC treatment vessels with 5,000 lbs of carbon each; TU2 includes one 25 HP compressor with 15 air sparge wells; and TU3 comprises two 40 HP compressors, a 15 HP SVE blower, groundwater extraction equipment rated at 20 gallons per minute, bag filtration, and dual liquid-phase GAC vessels with 1,000 lbs of carbon each. The control systems utilize Allen-Bradley programmable logic controllers with operator interface terminals for automated operation, remote monitoring, and alarm notification via email and text messaging, with maintenance intervals ranging from weekly checks to annual comprehensive inspections and carbon replacement as needed based on operational performance and sampling results.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
EVISED FIN
AL O
PERATIO
N
S AN
D M
AIN
TEN
AN
CE
(O M ) M
AN
UAL G
RO
U N
DW
ATER TREATM
EN
T SYSTEM
S
(TU
1, TU
AN
D TU
3)
Vienna PCE Superfund Site Vienna, W est Virginia O ctober 2015
Response Action Contract for Remedial Planning and Oversight Activities in
EPA Region III
Revised Final Operations and Maintenance (O&M) Manual Groundwater Treatment Systems
(TU1, TU2 and TU3)
Vienna PCE Superfund Site Vienna, West Virginia
October 2015
| Response | Action | Contract | |||
| for | Remedial | Planning | and | Oversight | Activities |
in EPA Region III
U.S. EPA Contract No. EP‐S3‐07‐06
| Revised | Final | Operations | and | Maintenance |
| (O&M) | Manual | Groundwater | Treatment | Systems |
| (TU1, | TU2 | and | TU3) |
| Vienna | PCE | Superfund | Site |
| Vienna, | West | Virginia |
| Work | Assignment | No.: | 016‐LRLR‐03AT |
| Document | Control | No.: | 3330‐016‐OM‐REPT‐02940 |
October 2015
Prepared for:
| U.S. | Environmental | Protection | Agency |
| Region | III |
| 1650 | Arch | Street |
| Philadelphia, | Pennsylvania | 19103 |
Prepared by:
| 3201 | Jermantown | Road, | Suite | 400 |
| Fairfax, | Virginia | 22030 |
i
Table of Contents
Section 1 Introduction ....................................................................................................... 1‐1
| 1.1 | Document | Organization | ......................................................................................................................................... | 1‐1 | |
| 1.2 | O&M | Staffing | Plan | ..................................................................................................................................................... | 1‐2 |
| 1.3 | Project | Directory | ....................................................................................................................................................... | 1‐3 |
Section 2 Background Information and Overview .............................................................. 2‐1
| 2.1 | Site | Description | ......................................................................................................................................................... | 2‐1 | ||
| 2.2 | Remedial | Action | Objectives | .................................................................................................................................. | 2‐2 | |
| 2.3 | Treatment | Unit | Design | Summary | ...................................................................................................................... | 2‐2 |
| 2.4 | O&M | Requirements.................................................................................................................................................. | 2‐6 |
| 2.4.1 | Operations | ...................................................................................................................................................... | 2‐6 | ||
| 2.4.2 | Sampling | and | Monitoring | ........................................................................................................................ | 2‐8 |
2.4.2.1 Performance Monitoring of Operational Conditions ..................................................... 2‐9
Section 3 Control Systems Description ............................................................................... 3‐1
| 3.1 | Control | Panels | ............................................................................................................................................................ | 3‐1 | ||
| 3.2 | Control | Logic | Overview | .......................................................................................................................................... | 3‐1 | |
| 3.3 | Control | System | Functionality | Overview | ......................................................................................................... | 3‐2 |
| 3.4 | Human‐Machine | Interface | (HMI) | ....................................................................................................................... | 3‐3 |
| 3.4.1 | MAIN | Screen | .................................................................................................................................................. | 3‐4 |
| 3.4.2 | MOTORS | Screen | ........................................................................................................................................... | 3‐6 |
| 3.4.3 | VALVES | Screen | ............................................................................................................................................. | 3‐9 |
| 3.4.4 | ALARMS | Screen | .......................................................................................................................................... | 3‐10 |
| 3.4.5 | TREND | Screens | .......................................................................................................................................... | 3‐11 |
| 3.4.6 | Data | Logs | ...................................................................................................................................................... | 3‐13 |
| 3.4.7 | Alarm | Logs | ................................................................................................................................................... | 3‐14 |
| 3.5 | Remote | Alarm | Notification | ................................................................................................................................. | 3‐14 |
| 3.6 | Remote | Access | ......................................................................................................................................................... | 3‐15 |
Section 4 Initial Set‐Up Procedures .................................................................................... 4‐1
| 4.1 | Control | Panels | ............................................................................................................................................................ | 4‐1 | |||
| 4.2 | Bag | Filters | (TU3 | only) | ............................................................................................................................................. | 4‐1 | |
| 4.3 | Transfer | Pumps | ......................................................................................................................................................... | 4‐2 | |||
| 4.4 | Compressors | ............................................................................................................................................................... | 4‐3 | ||||
| 4.5 | Extraction | Well | Pump | (TU3 | only) | ..................................................................................................................... | 4‐3 |
| 4.6 | SVE | Systems | ................................................................................................................................................................ | 4‐4 | |||
| 4.7 | Off‐Gas | Treatment | Systems | .................................................................................................................................. | 4‐5 | ||
| 4.8 | Miscellaneous | Equipment | ..................................................................................................................................... | 4‐5 |
Section 5 Systems Operating Procedures ........................................................................... 5‐1
| 5.1 | Preliminary | Checks | Prior | to | System | Start‐Up | .............................................................................................. | 5‐1 | |||
| 5.2 | Full | Automatic | Start‐Up | and | Operation | .......................................................................................................... | 5‐1 | ||||
| 5.3 | Automatic | Startup | and | Operation | of | Select | Equipment | ........................................................................... | 5‐3 | ||
