Exhibit_A_Price_Sheet.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- Asphalt Sealing, Striping, & Sweeping Services
- Solicitation number
- AR 25-073-JG
- Issued by
- Polk County, Lake Harbor CDP, Florida
About this file
This is an Exhibit A Price Sheet for a competitive sealed bid solicitation issued by the Kissimmee Utility Authority (KUA) for asphalt sealing, striping, and sweeping services under Annual Requirement AR 25-073-JG. The scope of work encompasses maintenance of two distinct areas: Area #1 (2850 and 2854 N John Young Parkway) and Area #2 (1701 W Carroll Street), with services including bi-annual sealcoating, color-coded striping in white, yellow, green, and blue, pothole repair, crack filling, curb repair, and sidewalk repair. The contract is structured over five years with alternating annual focus areas, beginning with Area #2 in Year 1 and rotating between the two locations. Estimated quantities include 19,500 to 33,500 square yards of sealcoat annually depending on the area, 3,100 to 6,000 linear feet of striping, semiannual sweeping of approximately 53,000 square feet, and as-needed repairs. The bid submission deadline is October 14, 2025, at 2:00 PM EST, with public bid opening via Zoom. The contract term is three years with two optional one-year renewal periods.
The price sheet provided shows all line items with $0.00 unit and annual pricing, indicating this is a blank template for vendor cost submissions rather than a completed pricing document. Vendors must provide detailed pricing for scheduled bi-annual work and as-needed services, including mobilization costs, striping, pothole and asphalt repair with potential milling, and sidewalk repairs. Bidders are required to furnish all labor, materials, tools, equipment, and transportation, with work performed outside normal business hours, on weekends, or holidays as needed. Vendor qualifications require proof of commercial experience with a minimum of four commercial accounts and at least one year of verifiable service history. The solicitation specifies Service Tier A insurance requirements for work under $250,000. No incumbent vendor information is provided in the documentation, and no specific set-aside designations for disadvantaged enterprises are indicated.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Acerno_Cache_XXXXX
Exhibit A Price Sheet
| Exhibit A Price Sheet | |||||
| AR 25-073-JG Asphalt Sealing, Striping, & Sweeping Services | |||||
| Vendor Name: | Carroll St area | ||||
| I. Year 1 - AREA #2 Cost (Bi-Annual Work) | |||||
| Item # | Location | Estimated | Unit/Each Cost | Annual Price | |
| 1 | Square yard of sealcoat | 19,500 | $0.00 | $0.00 | |
| 2 | Linear foot of striping | 6,000 | $0.00 | $0.00 | |
| 3 | Square foot of pothole repair | 10 | $0.00 | $0.00 | |
| 4 | Linear foot of curb repair | 50 | $0.00 | $0.00 | |
| 5 | Cubic yard for sidewalk repair | 1 | $0.00 | $0.00 | |
| 6 | Semiannual (every 6 months) sweeping or blowing of all parking and driving areas | 53,000 | $0.00 | $0.00 | |
| Year 1 Total Cost Per Year (Scheduled Work) | $0.00 |
| As Needed Basis (Work requested and performed outside of Bi-ANNUAL WORK schedule) | ||||
| Minor striping or repairs | ||||
| Item # | Location | Estimated | Unit/Each Cost | Price |
| 7 | Mobilization cost | 1 | $0.00 | $0.00 |
| 8 | Linear foot of striping | 500 | $0.00 | $0.00 |
| 9 | Square foot of pothole/asphalt repair, including milling if required | 10 | $0.00 | $0.00 |
| 10 | Cubic yard for sidewalk repairs | 1 | $0.00 | $0.00 |
| Year 1 Total Cost (As Needed) | $0.00 | |||
| Year 1 Total Cost: | $0.00 |
| II. Year 2 - AREA #1 Cost (Bi-Annual Work) | Lackey/Davis area | ||||
| Item # | Location | Estimated | Unit/Each Cost | Annual Price | |
| 1 | Square yard of sealcoat | 33,500 | $0.00 | $0.00 | |
| 2 | Linear foot of striping | 3,100 | $0.00 | $0.00 | |
| 3 | Square foot of pothole repair | 10 | $0.00 | $0.00 | |
| 4 | Linear foot of curb repair | 50 | $0.00 | $0.00 | |
| 5 | Cubic yard for sidewalk repair | 1 | $0.00 | $0.00 | |
| 6 | Semiannual (every 6 months) sweeping or blowing of all parking and driving areas | 53,000 | $0.00 | $0.00 | |
