About this file
This is an Operations and Maintenance Manual attachment providing standardized forms and logs for equipment monitoring and recordkeeping at a remediation facility with three treatment units (TU1, TU2, and TU3). The document establishes systematic documentation procedures for initial equipment setup and startup operations, including voltage measurements for control panels, motor amperage readings, pressure and vacuum gauges, flow rate indicators, and functional tests for compressors, pumps, manifolds, and environmental control systems across multiple wells and treatment stages.
The manual includes detailed monitoring logs for air sparge wells, soil vapor extraction (SVE) wells, groundwater extraction systems, and offgas treatment systems, with prescribed measurement parameters such as wellhead pressure, manifold pressure, rotameter readings, vacuum levels, and differential pressures. Additional sections address system runtime and shutdown documentation, corrective action tracking, maintenance activity logging, and treatment media data recording. The forms are designed to facilitate compliance with operational standards and enable systematic tracking of equipment performance, maintenance schedules, and system reliability across the remediation facility's interconnected treatment processes.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R‐1
Appendix R Miscellaneous Electrical Equipment
S‐1
Appendix S Example Forms and Logs for O&M Recordkeeping
EQUIPMENT INITIAL SET-UP / START-UP
TU1
Equipment Initial Set-Up / Start-Up Form
Equipment Operating Condition Measurement Date Performed By Comments
Control Panel
L1 to ground (V)
L2 to ground (V)
L3 to ground (V)
L1 to L2 (V)
L1 to L3 (V)
L2 to L3 (V)
SVE Transfer Pump
PUMP motor amp draw
PUMP pressure will running
Deadhead pressure (pressure w/pump effluent valve closed)
SVE System
SVE inlet vacuum
SVE motor amp draw
Pressure drop across the knock out filter
SVE exhaust temperature
SVE exhaust pressure
SVE flow rate
Air Compressor #1
Compressor outlet pressure
Compressor motor amp draw
Dryer motor amp draw
Compressor flow rate indicator
Equipment Operating Condition Measurement Date Performed By Comments
Air Compressor #2
Compressor Outlet pressure
Compressor motor amp draw
Dryer motor amp draw
Compressor flow rate indicator
Air Sparge
Mainfold
Flow meters with valves
Pressure gauge
Air Sparge
Wellhead
Well pressure gauge
SVE Manifold
Vacuum gauge
Flow rate
SVE wellheads Vacuum gauge
VPGAC
Inlet pressure to GAC 1
Inlet pressure to GAC 2
Outlet pressure to stack
Room Heaters Fan motor amp draw
On/off function
Air Conditioner On/off function
Exhaust Fan On/off function
Emergency Stop
Button
Off function
TU2
Equipment Initial Set-Up / Start-Up Form
Equipment Operating Condition Measurement Date Performed By Comments
Control Panel
L1 to ground (V)
L2 to ground (V)
L3 to ground (V)
L1 to L2 (V)
L1 to L3 (V)
L2 to L3 (V)
Air Compressor #1
Compressor outlet pressure
Compressor motor amp draw
Dryer motor amp draw
Compressor flow rate indicator
Air Sparge
Mainfold
Flow meters with valves
Pressure gauge
Air Sparge
Wellhead
Well pressure gauge
Room Heaters Fan motor amp draw
TU3
Equipment Initial Set-Up / Start-Up Form
Equipment Operating Condition Measurement Date Performed By Comments
Control Panel
L1 to ground (V)
L2 to ground (V)
L3 to ground (V)
L1 to L2 (V)
L1 to L3 (V)
L2 to L3 (V)
SVE Transfer Pump
PUMP motor amp draw
PUMP pressure will running
Deadhead pressure (pressure w/pump effluent valve closed)
SVE System
SVE inlet vacuum
SVE motor amp draw
Pressure drop across the knock out filter
SVE exhaust temperature
SVE exhaust pressure
SVE flow rate
Air Compressor #1
Compressor outlet pressure
Compressor motor amp draw
Dryer motor amp draw
Compressor flow rate indicator
Air Compressor #2
Compressor Outlet pressure
Compressor motor amp draw
Dryer motor amp draw
Compressor flow rate indicator
Air Sparge
Mainfold
Flow meters with valves
Pressure gauge
Air Sparge
Wellhead
Well pressure gauge
SVE Manifold
Vacuum gauge
Flow rate
SVE wellheads Vacuum gauge
VPGAC
Inlet pressure to GAC 1
Inlet pressure to GAC 2
Outlet pressure to stack
Groundwater
Treatment System
Influent flow rate
Bag filter #1 inlet pressure
Bag filter #1 outlet pressure
Bag filter #2 inlet pressure
Bag filter #2 outlet pressure