| 5.4 | Manual | Speed | Control | for | Submersible | Well | Pump | (TU3 | only) | ........................................................... | 5‐3 |
| 5.5 | Routine | Operations | .................................................................................................................................................. | 5‐4 |
Table of Continents (Continued) ii
| 5.6 | Operator | Shutdown | .................................................................................................................................................. | 5‐4 | |||
| 5.7 | Automatic | Shutdown | on | Alarm | Condition | ..................................................................................................... | 5‐5 |
| 5.8 | Emergency | Shutdown | ............................................................................................................................................. | 5‐5 |
Section 6 Maintenance Procedures ................................................................................... 6‐1
| 6.1 | Preventative | Maintenance | and | Lubrication | Schedules | ............................................................................. | 6‐1 |
| 6.2 | Replacement | of | Consumable | Items | ................................................................................................................... | 6‐1 |
| 6.2.1 | Bag | Filters | ....................................................................................................................................................... | 6‐1 | ||
| 6.2.2 | Off‐Gas | Treatment | Media | ......................................................................................................................... | 6‐2 | |
| 6.2.3 | Liquid | Phase | Treatment | Media | ............................................................................................................. | 6‐2 |
| 6.3 | Extraction | Well | Maintenance | ............................................................................................................................... | 6‐3 | ||||
| 6.4 | Shut | down | for | Maintenance, | Repair, | or | Replacement | ............................................................................... | 6‐4 |
| 6.4.1 | Bag | Filters | ....................................................................................................................................................... | 6‐4 | ||
| 6.4.2 | Compressors | .................................................................................................................................................. | 6‐4 | |||
| 6.4.3 | Submersible | Well | Pump | ........................................................................................................................... | 6‐4 | |
| 6.4.4 | SVE | System | ..................................................................................................................................................... | 6‐4 | ||
| 6.4.5 | Off‐Gas | Treatment | System | ....................................................................................................................... | 6‐4 | |
| 6.4.6 | Liquid | Phase | Treatment | System | ........................................................................................................... | 6‐4 |
6.5 Spare Parts List .......................................................................................................................................................... 6‐5
Section 7 Inspection and Monitoring Procedures ............................................................... 7‐1
| 7.1 | Extraction | Wells | and | Pumps | ................................................................................................................................ | 7‐1 |
| 7.2 | Conveyance | Piping | ................................................................................................................................................... | 7‐1 | ||
| 7.3 | Treatment | Plants | ....................................................................................................................................................... | 7‐2 |
Section 8 Troubleshooting Guidelines ................................................................................ 7‐1
Section 9 Health and Safety Guidelines ............................................................................. 7‐1
Section 10 Recordkeeping and Reporting .......................................................................... 7‐1
| 10.1 | Operations | Records | ............................................................................................................................................... | 7‐1 | ||
| 10.2 | Maintenance | Records | ........................................................................................................................................... | 7‐1 | ||
| 10.3 | Quarterly | Operations | Summary | Report | ....................................................................................................... | 7‐2 |
Section 11 References ....................................................................................................... 7‐1
Table of Contents (Continued) iii
List of Figures
| Figure | 3‐1 | MAIN | Screen, | TU1 | |
| Figure | 3‐2 | MAIN | Screen, | TU2 | |
| Figure | 3‐3 | MAIN | Screen, | TU3 | |
| Figure | 3‐4 | MOTORS | Screen, | TU1 | |
| Figure | 3‐5 | MOTORS | Screen, | TU3 | |
| Figure | 3‐6 | VALVES | Screen, | TU1 | |
| Figure | 3‐7 | ALARMS | Screen, | TU3 | |
| Figure | 3‐8 | Real‐Time | TREND | Screen, | TU3 |
| Figure | 3‐9 | Historical | TREND | Screen, | TU3 |
List of Tables
| Table | 1‐1 | Project | O&M | Directory | |||
| Table | 2‐1 | Storm | Sewer | / | Air | Discharge | Criteria |
| Table | 2‐2 | TU1 | Equipment | List | |||
| Table | 2‐3 | TU2 | Equipment | List | |||
| Table | 2‐4 | TU3 | Equipment | List | |||
| Table | 3‐1 | TU1 | Control | System | Interlocks | ||
| Table | 3‐2 | TU2 | Control | System | Interlocks | ||
| Table | 3‐3 | TU3 | Control | System | Interlocks | ||
| Table | 3‐4 | TU1 | Control | Tag | Database | ||
| Table | 3‐5 | TU2 | Control | Tag | Database | ||
| Table | 3‐6 | TU3 | Control | Tag | Database | ||
| Table | 5‐1 | Routine | Operating | Parameters | |||
| Table | 6‐1 | Routine | and | Preventative | Maintenance | Schedule | |
| Table | 6‐2 | Spare | Parts | List | |||
| Table | 7‐1 | Routine | Inspection, | Monitoring, | and | Maintenance | Schedule |
| Table | 8‐1 | General | Troubleshooting | Guidelines |
List of Drawings
| Drawing | 2‐1 | Treatment | Unit | #1 | Site | Plan | ||
| Drawing | 2‐2 | Treatment | Unit | #1 | Mechanical | Layout | ||
| Drawing | 2‐3 | Air | Sparge | and | SVE | Manifold | Details | |
| Drawing | 2‐4 | Treatment | Unit | #2 | Site | Plan | ||
| Drawing | 2‐5 | Treatment | Unit | #2 | Mechanical | Layout | ||
| Drawing | 2‐6 | Treatment | Unit | #3 | Site | Plan | ||
| Drawing | 2‐7 | Treatment | Unit | #3 | Mechanical | Layout | ||
| Drawing | 2‐10 | Treatment | Unit | #1 | Process | and | Instrumentation | Diagram |
| Drawing | 2‐11 | Treatment | Unit | #2 | Process | and | Instrumentation | Diagram |
| Drawing | 2‐12 | Treatment | Unit | #3 | Process | and | Instrumentation | Diagram |
Drawing 2‐14 Treatment Unit #3 Groundwater Extraction Wellhead Detail
Table of Continents (Continued) iv
Appendices
| Appendix | A | Vapor | Phase | Carbon | Units | with | GAC | |
| Appendix | B | Vapor/Liquid | Separator | |||||
| Appendix | C | Liquid | Bag | Filter | Vessels | |||
| Appendix | D | Liquid | Phase | Carbon | Units | with | GAC | |
| Appendix | E | Induction | Motors | |||||
| Appendix | F | Submersible | Pump | |||||
| Appendix | G | Custom | Liquid | Level | Switch | |||
| Appendix | H | Transfer | Pumps | |||||
| Appendix | I | Rotary | Lobe | Blowers | ||||
| Appendix | J | Electromagnetic | Flow | Meter | ||||
| Appendix | K | Pressure | Transmitters | |||||
| Appendix | L | In‐Line | Pneumatic | Flow | Meter | |||
| Appendix | M | Temperature | Transmitters | |||||
| Appendix | N | Pole | Guided | and | Venturi | Flow | Meters | |
| Appendix | O | Groundwater | Extraction | Pump, | Motor, | Transducer, | and | Controller |
| Appendix | P | Supervisory | Controls | and | Data | Acquisition | ||
| Appendix | Q | Air | Compressors | |||||
| Appendix | R | Miscellaneous | Electrical | Equipment | ||||
| Appendix | S | Example | Forms | and | Logs | for | O&M | Recordkeeping |
| Appendix | T | Treatment | Media | Modeling | Data |
Table of Contents (Continued) v
Abbreviations and Acronyms
| amsl | above | mean | sea | level | |||
| CV | controlled | variable | |||||
| EPA | U.S. | Environmental | Protection | Agency | |||