| Year 2 Total Cost Per Year (Scheduled Work) | $0.00 |
| As Needed Basis (Work requested and performed outside of Bi-ANNUAL WORK schedule) | ||||
| Minor striping or repairs | ||||
| Item # | Location | Estimated | Unit/Each Cost | Price |
| 7 | Mobilization cost | 1 | $0.00 | $0.00 |
| 8 | Linear foot of striping | 500 | $0.00 | $0.00 |
| 9 | Square foot of pothole/asphalt repair, including milling if required | 10 | $0.00 | $0.00 |
| 10 | Cubic yard for sidewalk repairs | 1 | $0.00 | $0.00 |
| Year 2 Total Cost (As Needed) | $0.00 | |||
| Year 2 Total Cost: | $0.00 |
III. Year 3 - AREA #2 Cost (Bi-Annual Work)
| Item # | Location | Estimated | Unit/Each Cost | Annual Price |
| 1 | Square yard of sealcoat | 19,500 | $0.00 | $0.00 |
| 2 | Linear foot of striping | 6,000 | $0.00 | $0.00 |
| 3 | Square foot of pothole repair | 10 | $0.00 | $0.00 |
| 4 | Linear foot of curb repair | 50 | $0.00 | $0.00 |
| 5 | Cubic yard for sidewalk repair | 1 | $0.00 | $0.00 |
| 6 | Semiannual (every 6 months) sweeping or blowing of all parking and driving areas | 53,000 | $0.00 | $0.00 |
| Year 3 Total Cost Per Year (Scheduled Work) | $0.00 |
| As Needed Basis (Work requested and performed outside of Bi-ANNUAL WORK schedule) | ||||
| Minor striping or repairs | ||||
| Item # | Location | Each | Unit/Each Cost | Price |
| 7 | Mobilization cost | 1 | $0.00 | $0.00 |
| 8 | Linear foot of striping | 500 | $0.00 | $0.00 |
| 9 | Square foot of pothole/asphalt repair, including milling if required | 10 | $0.00 | $0.00 |
| 10 | Cubic yard for sidewalk repair | 1 | $0.00 | $0.00 |
| Year 3 Total Cost (As Needed) | $0.00 | |||
| Year 3 Total Cost: | $0.00 |
IV. Year 4 - AREA #1 Cost (Bi-Annual Work)
| Item # | Location | Estimated | Unit/Each Cost | Annual Price |
| 1 | Square yard of sealcoat | 33,500 | $0.00 | $0.00 |
| 2 | Linear foot of striping | 3,100 | $0.00 | $0.00 |
| 3 | Square foot of pothole repair | 10 | $0.00 | $0.00 |
| 4 | Linear foot of curb repair | 50 | $0.00 | $0.00 |
| 5 | Cubic yard for sidewalk repair | 1 | $0.00 | $0.00 |
| 6 | Semiannual (every 6 months) sweeping or blowing of all parking and driving areas | 53,000 | $0.00 | $0.00 |
| Year 4 Total Cost Per Year (Scheduled Work) | $0.00 |
| As Needed Basis (Work requested and performed outside of Bi-ANNUAL WORK schedule) | ||||
| Minor striping or repairs | ||||
| Item # | Location | Estimated | Unit/Each Cost | Price |
| 7 | Mobilization cost | 1 | $0.00 | $0.00 |
| 8 | Linear foot of striping | 500 | $0.00 | $0.00 |
| 9 | Square foot of pothole/asphalt repair, including milling if required | 10 | $0.00 | $0.00 |
| 10 | Cubic yard for sidewalk repairs | 1 | $0.00 | $0.00 |
| Year 4 Total Cost (As Needed) | $0.00 | |||
| Year 4 Total Cost: | $0.00 |
V. Year 5 - AREA #2 Cost (Bi-Annual Work)
| Item # | Location | Estimated | Unit/Each Cost | Annual Price |
| 1 | Square yard of sealcoat | 19,500 | $0.00 | $0.00 |
| 2 | Linear foot of striping | 6,000 | $0.00 | $0.00 |
| 3 | Square foot of pothole repair | 10 | $0.00 | $0.00 |
| 4 | Linear foot of curb repair | 50 | $0.00 | $0.00 |
| 5 | Cubic yard for sidewalk repair | 1 | $0.00 | $0.00 |
| 6 | Semiannual (every 6 months) sweeping or blowing of all parking and driving areas | 53,000 | $0.00 | $0.00 |
| Year 5 Total Cost Per Year (Scheduled Work) | $0.00 |
| As Needed Basis (Work requested and performed outside of Bi-ANNUAL WORK schedule) | ||||
| Minor striping or repairs | ||||
| Item # | Location | Estimated | Unit/Each Cost | Price |
| 7 | Mobilization cost | 1 | $0.00 | $0.00 |
| 8 | Linear foot of striping | 500 | $0.00 | $0.00 |
| 9 | Square foot of pothole/asphalt repair, including milling if required | 10 | $0.00 | $0.00 |
| 10 | Cubic yard for sidewalk repair | 1 | $0.00 | $0.00 |
| Year 5 Total Cost (As Needed) | $0.00 | |||
| Year 5 Total Cost: | $0.00 |
| I. Year 1 - Total Cost Per Year | $0.00 |
| II. Year 2 - Total Cost Per Year | $0.00 |
| III. Year 3 - Total Cost Per Year | $0.00 |
| IV. Year 4 - Total Cost Per Year | $0.00 |
| V. Year 5 - Total Cost Per Year | $0.00 |
| GRAND TOTAL | $0.00 |
Page &P of &N