Exhibit_A_Price_Sheet.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Asphalt Sealing, Striping, & Sweeping Services
Solicitation number
AR 25-073-JG
Issued by
Polk County, Lake Harbor CDP, Florida

About this file

The document is a Price Sheet (Exhibit A) for an Annual Requirement (AR 25-073-JG) for Asphalt Sealing, Striping, & Sweeping Services issued by Kissimmee Utility Authority (KUA) in Florida. The contract covers asphalt maintenance and repair services for two distinct areas over a five-year period: Area #1 at 2850 and 2854 N John Young Pkwy and Area #2 at 1701 W Carroll St in Kissimmee. The scope includes sealcoating, striping, sweeping, pothole repair, curb repair, and sidewalk repair, with bi-annual scheduled work and as-needed minor repairs. The contract is structured with identical service requirements for each area across five years, with estimated quantities including 19,500-33,500 square yards of sealcoat, 3,100-6,000 linear feet of striping, and semiannual sweeping of 53,000 square feet of parking and driving areas.

The price sheet shows all line items priced at $0.00, which suggests this is a template or draft document awaiting actual pricing from a vendor. The contract allows for both scheduled bi-annual work and as-needed repairs, with specific line items for mobilization, striping, pothole/asphalt repair, and sidewalk repairs. The comprehensive pricing structure covers various maintenance activities with precise unit measurements, enabling flexible service delivery. The document indicates a comprehensive approach to parking lot and driveway maintenance, with specific requirements for surface preparation, color-coded striping (including blue for handicap spaces), and thorough site preparation such as edging and debris removal before sealing.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Acerno_Cache_XXXXX

Exhibit A Price Sheet

Exhibit A Price Sheet
AR 25-073-JG Asphalt Sealing, Striping, & Sweeping Services
Vendor Name:Carroll St area
I. Year 1 - AREA #2 Cost (Bi-Annual Work)
Item #LocationEstimatedUnit/Each CostAnnual Price
1Square yard of sealcoat19,500$0.00$0.00
2Linear foot of striping6,000$0.00$0.00
3Square foot of pothole repair10$0.00$0.00
4Linear foot of curb repair50$0.00$0.00
5Cubic yard for sidewalk repair1$0.00$0.00
6Semiannual (every 6 months) sweeping or blowing of all parking and driving areas53,000$0.00$0.00
Year 1 Total Cost Per Year (Scheduled Work)$0.00
As Needed Basis (Work requested and performed outside of Bi-ANNUAL WORK schedule)
Minor striping or repairs
Item #LocationEstimatedUnit/Each CostPrice
7Mobilization cost1$0.00$0.00
8Linear foot of striping500$0.00$0.00
9Square foot of pothole/asphalt repair, including milling if required10$0.00$0.00
10Cubic yard for sidewalk repairs1$0.00$0.00
Year 1 Total Cost (As Needed)$0.00
Year 1 Total Cost:$0.00
II. Year 2 - AREA #1 Cost (Bi-Annual Work)Lackey/Davis area
Item #LocationEstimatedUnit/Each CostAnnual Price
1Square yard of sealcoat33,500$0.00$0.00
2Linear foot of striping3,100$0.00$0.00
3Square foot of pothole repair10$0.00$0.00
4Linear foot of curb repair50$0.00$0.00
5Cubic yard for sidewalk repair1$0.00$0.00
6Semiannual (every 6 months) sweeping or blowing of all parking and driving areas53,000$0.00$0.00
Year 2 Total Cost Per Year (Scheduled Work)$0.00
As Needed Basis (Work requested and performed outside of Bi-ANNUAL WORK schedule)
Minor striping or repairs
Item #LocationEstimatedUnit/Each CostPrice
7Mobilization cost1$0.00$0.00
8Linear foot of striping500$0.00$0.00
9Square foot of pothole/asphalt repair, including milling if required10$0.00$0.00
10Cubic yard for sidewalk repairs1$0.00$0.00
Year 2 Total Cost (As Needed)$0.00
Year 2 Total Cost:$0.00

III. Year 3 - AREA #2 Cost (Bi-Annual Work)

Item #LocationEstimatedUnit/Each CostAnnual Price
1Square yard of sealcoat19,500$0.00$0.00
2Linear foot of striping6,000$0.00$0.00
3Square foot of pothole repair10$0.00$0.00
4Linear foot of curb repair50$0.00$0.00
5Cubic yard for sidewalk repair1$0.00$0.00
6Semiannual (every 6 months) sweeping or blowing of all parking and driving areas53,000$0.00$0.00
Year 3 Total Cost Per Year (Scheduled Work)$0.00
As Needed Basis (Work requested and performed outside of Bi-ANNUAL WORK schedule)
Minor striping or repairs
Item #LocationEachUnit/Each CostPrice
7Mobilization cost1$0.00$0.00
8Linear foot of striping500$0.00$0.00
9Square foot of pothole/asphalt repair, including milling if required10$0.00$0.00
10Cubic yard for sidewalk repair1$0.00$0.00
Year 3 Total Cost (As Needed)$0.00
Year 3 Total Cost:$0.00

IV. Year 4 - AREA #1 Cost (Bi-Annual Work)

Item #LocationEstimatedUnit/Each CostAnnual Price
1Square yard of sealcoat33,500$0.00$0.00
2Linear foot of striping3,100$0.00$0.00
3Square foot of pothole repair10$0.00$0.00
4Linear foot of curb repair50$0.00$0.00
5Cubic yard for sidewalk repair1$0.00$0.00
6Semiannual (every 6 months) sweeping or blowing of all parking and driving areas53,000$0.00$0.00
Year 4 Total Cost Per Year (Scheduled Work)$0.00
As Needed Basis (Work requested and performed outside of Bi-ANNUAL WORK schedule)
Minor striping or repairs
Item #LocationEstimatedUnit/Each CostPrice
7Mobilization cost1$0.00$0.00
8Linear foot of striping500$0.00$0.00
9Square foot of pothole/asphalt repair, including milling if required10$0.00$0.00
10Cubic yard for sidewalk repairs1$0.00$0.00
Year 4 Total Cost (As Needed)$0.00
Year 4 Total Cost:$0.00

V. Year 5 - AREA #2 Cost (Bi-Annual Work)

Item #LocationEstimatedUnit/Each CostAnnual Price
1Square yard of sealcoat19,500$0.00$0.00
2Linear foot of striping6,000$0.00$0.00
3Square foot of pothole repair10$0.00$0.00
4Linear foot of curb repair50$0.00$0.00
5Cubic yard for sidewalk repair1$0.00$0.00
6Semiannual (every 6 months) sweeping or blowing of all parking and driving areas53,000$0.00$0.00
Year 5 Total Cost Per Year (Scheduled Work)$0.00
As Needed Basis (Work requested and performed outside of Bi-ANNUAL WORK schedule)
Minor striping or repairs
Item #LocationEstimatedUnit/Each CostPrice
7Mobilization cost1$0.00$0.00
8Linear foot of striping500$0.00$0.00
9Square foot of pothole/asphalt repair, including milling if required10$0.00$0.00
10Cubic yard for sidewalk repair1$0.00$0.00
Year 5 Total Cost (As Needed)$0.00
Year 5 Total Cost:$0.00
I. Year 1 - Total Cost Per Year$0.00
II. Year 2 - Total Cost Per Year$0.00
III. Year 3 - Total Cost Per Year$0.00
IV. Year 4 - Total Cost Per Year$0.00
V. Year 5 - Total Cost Per Year$0.00
GRAND TOTAL$0.00

Page &P of &N