| EW | extraction | well | |||||
| GAC | granular | activated | carbon | ||||
| gpm | gallons | per | minute | ||||
| HDPE | High | Density | Polyethylene | ||||
| HMI | Human‐Machine | Interface | |||||
| HP | horse | power | |||||
| I/O | inputs | & | outputs | (PLC | I/O) | ||
| KVA | kilovolt‐ampere | ||||||
| lbs | pounds | ||||||
| LGAC | liquid | granular | activated | carbon | |||
| LTRA | Long | Term | Remedial | Action | |||
| MCL | maximum | concentration | limits | ||||
| O&M | operations | and | maintenance | ||||
| OIT | Operator | Interface | Terminal | ||||
| P&ID | Process | and | instrumentation | diagram | |||
| PCE | tetrachloroethene | ||||||
| PID | proportional‐integral‐derivative | ||||||
| PLC | programmable | logic | controller | ||||
| ppmv | parts | per | million | by | volume | ||
| psig | pounds | per | square | inch | gage | ||
| PVC | Polyvinyl | Chloride | |||||
| RA | Remedial | Action | |||||
| RAC | Response | Action | Contract | ||||
| RCRA | Resource | Conservation | and | Recovery | Act | ||
| SMP | Site | Management | Plan | ||||
| scfm | cubic | feet | per | minute | at | standard | conditions |
| SDR | standard | dimension | ratio | ||||
| SVE | soil | vapor | extraction | ||||
| TCLP | toxicity | characteristic | leaching | procedure | |||
| TDH | total | discharge | head | ||||
| TU | Treatment | Unit | |||||
| µg/L | micrograms | per | liter | ||||
| VAC | volts | AC | |||||
| VDC | volts | DC | |||||
| VFD | variable | frequency | drive | ||||
| VGAC | vapor | granular | activated | carbon | |||
| wc | water | column |
1‐1
Section 1 Introduction
| CDM | Federal | Programs | Corporation | (CDM | Smith) | has | prepared | this | Revised | Final | Operations | and | ||||
| Maintenance | (O&M) | Manual, | Groundwater | Treatment | Unit | (TU) | 1, | TU2, | and | TU3 | at | the | Vienna | |||
| Tetrachloroethene | (PCE) | Superfund | Site | (the | Site) | in | Vienna, | West | Virginia. | This | manual | is | an | |||
| update | to | the | Final | O&M | Manual, | Groundwater | Treatment | Unit | (TU) | #1, | TU#2, | TU#3, | and | TU#4, | ||
| Revision | 2 | dated | June | 2006 | and | prepared | for | CDM | Smith | by | Arrowhead | Contracting, | Inc. | under | ||
| Subcontract | No. | 3232‐042‐004‐SI. | CDM | Smith | has | prepared | this | Updated | O&M | Manual | under | the | ||||
| U.S. | Environmental | Protection | Agency | (EPA) | Region | 3 | Response | Action | Contract | (RAC) | No. | EP‐S3‐ | ||||
| 07‐06, | Work | Assignment | (WA) | No. | 016‐LRAR‐03AT | in | response | to | recent | updates | to | the | Site | |||
| treatment | systems | and | the | relocation | of | the | TU4 | air | sparge/soil | vapor | extraction | (AS/SVE) | ||||
| system | to | the | Ravenswood | PCE | Superfund | Site | in | May | 2009. | The | scope | of | groundwater | and | air | |
| sampling | associated | with | system | performance | monitoring | is | presented | in | a | separately | bound | |||||
| document | and | is | not | discussed | in | this | document. |
1.1 Document Organization
The O&M manual includes the following sections and appendices:
| Section | 1.0 | – | Introduction | – | In | addition | to | presenting | the | outline | for | this | O&M | Manual, | this |
| section | presents | a | list | of | relevant | supporting | documents, | a | description | of | O&M | ||||
| responsibilities, | and | a | project | directory | (including | Emergency | Contact | List). |
| Section | 2.0 | – | Background | Information | and | Overview | – | This | section | presents | general | ||
| background | information | about | the | Site | and | project, | including | the | Remedial | Action | (RA) | ||
| objectives, | a | summary | of | the | design | of | each | TU, | and | the | requirements | for | O&M. |
| Section | 3.0 | – | Control | Systems | Description | – | This | section | provides | a | discussion | of | the | ||
| control | logic | and | functionality | for | each | system, | including | the | capabilities | of | each | system’s | |||
| motor | control | center. | This | section | has | been | updated | to | reflect | the | recent | upgrades | to | the | |
| control | systems | and | the | removal | of | TU4. |
| Section | 4.0 | – | Initial | Set‐Up | Procedures | – | This | section | provides | procedures | for | the | initial | set‐ |
| up/start‐up | of | each | piece | of | equipment | following | installation. |
| Section | 5.0 | – | Systems | Operating | Procedures | – | This | section | presents | the | procedures | for | ||
| operating | the | equipment | within | each | TU. | The | primary | scenarios | for | startup, | operation, | and | ||
| shutdown | (including | emergency | shutdown | procedures) | are | covered. | This | section | has | been | ||||
| updated | to | reflect | the | recent | upgrades | to | the | control | systems | and | the | removal | of | TU4. |
| Section | 6.0 | – | Maintenance | Procedures | – | This | section | presents | the | general | procedures | for |
| preventative | maintenance | and | inspections | to | optimize | the | operation | of | each | system. | For | |
| more | detailed | maintenance | information, | readers | are | referred | to | the | manufacturer‐specific |
Section 1 Introduction
1‐2
| O&M | literature | contained | in | the | appendices. | This | section | has | been | updated | to | reflect | the | |
| recent | upgrades | to | the | control | systems | and | the | removal | of | TU4. |
| Section | 7.0 | – | Inspection | and | Monitoring | Procedures | – | This | section | presents | general | ||
| procedures | for | inspection | and | monitoring | of | each | system, | as | part | of | the | routine | O&M |
program.
| Section | 8.0 | – | Troubleshooting | Guidelines | – | This | section | presents | general | troubleshooting | |||
| guidelines | in | the | event | of | system | failure | or | shutdown. | For | more | detailed | troubleshooting | |
| information, | readers | are | referred | to | the | manufacturer‐specific | O&M | literature | contained | in | |||
| the | appendices. |
| Section | 9.0 | – | Health | and | Safety | Guidelines | – | This | section | references | a | stand‐alone | Health |
| and | Safety | Plan | for | O&M | related | activities. |
| Section | 10.0 | – | Recordkeeping | and | Reporting | – | This | section | presents | the | recordkeeping | and |
| reporting | requirements | applicable | to | long‐term | O&M. |
| Section | 11.0 | – | References | – | This | section | is | a | new | addition | and | lists | relevant | documents |
| referenced | in | this | manual. |
| Appendices | A | – | R | ‐ | Manufacturer | O&M | literature | and | information | for | equipment | associated |
| with | each | TU, | including | preventative | maintenance | schedules, | troubleshooting | guidelines, | ||||
| and | spare | parts | lists. |
Appendix S ‐ Example forms and logs for O&M recordkeeping.
Appendix T ‐ Treatment media modeling data.
1.2 O&M Staffing Plan
| The | recommended | staffing | for | O&M | includes | a | project | manager, | operator, | and | project | engineer. |
| The | following | paragraphs | summarize | the | responsibilities | associated | with | each | position. |
Project Manager
| A | supervisory | position | directing | the | overall | operation, | maintenance, | monitoring, | and | |
| management | of | air | sparging, | soil | vapor | extraction | (SVE), | and | groundwater | treatment |
system.
| In | charge | of | developing | plans | and | making | sure | that | the | plans | are | carried | out. | Supervise |
| and | direct | on‐site | operation | of | treatment | systems. | Ensure | competency | and | safety | of | |||
| operations. | Ensure | compliance | with | all | permit | requirements. | In | charge | of | approving | all | |||
| changes | in | treatment | system | operation. | Perform | other | related | administrative | and | |||||
| management | work, | as | required. |
Operator
| In | charge | of | the | day‐to‐day | operation, | maintenance, | monitoring, | and | management | of |
| treatment | systems, | extraction | well | systems | and | associated | facilities, | attainment | of | effluent |
Section 1 Introduction
1‐3
| and | air | discharge | requirements, | record | maintenance, | reporting, | waste | disposal, | and |
| associated | on‐site | operations. |
| Intimately | familiar | with | all | permit | regulations | and | enforcement | requirements. | Maintains |
| accurate | and | orderly | managed | O&M | records. |
Performs other related work including, administration, and routine office duties, as required.
