This is a draft site plan for the Gold Lot Parking Development, a component of the Terminal Modernization Development Project at Cleveland Hopkins International Airport, prepared by Paslay Group and involving multiple design and engineering partners. The document depicts two potential wildlife fencing configuration options for a new long-term parking facility with a total of 1,602 parking spaces, including 28 accessible spaces (5 of which are van-accessible). The plan shows detailed parking lot layout adjacent to Concourse D, with proposed shuttle routes, a covered walkway, and considerations for existing infrastructure like drainage swales and airport operational areas.

The site plan is marked as a draft dated 04/03/2025, with two alternative wildlife fence placement options: Option I places the fence 10 feet offset from Concourse D, while Option II positions the fence directly along Concourse D. The design includes provisions for maintaining existing turboprop loading walkways, removing sections of existing fencing, and integrating new pedestrian routes. Additional notes specify shuttle service will utilize the taxi road, and the existing covered walkway will be removed after the existing headhouse is decommissioned. The plan appears to be part of a broader airport modernization and infrastructure improvement initiative.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAIN DRIVE AISLE

X X X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

XXXXXX

X X

X X

X X X

X X X

X

SS

4" G

AS

4"G A

S

E E

E

EE

E E

E

E E E

GAS

HOUSE

10"GAS

10"GAS

10"GAS

4"GAS

10"G A

S

1 STORY

BRICK

BUILDING

ALUMINUM

HANGAR"AIR

SERVICES"

BUILDING

GV

FAA

FAA

FAA

FAA

FAA

FAA

FAA

FAA

FAA

FAA

FAA

W V

W

VW

V

W V

W V

W V

W V W

V

T

CONC. RET. WALL

CONC. RET WALL

CONC. RET WALL

CONC. B

RIDGE PIER

CONC. RET W

ALL

C O

N C

. R

ET W

ALL

C O

N C

. R E

T W

A

LL

C O

N C

. R E

T W

A

LL

CONC. RET W

ALL

CONC. RET WALL

CONC. RET WALL

CONC. PAD

CONC. PAD

CONC. WALL

C O

N C

. R E

T W

A

LL

T

T

L

GV

GV

GV

GV

T

T

T

T

T

T

W

L

Total Parking Spaces Long Term: 1602, including 28 Accessible (5 van)

SHELTER (TYP)

PROPOSED SHUTTLE ROUTE

PROPOSED SHUTTLE ROUTE

COVERED WALKWAY

CONSIDER BLAST WALL

ALONG WALKWAY

ADJACENT TO AIRFIELD

EXISTING DRAINAGE SWALE

TO BE ENCLOSED AND STORM

SEWER RECONFIGURED TO

MAINTAIN POSITIVE DRAINAGE

GATE TO BE REMOVED OR RELOCATED

MEET EXISTING SIDEWALK

NEW WILDLIFE FENCING TO

SEPARATE PARKING FROM AOA

REMOVE SECTIONS

OF EXISTING FENCING

X X

X X

X X

X X

X

X X X X

X

X

X

X X

X X

X

X X

JACKSON RD

FIVE PO

INTS RD

CARG

O

RD

PARK RD

C O

M M

E R

C

IA

L V E

H

IC

LE

R

D

TE

R

M

IN

A L D

R

125 93 75

294 273

CONCOURSE D

EXISTING CONCOURSE C EXISTING

HEADHOUSE

EXISTING GARAGE

EXISTING

ORANGE LOT

MAINTAIN 10 ' (MIN) SEPARATION

FROM BUILDING AND TURBOPROP

LOADING WALKWAYS (TYP)

XX XX

X X

X X

XX XX

X X

X X

XX

X X

X X

XX XX

X X

X X

XX XX

X X

X X

X X

X X

X X

X X

X X

X X

JWB

TERMINAL MODERNIZATION DEVELOPMENT PROJECT

GOLD LOT PARKING DEVELOPMENT PLAN

TURBOPROP LOADING WALKWAYS TO REMAIN - OPTION I: WILDLIFE FENCE 10FT OFFSET FROM CONCOURSE D

NOTES:

1) SHUTTLE SERVICE FOR TEMPORARY SURFACE LOT TO UTILIZE TAXI ROAD

2) COVERED WALKWAY ALONG THE EXISTING TAXI ROAD TO BE REMOVED AFTER EXISTING HEADHOUSE IS

DECOMMISSIONED. REMAINING WALKWAY TO BE INTEGRATED WITH PEDESTRIAN ROUTE TO NEW HEADHOUSE.

