250318_CLE_Gold_Lot_Figure_1_2025.03.18.pdf
PDF 1 MB Posted
- Attached to
- Gold Lot Surface Parking Facility
- Solicitation number
- TMDP-01
- Issued by
- Cuyahoga County, Ohio
About this file
This draft document is a site plan for the Terminal Modernization Development Project's Gold Lot Parking Development at Cleveland Hopkins International Airport (CLE), prepared by Paslay Group and associated consultants. The plan depicts a comprehensive parking facility design for Option 1, which maintains existing turboprop loading walkways, with a total of 1,642 long-term parking spaces, including 28 accessible spaces (5 of which are van-accessible). The site plan includes detailed infrastructure elements such as proposed shuttle routes, wildlife fencing, concrete retaining walls, and modifications to existing roadways like Jackson Road, Cargo Road, and Park Road. The document is dated 03/18/2025 and marked as a draft, suggesting the plan is in a preliminary design phase.
The parking development plan integrates with existing airport infrastructure, including Concourse C, the existing headhouse, and an existing parking garage. Key design considerations include maintaining a 10-foot minimum separation from buildings and loading walkways, removing sections of existing fencing, and reconfiguring storm drainage systems. The plan also notes a proposed covered walkway and considerations for a blast wall adjacent to the airfield. The design appears to be part of a broader terminal modernization effort, with potential phased implementation indicated by notes about temporary surface lot shuttle services and future walkway modifications.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MAIN DRIVE AISLE
X X X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
XXXXXX
X X
X X
X X X
X X X
X
SS
4" G
AS
4"G A
S
E E
E
EE
E E
E
E E E
GAS
HOUSE
10"GAS
10"GAS
10"GAS
4"GAS
10"G A
S
1 STORY
BRICK
BUILDING
ALUMINUM
HANGAR"AIR
SERVICES"
BUILDING
GV
FAA
FAA
FAA
FAA
FAA
FAA
FAA
FAA
FAA
FAA
FAA
W V
W
VW
V
W V
W V
W V
W V W
V
T
CONC. RET. WALL
CONC. RET WALL
CONC. RET WALL
CONC. B
RIDGE PIER
CONC. RET W
ALL
C O
N C
. R
ET W
ALL
C O
N C
. R E
T W
A
LL
C O
N C
. R E
T W
A
LL
CONC. RET W
ALL
CONC. RET WALL
CONC. RET WALL
CONC. PAD
CONC. PAD
CONC. WALL
C O
N C
. R E
T W
A
LL
T
T
L
GV
GV
GV
GV
T
T
T
T
T
T
W
L
Total Parking Spaces Long Term: 1642, including 28 Accessible (5 van)
SHELTER (TYP)
PROPOSED SHUTTLE ROUTE
PROPOSED SHUTTLE ROUTE
COVERED WALKWAY
CONSIDER BLAST WALL
ALONG WALKWAY
ADJACENT TO AIRFIELD
EXISTING DRAINAGE SWALE
TO BE ENCLOSED AND STORM
SEWER RECONFIGURED TO
MAINTAIN POSITIVE DRAINAGE
GATE TO BE REMOVED OR RELOCATED
MEET EXISTING SIDEWALK
NEW WILDLIFE FENCING TO
SEPARATE PARKING FROM AOA
REMOVE SECTIONS
OF EXISTING FENCING
XX XX
XXXXXX XX
X X
X X
X X
X X
X
X X X X
X
X
X
X X
X X
X
X X
JACKSON RD
FIVE PO
INTS RD
CARG
O
RD
PARK RD
P A
R K
R D
TE
R
M
IN
A L D
R274225
125 93 76
294 273
CONCOURSE D
EXISTING CONCOURSE C EXISTING
HEADHOUSE
EXISTING GARAGE
EXISTING
ORANGE LOT
MODIFICATIONS TO LOT
REQUIRED IN STEP 2
TO ACCOMMODATE PROPOSED
EGRESS ROADWAYS
MAINTAIN 10 ' (MIN) SEPARATION
FROM BUILDING AND TURBOPROP
LOADING WALKWAYS (TYP)
JWB
TERMINAL MODERNIZATION DEVELOPMENT PROJECT
GOLD LOT PARKING DEVELOPMENT PLAN
OPTION 1: TURBOPROP LOADING WALKWAYS TO REMAIN
NOTES:
1) SHUTTLE SERVICE FOR TEMPORARY SURFACE LOT TO UTILIZE TAXI ROAD
2) COVERED WALKWAY ALONG THE EXISTING TAXI ROAD TO BE REMOVED AFTER EXISTING HEADHOUSE IS
DECOMMISSIONED. REMAINING WALKWAY TO BE INTEGRATED WITH PEDESTRIAN ROUTE TO NEW
HEADHOUSE.
Feet 0 100 2003/20/2025
DRAFT
03/18/2025
| Sheets and Views |
| Layout2 |
File details come from the government source that posted it. Updated .