Project Engineer
| Responsible | for | providing | technical | assistance | to | the | Operator | and | Project | Manager | in | day‐ |
| to‐day | operations, | maintenance, | and | monitoring | of | treatment | systems, | as | needed. |
Provide changes in operations schedules and control functions.
Monitor site data to ensure the systems are operating at specified performance levels.
1.3 Project Directory
| Table | 1‐1 | is | provided | as | a | directory | of | the | primary | vendors, | suppliers, | and | manufacturers | of | the |
| process | equipment | and | instrumentation. |
2‐1
Section 2 Background Information and Overview
| This | section | presents | general | background | information | about | the | Site | and | project, | including | the | ||
| RA | objectives, | a | summary | of | the | design | of | each | TU, | and | the | requirements | for | O&M. |
2.1 Site Description
| The | Vienna | PCE | Site | is | located | in | the | City | of | Vienna | in | the | Ohio | River | Valley | of | West | Virginia. | The |
| contaminated | area | is | an | urbanized | residential | and | commercial | area | surrounding | the | City | of | |||||||
| Vienna | Municipal | Building | (City | Hall) | and | the | Vienna | and | Busy | Bee | Cleaners. | The | City | of | Vienna | is | |||
| located | in | Wood | County, | West | Virginia. | The | county | is | located | in | the | Allegheny | Plateau | section | of | ||||
| the | Appalachian | Plateaus | Geomorphic | Province. | The | topography | of | the | area | is | that | of | a | maturely | |||||
| dissected | plateau, | characterized | by | narrow, | winding | ridges, | steep | sided | stream | valleys, | and | a | |||||||
| dendritic | drainage | pattern. | The | Site | is | situated | on | a | broad, | relatively | flat | floodplain | of | the | Ohio |
River.
| PCE, | a | dry | cleaning | solvent, | has | been | detected | in | the | City | municipal | drinking | water | wells. | Twelve | |
| municipal | water | supply | wells, | located | throughout | the | City, | are | in | the | affected | area. | Within | the | ||
| area | being | evaluated, | two | facilities | have | been | identified | as | being | probable | sources | of | ||||
| groundwater | contamination | and | are | considered | to | be | potential | responsible | parties | (PRPs). | These | |||||
| facilities | are | Vienna | Cleaners | and | Busy | Bee | Cleaners. |
| PCE | contamination | was | first | detected | in | February | 1992 | at | Municipal | Wells | 1 | through | 4, | located | at | ||
| City | Hall. | The | highest | concentrations | of | PCE | were | detected | in | samples | collected | from | these | wells | |||
| in | 1992; | 170, | 390, | 8, | and | 7 | micrograms | per | liter | (µg/L) | were | detected | in | Wells | 1 | through | 4, |
| respectively. | The | City | discontinued | use | of | these | wells | in | June | 1992. | Groundwater | samples | |||||
| collected | from | Municipal | Wells | 5 | and | 6 | by | West | Virginia | Department | of | Environmental | Protection | ||||
| (WVDEP) | on | September | 22 | and | 24, | 1992 | had | PCE | concentrations | of | 70 | ug/L | and | 0.5 | ug/L, | ||
| respectively. | Municipal | Wells | 7 | and | 8 | are | hydraulically | downgradient, | and | there | is | concern | about | ||||
| future | contamination | as | a | result | of | being | downgradient | of | Municipal | Wells | 5 | and | 6. | Municipal | |||
| Wells | 5 | and | 6 | were | removed | from | service | in | 1991, | due | to | PCE | contamination | and | benzene | ||
| contamination | which | originated | from | a | UST. | With | production | at | six | of | the | twelve | wells | ||||
| discontinued, | the | City | faced | a | potential | water | shortage | emergency. | Consequently, | two | additional | ||||||
| municipal | wells | (13 | and | 14) | were | installed | in | 1995, | hydraulically | upgradient | from | the | |||||
| contaminated | areas, | to | serve | as | a | backup | water | supply | in | the | event | of | such | an | emergency. | The | |
| two | wells | were | brought | online | on | March | 10, | 1997 | to | meet | existing | demands. |
| In | May | 1993 | and | 1994, | REAC | personnel | also | found | PCE | at | the | Site. | A | PCE | plume | was | detected | in | |
| soil | gas | and | groundwater | extending | from | just | north | of | the | Vienna | Cleaners | to | the | south | as | far | as | ||
| the | intersection | of | Grand | Central | Avenue | and | 27th | Street. | The | highest | PCE | concentrations | were | ||||||
| found, | in | both | soil | and | groundwater, | in | the | vicinity | of | the | Vienna | Cleaners | and | the | Busy | Bee | |||
| Cleaners. | The | highest | groundwater | concentrations | were | present | in | ERT‐3 | and | ERT‐4 | (4,763 | µg/L | |||||||
| and | 787 | µg/L, | respectively); | these | wells | are | close | to | the | Vienna | and | Busy | Bee | Cleaners. | As | a |
Section 2 Background Information and Overview
2‐2
| result, | the | contamination | is | assumed | to | have | originated | from | these | facilities. | A | Remedial | |
| Investigation | (RI) | conducted | in | 2001 | has | further | delineated | the | plumes. | Construction | of | the | |
| groundwater | treatment | units | (TU1, | TU2, | TU3 | and | TU4) | was | completed | in | August | 2005 | by |
| Arrowhead | Contracting | under | subcontract | to | CDM | Smith. | The | TU4 | AS/SVE | system | was | relocated | |
| to | the | Ravenswood | PCE | Superfund | Site | in | May | 2009. |
2.2 Remedial Action Objectives
| The | remedial | objective | of | this | project, | as | described | in | the | 2002 | Record | of | Decision | (ROD), | is | to |
| reduce | the | groundwater | PCE | concentration | to | a | risk | based | drinking | water | level | (1 | x | 10‐5 | ||
| cumulative | excess | cancer | risk | and | a | Hazard | Index | of | 1.0). | Successfully | achieving | the | cumulative | |||
| excess | cancer | risk | goal | will | require | a | reduction | in | the | concentrations | of | PCE | to | at | least | the |
| Maximum | Contaminant | Level | (MCL) | of | 5 | µg/L. | To | meet | the | remedial | objective, | air | sparging | with | ||
| soil | vapor | extraction | (SVE) | systems | were | installed | at | the | following | three | areas: |
Vienna Cleaners Source Area (TU1)
Central Plume Area (TU3)
Busy Bee Source Area (TU4)
| Additionally, | an | air | sparging | system | without | SVE | was | installed | in | the | Vienna | Well | Protection | Area | ||
| (TU2), | downgradient | of | the | leading | edge | of | the | plume, | to | protect | the | active | municipal | supply | ||
| wells | (Wells | 7 | and | 8) | from | becoming | contaminated. | One | groundwater | extraction | well | was | ||||
| installed | at | TU3 | in | the | Central | Plume | Area | to | hydraulically | control | the | plume | and | impede | ||
| migration | of | PCE | towards | nearby | active | municipal | supply | wells. | Extracted | groundwater | is | |||||