LP GAC #1 inlet pressure
LP GAC #1 outlet pressure
LP GAC #2 inlet pressure
LP GAC #2 outlet pressure
Transducer Water level prior to start up
Room Heaters Fan motor amp draw
AIR SPARGE WELL AND MANIFOLD READINGS
Air Sparge Well and Manifold Reading (TU1)
Well Number Wellhead
Pressure (psi) Manifold
Pressure (psi) Rotameter (ft3/min) Date
Performed By Comments
S-A1
S-A2
S-A3
S-A4
S-A5
S-A6
S-A7
S-A8
S-A9
S-A10
S-A11
S-A12
S-A13
S-A14
S-A15
S-A16
S-A17
S-A18
S-A19
S-A20
S-A21
S-A22
S-A23
Air Sparge Well and Manifold Reading (TU2)
Well Number Wellhead
Pressure (psi) Manifold
Pressure (psi) Rotameter (ft3/min) Date
Performed By Comments
S-B1
S-B2
S-B3
S-B4
S-B5
S-B6
S-B7
S-B8
S-B9
S-B10
S-B11
S-B12
S-B13
S-B14
S-B15
Air Sparge Well and Manifold Reading (TU3)
Well Number Wellhead
Pressure (psi) Manifold
Pressure (psi) Rotameter (ft3/min) Date
Performed By Comments
S-C1
S-C2
S-C3
S-C4
S-C5
S-C6
S-C7
S-C8
S-C9
S-C10
S-C11
S-C12
S-C13
S-C14
S-C15
S-C16
S-C17
S-C18
S-C19
S-C20
S-C21
S-C22
Well Number Wellhead
Pressure (psi) Manifold
Pressure (psi) Rotameter (ft3/min) Date
Performed By Comments
S-C23
S-C24
S-C25
S-C26
S-C27
S-C28
S-C29
S-C30
S-C31
S-C32
S-C33
S-C34
S-C35
S-C36
S-C37
SVE WELL AND MANIFOLD READINGS
SVE Well and Manifold Reading (TU1)
Well Number Wellhead Vacuum
(in WC) Manifold Vacuum
(in WC) Differential
Pressure(in WC) Date
Performed By Comments
V-A1
V-A2
V-A3
V-A4
V-A5
V-A6
V-A7
VE-1
VE-2
SVE Well and Manifold Reading (TU3)
Well Number Wellhead
Vacuum (in WC) Manifold Vacuum
(in WC) Differential
Pressure(in WC) Date
Performed By Comments
V-C1
V-C2
V-C3
V-C4
V-C5
V-C6
V-C7
V-C8
V-C9
V-C10
V-C11
V-C12
V-C13
V-C14
V-C15
V-C16
V-C17
SYSTEM RUN TIME AND SHUTDOWN
Systems Shutdown Record
Facility ________________
Date of Shutdown: Recorded By:
Time of Shutdown:
Planned Shutdown Unplanned Shutdown
System Restart: Date: Time:
Description of Shutdown (e.g., all systems shutdown, partial shutdown, etc.)
Cause of unplanned shutdown – OR – purposed of planned shutdown
Recommended Corrective Action (s): (Discuss)
Corrective Action(s) Completed
By: Date:
Observation/Notes
System Runtime and Shutdown Log
Facility _________
System _____________
Start Stop
Total Time
(minutes)
Planned
Maint.
Failure /
Alarm Description
Run Time System Shutdown Date
GROUNDWATER SYSTEM MONITORING
Groundwater Extraction Well Monitoring Log
Date Well ID Valve Position Wellhead Pressure (psi)
Flowrate (gpm)*
Notes:
* Flowrate is based on totalizer reading (gallons) divided by the time interval (minutes)
Groundwater Extraction System Monitoring Data
Date Time Totalizer
(gal.)
Flowrate
(gpm)
Wellhead
Pressure
(psi)
Bag Filter
#1 Inlet
Pressure
(psi)
Bag Filter
#1 Outlet
Pressure
(psi)
Bag Filter
#2 Inlet
Pressure
(psi)
Bag Filter
#2 Outlet
Pressure
(psi)
LP GAC #1
Inlet
Pressure
(psi)
LP GAC #1
Outlet
Pressure
(psi)
LP GAC #2
Inlet
Pressure
(psi)
LP GAC #2
Outlet
Pressure
(psi)
AIR SPARGE / SVE SYSTEMS MONITORING
Air Sparge/SVE Systems Monitoring Data - TU1
(psi) (in. H2O) (psi) (Deg. F) (psi) (scfm) (psi) (scfm)
Compressor
Outlet
Pressure
Compressor
Air
Discharge
Flow Rate
SVE Transfer
Pump
Discharge Press.
SVE Inlet
Vacuum
Knock-out
Tank Filter
Diff. Pressure
SVE Exhaust
Temperature
SVE Exhaust
Pressure
SVE Flow
Rate
Air Sparge/SVE Systems Monitoring Data - TU2
(psi) (scfm)
Compressor
Outlet Pressure
Compressor Air
Discharge Flow
Rate
Air Sparge/SVE Systems Monitoring Data - TU3
(psi) (in. H2O) (psi) (Deg. F) (psi) (scfm) (psi) (scfm)
SVE Exhaust
Pressure
SVE Flow
Rate
Compressor
Outlet
Pressure
Compressor
Air
Discharge
Flow Rate
SVE Transfer
Pump
Discharge Press.
SVE Inlet
Vacuum
Knock-out
Tank Filter
Diff. Pressure
SVE Exhaust
Temperature
OFFGAS TREATMENT SYSTEMS MONITORING
Offgas Treatment System Monitoring Data
Facility _______________
(Deg. F) (psi) (psi) (psi)
Date
GAC #1
Infl. Temp.
GAC #1
Effl. Press.
GAC #2
Effl. Press.
GAC #1
Influent.
Press.
OPERATIONS AND MAINTENANCE ACTIVITIES
General Maintenance Log
Date Time Equipment ID Total Time Unit Has
Run To Date
Time Elapsed Since Prior Maintenance
Event
Maintenance Activity*
Performed By Comments
Notes:
* i.e., lubrication, cleaning, filter replacement, drain condensate
Operations and Maintenance Activities
Facility _____________
Date
Operation and Maintenance Events
O & M Performed
T‐1
Appendix T Treatment Media Modeling Data