Feet 0 100 2003/20/2025

DRAFT

04/03/2025

ErikMoorhead Text Box NOTE: ACCORDING TO CLE THERE NEEDS TO BE AN ADDITIONAL 10' OFFSET OF ANY PARKED VEHICLES FROM ANY WILDLIFE FENCE. VERIFY PARKING LAYOUT AND TOTAL SPACES TAKING THIS REQUIREMENT INTO ACCOUNT.

MAIN DRIVE AISLE

X X X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

XXXXXX

X X

X X

X X X

X X X

X

SS

4" G

AS

4"G A

S

E E

E

EE

E E

E

E E E

GAS

HOUSE

10"GAS

10"GAS

10"GAS

4"GAS

10"G A

S

1 STORY

BRICK

BUILDING

ALUMINUM

HANGAR"AIR

SERVICES"

BUILDING

GV

FAA

FAA

FAA

FAA

FAA

FAA

FAA

FAA

FAA

FAA

FAA

W V

W

VW

V

W V

W V

W V

W V W

V

T

CONC. RET. WALL

CONC. RET WALL

CONC. RET WALL

CONC. B

RIDGE PIER

CONC. RET W

ALL

C O

N C

. R

ET W

ALL

C O

N C

. R E

T W

A

LL

C O

N C

. R E

T W

A

LL

CONC. RET W

ALL

CONC. RET WALL

CONC. RET WALL

CONC. PAD

CONC. PAD

CONC. WALL

C O

N C

. R E

T W

A

LL

T

T

L

GV

GV

GV

GV

T

T

T

T

T

T

W

L

Total Parking Spaces Long Term: 1602, including 28 Accessible (5 van)

SHELTER (TYP)

PROPOSED SHUTTLE ROUTE

PROPOSED SHUTTLE ROUTE

COVERED WALKWAY

CONSIDER BLAST WALL

ALONG WALKWAY

ADJACENT TO AIRFIELD

EXISTING DRAINAGE SWALE

TO BE ENCLOSED AND STORM

SEWER RECONFIGURED TO

MAINTAIN POSITIVE DRAINAGE

GATE TO BE REMOVED OR RELOCATED

MEET EXISTING SIDEWALK

NEW WILDLIFE FENCING TO

SEPARATE PARKING FROM AOA

REMOVE SECTIONS

OF EXISTING FENCING

X X

X X

X X

X X

X

X X X X

X

X

X

X X

X X

X

X X

JACKSON RD

FIVE PO

INTS RD

CARG

O

RD

PARK RD

C O

M M

E R

C

IA

L V E

H

IC

LE

R

D

TE

R

M

IN

A L D

R

125 93 75

294 273

CONCOURSE D

EXISTING CONCOURSE C EXISTING

HEADHOUSE

EXISTING GARAGE

EXISTING

ORANGE LOT

MAINTAIN 10 ' (MIN) SEPARATION

FROM BUILDING AND TURBOPROP

LOADING WALKWAYS (TYP)

XX XX

XXXXXX XX

JWB

TERMINAL MODERNIZATION DEVELOPMENT PROJECT

GOLD LOT PARKING DEVELOPMENT PLAN

TURBOPROP LOADING WALKWAYS TO REMAIN - OPTION II: WILDLIFE FENCE ALONG CONCOURSE D

NOTES:

1) SHUTTLE SERVICE FOR TEMPORARY SURFACE LOT TO UTILIZE TAXI ROAD

2) COVERED WALKWAY ALONG THE EXISTING TAXI ROAD TO BE REMOVED AFTER EXISTING HEADHOUSE IS

DECOMMISSIONED. REMAINING WALKWAY TO BE INTEGRATED WITH PEDESTRIAN ROUTE TO NEW HEADHOUSE.

Feet 0 100 2003/20/2025

DRAFT

04/03/2025

Sheets and Views
Layout2

File details come from the government source that posted it. Updated .