| treated | onsite | and | discharged | to | the | City’s | storm | sewer | system. | Table | 2‐1 | lists | the | storm | sewer | |
| and | air | discharge | criteria. |
2.3 Treatment Unit Design Summary
| The | following | is | a | summary | of | the | treatment | system | design | for | each | of | the | remaining | three | units |
| currently | installed | at | the | Site. |
TU1
| Operations | at | TU1 | includes | air | sparging | combined | with | SVE, | consistent | with | the | RA | objectives | |||||||
| discussed | in | Section | 2.2. | The | site | layout | for | TU1, | including | the | air | sparge | and | SVE | wellhead | |||||
| locations, | the | underground | air | sparge | and | SVE | pipe | routes, | and | the | location | of | the | treatment | ||||||
| building | is | depicted | in | Drawing | 2‐1. | The | design | basis | for | the | flow | rate | of | the | air | sparge | system | |||
| was | 231standard | cubic | feet | per | minute | (scfm) | at | a | minimum | pressure | at | the | wellheads | of | 41 | |||||
| pounds | per | square | inch | gage | (psig). | The | design | basis | for | the | flow | rate | of | the | SVE | system | was | 217 | ||
| scfm | at | 2.8 | inches | of | mercury | (Hg) | at | the | inlet | to | the | moisture | separator. | There | are | a | total | of | 23 | |
| air | sparge | wells | and | 9 | SVE | wells. | These | wells | were | constructed | by | Prosonic, | however | Arrowhead | ||||||
| was | responsible | for | the | wellhead | hookups. |
| The | designed | maximum | and | average | PCE | influent | to | the | granular | activated | carbon | (GAC) | at | TU1 |
| are | 2,096 | parts | per | million | by | volume | (ppmv) | and | 1,048 | ppmv, | respectively. |
2‐3
The overall system design for TU1 incorporates the following pieces of equipment:
| Two | 30 | horse | power | (HP) | rotary | screw | air | compressors | with | 1.5HP | refrigerated | air | dryer, |
| moisture | separator | (note | that | the | condensate | from | the | moisture | separator | is | routed | to | the |
| sanitary | sewer | system), |
| SVE | skid | including | 55 | gallon | moisture | separator, | 3/4HP | transfer | pump, | inlet | silencer, | 5HP |
| blower, | and | discharge | silencer, |
| Off‐gas | treatment | system, | consisting | of | two | vapor | phase | GAC | vessels | with | 5,000 | pounds | ||
| (lbs) | GAC | per | vessel | (refer | to | Appendix | T | for | off‐gas | treatment | modeling | data | and | media |
| usage | estimates), |
Appurtenances, including flow control valves, solenoid valves, and sample ports,
| Instrumentation, | including | temperature | gauges, | temperature | switches, | pressure | gauges, | ||
| pressure | switches, | flow | meters, | flow | transmitters, | and | level | switches, | and |
Control panel.
| Drawing | 2‐2 | depicts | the | equipment | arrangement | for | TU1. | This | building | is | subdivided | into | a | |
| process | room | and | office. | The | office | houses | the | control | panels, | electrical | service | panels, | and | |
| transformers. | The | off‐gas | treatment | vessels | are | mounted | on | a | concrete | pad | located | outside | and | |
| adjacent | to | the | treatment | building. |
| Pressurized | air | from | a | compressor | is | fed | to | the | air | sparge | wells | via | individual | continuous | 1/2– | ||
| inch | diameter | standard | dimension | ratio | (SDR) | 9 | High | Density | Polyethylene | (HDPE) | lines. | The | |||||
| routing | of | this | piping | is | depicted | on | Drawing | 2‐1. | Each | air | sparge | wellhead | is | comprised | of | a | |
| flow | control | valve | and | 100 | psig | pressure | gauge | housed | in | a | 12‐inch | diameter | well | vault. | The | air | |
| sparge | piping | is | either | directly | buried | or | run | through | Polyvinyl | Chloride | (PVC) | conduit. | Pull | ||||
| boxes | are | also | situated | along | the | piping | routes | (refer | to | Drawing | 2‐1). | The | minimum | burial | |||
| depth | of | the | HDPE | pipe | is | 18 | inches. |
| Soil | vapor | extracted | from | the | SVE | wells | is | conveyed | to | the | SVE | skid | via | 2‐inch | schedule | 40 | PVC | ||
| pipe. | The | routing | of | this | piping | is | depicted | on | Drawing | 2‐1. | Each | SVE | wellhead | is | comprised | of | a | ||
| flow | control | valve, | a | vacuum | gauge, | and | a | sample | port | housed | in | an | 18‐inch | diameter | man‐way. | ||||
| The | minimum | burial | depth | of | the | PVC | pipe | is | also | 18 | inches; | however, | the | pipes | are | sloped | to | ||
| drain | towards | wellheads | or | sumps | positioned | along | the | piping | routes. | Construction | details | for | |||||||
| the | wellheads | and | the | sumps | are | shown | on | Drawing | 2‐3. | Water | that | accumulates | in | the | sumps | is | |||
| periodically | extracted | with | the | use | of | a | hand‐operated | pump. |
| Contaminated | vapors | from | the | SVE | wells | are | routed | through | the | off‐gas | treatment | system, | ||||
| consisting | of | vapor | phase | GAC. | The | treated | air | stream | is | discharged | to | the | atmosphere | through | a | |
| 20‐foot | high | stack | mounted | on | the | side | of | the | treatment | building. |
| It | is | anticipated | that | the | system | will | be | operated | on | a | cycled | basis. | The | cycle | of | operation | for | each | |
| well | (air | sparge | and | SVE) | is | controlled | with | solenoid | valves. | A | description | of | the | system | controls | ||||
| is | presented | in | Section | 3.0. | A | comprehensive | equipment | list | for | TU1 | is | provided | in | Table | 2‐2. |
2‐4
TU2
| Operations | at | TU2 | include | air | sparging | only, | consistent | with | the | RA | objectives | discussed | in | ||||||
| Section | 2.2. | The | site | layout | for | TU2, | including | the | wellhead | locations, | the | underground | pipe | ||||||
| routes, | and | the | location | of | the | treatment | building | is | depicted | in | Drawing | 2‐4. | The | design | basis | ||||
| for | the | flow | rate | of | the | air | sparge | system | was | 115 | scfm | at | a | minimum | pressure | at | the | wellheads | of |
| 38 | psig. | There | are | a | total | of | 15 | air | sparge | wells. |
The overall system design for TU2 incorporates the following pieces of equipment:
| One | 25 | HP | rotary | screw | air | compressor | with | 1.5 | HP | refrigerated | air | dryer, | moisture |
| separator, | and | 30 | gallon | holding | tank | to | store | water | from | the | moisture | separator, |
Appurtenances, including flow control valves, solenoid valves, and sample ports,
| Instrumentation, | including | temperature | gauges, | temperature | switches, | pressure | gauges, | ||
| pressure | switches, | flow | meters, | flow | transmitters, | and | level | switches, | and |
Control panel.
| Drawing | 2‐5 | depicts | the | equipment | arrangement | for | TU2. | This | building | is | subdivided | into | a | ||
| process | room | and | an | office. | The | office | houses | the | control | panel, | electrical | service | panels, | and |
transformer.
| Pressurized | air | from | a | compressor | is | fed | to | the | air | sparge | wells | via | individual | continuous | 1/2– | ||||
| inch | diameter | SDR | 9 | HDPE | lines. | The | routing | of | this | piping | is | depicted | on | Drawing | 2‐4. | Each | air | ||
| sparge | wellhead | is | comprised | of | a | flow | control | valve | and | 100 | psig | pressure | gauge | housed | in | a | 12‐ | ||
| inch | diameter | well | vault. | The | air | sparge | piping | is | either | direct | buried | or | run | through | PVC | ||||
| conduit. | One | pull | box | is | also | situated | along | the | piping | route | (refer | to | Drawing | 2‐4). | The | ||||
| minimum | burial | depth | of | the | HDPE | pipe | is | 18 | inches. |
| It | is | anticipated | that | the | system | will | be | operated | on | a | cycled | basis. | The | cycle | of | operation | for | each | |
| well | is | controlled | with | solenoid | valves. | A | description | of | the | system | controls | is | presented | in | |||||
| Section | 3.0. | A | comprehensive | equipment | list | for | TU2 | is | provided | in | Table | 2‐3. |
TU3
| Operations | at | TU3 | include | air | sparging | combined | with | SVE | and | groundwater | extraction, | ||||||||||
| consistent | with | the | RA | objectives | discussed | in | Section | 2.2. | The | site | layout | for | TU3, | including | the | ||||||
| air | sparge, | SVE | and | groundwater | extraction | wellhead | locations, | the | underground | piping | routes, | ||||||||||
| and | the | location | of | the | treatment | building | is | depicted | in | Drawing | 2‐6. | The | design | basis | for | the | |||||
| flow | rate | of | the | air | sparge | system | was | 372 | scfm | with | a | minimum | pressure | at | the | wellheads | of | 43 | |||
| psig. | The | design | basis | for | the | flow | rate | of | the | SVE | system | was | 408 | scfm | at | 3.2 | inches | Hg | at | the | |
| inlet | to | the | moisture | separator. | The | design | basis | for | the | groundwater | extraction | rate | was | 20 | |||||||
| gallons | per | minute | (gpm) | at | a | total | head | of | 80 | feet. | There | are | a | total | of | 37 | air | sparge | wells, | 17 | |
| SVE | wells, | and | one | groundwater | extraction | well. |
2‐5
| The | designed | maximum | and | average | PCE | vapor | influent | to | the | vapor‐phase | GAC | system | at | TU3 |
| are | 414 | ppmv | and | 207 | ppmv, | respectively. | The | designed | PCE | groundwater | influent | |||
| concentration | to | the | liquid‐phase | GAC | system | is | 1,103 | ug/L. |
The overall system design for TU3 incorporates the following pieces of equipment:
| Two | 40 | HP | rotary | screw | air | compressors | with | 1.5 | HP | refrigerated | air | dryer, | moisture |
| separator | (note | that | the | condensate | from | the | moisture | separator | is | routed | to | the | sanitary |
| sewer | system), |
| SVE | skid | including | 55 | gallon | moisture | separator, | 3/4HP | transfer | pump, | inlet | silencer, | 15 |
| HP | blower, | and | discharge | silencer, |
| Off‐gas | treatment | system, | consisting | of | two | vapor | phase | GAC | vessels | with | 3,000 | lbs | GAC |
| per | vessel | (refer | to | Appendix | T | for | off‐gas | treatment | modeling | data | and | media | usage |
estimates),
| Grundfos® | Redi‐Flo4 | 25E15‐8 | P.E | electric | submersible | well | pump | and | Franklin | 1.5 | HP |
| submersible | motor, |
Two liquid bag filters,
| Liquid | phase | treatment, | consisting | of | two | GAC | vessels | with | 1,000 | GAC | per | vessel | (refer | to |
| Appendix | T | for | treatment | modeling | data | and | media | usage | estimates), |
| ½ | HP | sump | pump | for | the | secondary | containment | (on | stand‐by | in | the | event | water |
| accumulates | inside | the | secondary | containment), | which | routes | water | back | though | the | bag | ||
| filters | and | liquid | phase | GAC | vessels, |
Appurtenances, including flow control valves, solenoid valves, and sample ports,
| Instrumentation, | including | temperature | gauges, | temperature | switches, | pressure | gauges, | ||
| pressure | switches, | flow | meters, | flow | transmitters, | and | level | switches, | and |
Control panel.
| Drawing | 2‐7 | depicts | the | equipment | arrangement | for | TU3. | This | building | is | subdivided | into | a | ||
| process | equipment | room, | office, | utility | sink, | and | toilet. | The | office | houses | the | control | panels, | ||
| electrical | service | panels, | and | transformers. | The | off‐gas | treatment | vessels | and | liquid | phase | ||||
| treatment | vessels | are | located | within | the | building. | The | bag | filters | and | liquid | phase | GAC | vessels | |
| are | located | within | a | secondary | containment | structure | to | capture | potential | water | leaks/spills. |
| Pressurized | air | from | a | compressor | is | fed | to | the | air | sparge | wells | via | individual | continuous | 1/2– | ||||
| inch | diameter | SDR | 9 | HDPE | lines. | The | routing | of | this | piping | is | depicted | on | Drawing | 2‐6. | Each | air | ||
| sparge | wellhead | is | comprised | of | a | flow | control | valve | and | 100 | psig | pressure | gauge | housed | in | a | 12‐ | ||
| inch | diameter | well | vault. | The | air | sparge | piping | is | either | direct | buried | or | run | through | PVC | ||||
| conduit. | Pull | boxes | are | also | situated | along | the | piping | routes | (refer | to | Drawing | 2‐6). | The | |||||
| minimum | burial | depth | of | the | HDPE | pipe | is | 18 | inches. |
2‐6
| Soil | vapors | extracted | from | the | SVE | wells | are | conveyed | to | the | SVE | skid | via | 2‐inch | schedule | 40 | PVC | ||
| pipe. | The | routing | of | this | piping | is | depicted | on | Drawing | 2‐6. | Each | SVE | wellhead | is | comprised | of | a | ||
| flow | control | valve, | a | vacuum | gauge, | and | a | sample | port | housed | in | a | 18‐inch | diameter | well | vault. | |||
| The | minimum | burial | depth | of | the | PVC | pipe | is | also18 | inches, | however, | the | pipes | are | sloped | to | |||
| drain | towards | wellheads | or | sumps | positioned | along | the | piping | routes. | Construction | details | for | |||||||
| the | sumps | are | shown | on | Drawing | 2‐3. | Water | that | accumulates | in | the | sumps | is | periodically | |||||
| extracted | with | the | use | of | a | small | vacuum | pump. |
| Contaminated | groundwater | extracted | from | the | extraction | well | (EW‐1) | is | conveyed | to | the | bag | |||||
| filters | via | 2‐inch | schedule | 40 | PVC | pipe. | The | groundwater | is | then | routed | to | the | liquid | phase | GAC, | |
| with | treated | water | discharged | to | the | storm | sewer. | The | location | of | the | effluent | outfall | is | shown | on | |
| Drawing | 2‐6. | The | routing | of | this | piping | is | depicted | on | Drawing | 2‐6. | Construction | details | of | the | ||
| well | vault | are | shown | on | Drawing | 2‐3. | The | minimum | burial | depth | of | the | influent | and | effluent | pipe | |
| is | 36 | inches. |
| Contaminated | vapors | from | the | SVE | wells | are | routed | through | the | off‐gas | treatment | system, | ||||
| consisting | of | vapor | phase | GAC. | The | treated | air | stream | is | discharged | to | the | atmosphere | through | a | |
| stack | mounted | on | the | side | of | the | treatment | building. |
| The | air | sparge | and | SVE | system | is | operated | on | a | cycled | basis. | The | cycle | of | operation | for | each | well | |
| is | controlled | with | solenoid | valves. | The | groundwater | extraction | well | will | be | run | on | a | continuous | |||||
| basis. | A | description | of | the | system | controls | is | presented | in | Section | 3.0. | A | comprehensive | ||||||
| equipment | list | for | TU3 | is | provided | in | Table | 2‐4. |
Control Systems
| The | control | systems | are | based | on | a | 480‐volt | AC | (VAC) | control | panel | containing | an | Operator | |||
| Interface | Terminal | (OIT), | programmable | logic | controller | (PLC), | Allen‐Bradley | PowerFlex® | 40 | ||||||||
| variable | frequency | drive | (VFD) | (TU3 | only), | and | associated | 24‐volt | DC | (VDC) | power | supplies | for | ||||
| DC | input/output | (I/O) | circuits. | The | facility | receives | incoming | power | at | 480VAC, | 3Ø | from | |||||
| MonPower | Company | pole‐mounted | transformers. | The | electrical | drop | connects | to | a | power | meter | ||||||
| mounted | on | the | poles. | Power | is | brought | into | each | building | where | it | is | split | between | two | service | |
| panels | and | the | control | panel. | Details | are | provided | in | the | electrical | schematics | (E‐series | |||||
| drawings) | from | the | set | of | as‐built | drawings. | Section | 3.0 | provides | further | information | regarding | |||||
| the | control | panel | hardware | and | software. | The | overall | control | logic | scheme | is | depicted | |||||
| graphically | in | process | and | instrumentation | diagrams | (P&IDs), | Drawings | 2‐10 | through | 2‐12. |
2.4 O&M Requirements
| This | subsection | summarizes | the | specified | requirements | for | operations, | maintenance, | sampling |
| and | monitoring | to | be | implemented | by | the | O&M | contractor. |
2.4.1 Operations
The following are the operational requirements applicable to each TU:
| Operate | all | equipment, | systems, | processes, | and | appurtenances | in | accordance | with | the |
| equipment | manufacturer’s | specifications | and | O&M | instructions, | and | the | approved | O&M |
Manual, 2‐7
| Extract | groundwater | on | a | continuous | basis | to | achieve | hydraulic | control | of | the | groundwater |
| at | TU3, |
Operate air sparge and SVE systems on cycled basis to achieve groundwater cleanup level, Discharge treated vapor to the atmosphere in accordance with air discharge requirements, Discharge treated groundwater at TU3 to the storm sewer in accordance with discharge limits,
| Containerize, | characterize, | transport, | and | dispose | of | all | process | and | sampling | waste |
| residuals | at | an | approved | waste | disposal | facility, |
| Procure | all | equipment, | spare | parts, | supplies, | and | services | required | for | operation, |
| maintenance, | monitoring, | and | management | of | the | treatment | systems, |
| Manage | and | maintain | an | inventory | of | equipment, | spare | parts, | supplies, | and | tools | required |
| for | continuous | operation | with | minimal | downtime, |
| Monitor | treatment | system | performance, | compliance, | and | remedial | progress | by | collecting |
| specified | samples | and | field | measurements | (refer | to | Section | 10.0), |
| Prepare | operational | records | and | maintain | project | files | (refer | to | Section | 10.0). | Prepare | and |
| submit | progress | reports, |
Abide by all operational requirements and report any non‐compliant conditions to EPA, Optimize the use of process equipment to minimize operational costs,
| Notify | CDM | Smith | Project | Manager | immediately | of | any | system | downtime | greater | than | 24 |
| hours | or | any | non‐compliance | with | discharge | requirements, |
| Provide | routine, | preventative, | and | corrective | maintenance, | including | all | processes, |
| equipment, | controls, | facilities, | and | appurtenances, |
| Perform | routine, | preventative, | and | corrective | maintenance | in | accordance | with | the |
| equipment | manufacturer’s | specifications | and | this | O&M | Manual, |
| Store | all | tools, | spare | parts, | equipment, | and | supplies | in | an | appropriate | storage | area. |
| Manage | the | inventory | and | maintenance | of | such | items | to | minimize | downtime | for |
maintenance,
| Maintain | good | housekeeping | practices. | Facilities | shall | be | kept | neat, | organized, | and | litter‐ | ||
| free. | Clean | and | remove | accidental | spills, |
| Routinely | inspect | and | maintain | the | physical | condition | of | exterior | facilities, | equipment, | and |
| grounds | as | follows: |
Fencing and locks shall be maintained, and repaired or replaced when necessary, 2‐8
| Vegetation | shall | be | maintained | in | a | manner | that | is | consistent | with | the | surrounding |
| properties | and | cut | when | necessary, |
| Touch‐up | painting | shall | be | performed | as | necessary | to | prevent | corrosion | or | other |
| damage | associated | with | environmental | exposure, |
| Well | vaults | shall | be | inspected | for | surface | leaks; | access | hatch | seals | and | grading | shall | be |
| replaced/corrected | when | needed, |
| SVE | sumps | shall | be | emptied | as | needed | to | prevent | water | from | hindering | vapor | flow |
| from | the | wells, |
| Structural | support | systems, | such | as | concrete | flooring, | structural | anchoring, | and | guy |
| wires, | shall | be | periodically | checked | for | structural | integrity | and | adjusted/repaired | if |
necessary,
| Building | openings | and | access | ways, | including | doors, | louvers, | fans, | and | air | conditioners |
| shall | be | periodically | checked | for | leakage | and | structural | integrity; | adjust/tighten | ||
| hardware, | apply | caulk, | and | replace | weather | stripping | when | needed. |
2.4.2 Sampling and Monitoring
| As | part | of | the | overall | O&M | of | each | system, | sampling | and | monitoring | activities | will | be | conducted |
| to | evaluate | the | following: |
Treatment system compliance to confirm that permitted discharge requirements are being met,
| Treatment | system | performance | to | confirm | that | hydraulic | control | is | being | maintained | and | |
| that | treatment | systems | are | operating | properly. | Monitor | influent | flow | and | water | quality | |
| from | the | extraction | well, | drawdown | and | hydraulic | control | of | groundwater, | and | unit | |
| process | performance. | Information | shall | be | used | to | support | decisions | regarding | |||
| adjustments | to | the | pumping | rate | and | unit | process | operation, |
| Remedial | progress | by | monitoring | changes | in | source‐area | and | site‐wide | groundwater | ||||||
| quality, | levels, | and | flow | over | time. | This | shall | include | the | areas | subjected | to | air | sparging, | |
| and | groundwater | extraction. | Information | shall | be | compared | against | design | assumptions | ||||||
| and | predictions | regarding | remedy | performance, | and | shall | be | used | to | refine | such | ||||
| assumptions | and | predictions | and | the | environmental | monitoring | program | as | more | ||||||
| information | is | gathered. |
The long‐term O&M phase of the RA includes two primary sampling programs:
Performance and compliance sampling (groundwater and vapor)
Site‐wide groundwater sampling
The specific requirements for the sampling programs is discussed in a separately bound document.
2‐9
2.4.2.1 Performance Monitoring of Operational Conditions
| Performance | monitoring | of | operational | conditions | will | be | conducted | on | a | prescribed | basis | for |
| purposes | of | documentation | and | to | assess | whether | adjustments | or | maintenance | is | required. | The |
| following | operational | parameters | shall | be | recorded | on | a | prescribed | basis | from | process | |
| instruments, | meters, | and | gauges: |
Extraction well water level
Extraction well pump flow rate and totalized flow
Bag filter differential pressure
Liquid granular activated carbon (LGAC) #1 differential pressure
LGAC #2 differential pressure
Air sparge flow rates
Air sparge wellhead pressure
Air sparge manifold pressure
Compressor outlet pressure
SVE wellhead vacuum
SVE manifold vacuum for each well
SVE flow rate from each well
SVE blower flow (extraction) rate
SVE blower inlet vacuum
SVE blower inlet temperature
SVE blower discharge temperature
SVE blower discharge pressure
Vapor granular activated carbon (VGAC) #1 outlet pressure
VGAC #1 differential pressure
VGAC #2 outlet pressure
VGAC #2 differential pressure
Groundwater level measurements in monitoring wells
Other routine operating parameters
3‐1
Section 3 Control Systems Description
| The | Treatment | Units | are | equipped | with | programmable | control | systems | which | control | all | ||||||
| automatic | processes | and | facilitate | remote | access | and | remote | alarm | notifications. | Each | Treatment | ||||||
| Unit | functions | as | a | stand‐alone | system | with | its | own | control | panel | containing | a | programmable | ||||
| logic | controller | (PLC), | Operator | Interface | Terminal | (OIT), | and | associated | control | equipment. | |||||||
| Each | control | panel | is | powered | by | an | uninterruptible | power | supply | which | maintains | power | to | the | |||
| PLC, | OIT, | and | all | input | & | output | circuits | for | 15 | minutes | following | a | power | outage. | Control | system | |
| components, | remote | access | features | and | operational | instructions | are | described | in | the | Sections | ||||||
| that | follow. | The | description | of | the | control | systems | is | based | on | the | components | and | features | |||
| common | to | the | three | systems | currently | installed | on | Site | with | exceptions | as | noted | throughout. |
3.1 Control Panels
| Each | control | panel | is | equipped | with | an | Allen‐Bradley | VersaView | 1500P | 15‐inch | touch‐screen | OIT | |||||||
| from | which | the | on‐site | operator | and | remote | users | control | and | monitor | all | automated | processes | ||||||
| in | the | system | (refer | to | Appendix | P). | The | VersaView | OIT | is | an | industrial | computer | with | a | ||||
| Windows | 7 | Pro | 32‐bit | operating | system, | a | CD‐RW | drive, | 3‐1/2 | inch | floppy | drive, | keyboard, | ||||||
| mouse, | and | several | serial | and | USB | ports | for | peripheral | devices. | The | OIT | is | connected | to | an | Allen‐ | |||
| Bradley | SLC | 5/05 | programmable | controller | located | on | the | panel | behind | the | OIT. | Two | 24VDC | ||||||
| power | supplies | are | provided | in | the | control | panel | at | TU3 | – | one | for | analog | I/O | and | the | other | for | the |
| discrete | 24VDC | circuits | shown | in | the | electrical | schematics. | TU1 | contains | one | 24VDC | power | |||||||
| supply | for | analog | I/O. | TU2 | does | not | contain | a | 24VDC | power | supply | as | there | are | not | any | analog | or | |
| other | 24VDC | circuits. | The | TU3 | control | panel | also | includes | an | Allen‐Bradley | PowerFlex® | 40 | VFD | ||||||
| used | to | control | the | speed | (pumping | rate) | of | the | well | pump | in | extraction | well | EW‐1. |
3.2 Control Logic Overview
| The | control | systems | for | each | Treatment | Unit | are | programmed | with | ladder | logic | to | implement | ||||
| interlocks, | control | system | processes, | cycle | process | equipment, | initiate | local | and | remote | alarms, | ||||||
| and | safely | start | up | and | shut | down | each | system. | The | control | interlocks | are | listed | in | Tables | 3‐1 | |
| through | 3‐3 | for | TU1, | TU2 | and | TU3, | respectively. | AUTO | mode | must | be | selected | for | each | motor | ||
| or | solenoid | valve | in | order | for | the | interlocks | to | function | as | designed. | Any | piece | of | equipment | ||
| placed | in | MAN(ual) | mode | will | have | its | control | interlocks | bypassed. |
| The | control | interlocks | begin | to | function | automatically | upon | start | up. | Clicking | the | System | START | |
| button | on | the | MAIN | screen | first | removes | any | previously | existing | stop | commands, | places | all | |
| process | equipment | in | AUTO | mode, | and | then | sequentially | starts | the | following | in | order: |
TU1
SVE blower, B‐1
SVE solenoid valves (order determined by well cycle schedule and time of day at startup)
Section 3 Control Systems Description
3‐2
Transfer pump, P‐1
Air compressor, AC‐1 (depending on compressor cycle schedule and time of day at startup)
Air compressor, AC‐2 (depending on compressor cycle schedule and time of day at startup)
Sparge solenoid valves (order determined by well cycle schedule and time of day at startup)
TU2
Air compressor, AC‐1
Sparge solenoid valves (order determined by well cycle schedule and time of day at startup)
TU3
SVE blower, B‐1
SVE solenoid valves (order determined by well cycle schedule and time of day at startup)
Transfer pump, P‐1
Air compressor, AC‐1 (depending on compressor cycle schedule and time of day at startup)
Air compressor, AC‐2 (depending on compressor cycle schedule and time of day at startup)
Sparge solenoid valves (order determined by well cycle schedule and time of day at startup)
Extraction well pump
The systems can also be started by the START pushbutton on the front of the control panel.
| The | START | sequence | tests | for | all | applicable | control | interlocks | and | possible | alarm | conditions | and | |||||
| prevents | any | component | or | the | entire | system | from | starting | depending | on | these | conditions, | as | |||||
| outlined | in | Tables | 3‐1 | through | 3‐3. | At | TU3 | this | includes | well | water | level | controls | which | prevent | |||
| the | pump | from | running | dry | with | a | low | level | shutdown | interlock | measured | with | a | submersible | ||||
| water | level | transmitter | installed | in | the | well, | or | if | a | high | water | level | condition | is | detected | in | the | |
| catch | basin | outfall. | The | air | compressors | typically | are | allowed | to | run | as | long | as | the | SVE | blower | is | |
| maintaining | sufficient | vacuum | and | there | are | no | internal | alarm | conditions | within | these | units, | i.e., | |||||
| an | internal | fault | condition. | The | SVE | blowers | typically | are | allowed | to | run | as | long | as | water | levels | in | |
| the | moisture | separators | are | kept | below | the | high‐high | level | alarm | condition. |
3.3 Control System Functionality Overview