Exhibit A - Comprehensive Recycling Plan.docx

DOCX document 26 KB Posted

Attached to
Abrasive Blast Media Lease and Recycling Service
Solicitation number
RFQ - 15A - 11122800000000000586
Issued by
Androscoggin County, Maine

About this file

This document is Exhibit A of a contract requirement for the State of Maine regarding an Abrasive Blast Media Lease and Recycling Service. The exhibit establishes mandatory specifications for a Comprehensive Recycling Plan (CRP) that the subcontractor must submit to demonstrate their capability to process recyclable materials covered under the contract. The CRP must include a complete list of all facilities utilized for processing recyclable materials into marketable products, identification of the recycled products produced and any by-products generated, and documentation that a viable market exists for these products in accordance with federal regulations under 40 CFR 261.2(f). The subcontractor must provide analysis data regarding contaminants present in the final products resulting from waste processing.

The plan must detail the primary recycling processes at each facility, including material receiving, storage, and tracking procedures. Flow charts should be used to illustrate the functional relationships between multiple facilities when applicable. A Recycling Facility Questionnaire is required for each facility involved in processing the recyclable materials. The exhibit references an example Recycling Plan outline with visual components intended to guide subcontractors in preparing their submissions, though the specific details of these example outlines are referenced but not fully detailed in this document.

View the file

Other files

File Type Posted
Solicitation Narrative[1].docx DOCX document
Exhibit H - Incident-Situation Alert Response.docx DOCX document
Exhibit C - Cert of Environmental Compliance.docx DOCX document
Solicitation_terms.docm DOCM document
Questions and Answers.doc DOC document
Exhibit F - Cert Regarding Debartment.doc DOC document
Exhibit D - C of C for New Plastic Materials.docx DOCX document
Exhibit E - Cert of Regulatory Compliance.docx DOCX document
Exhibit B - Recycling Facility Questionnaire.docx DOCX document
Exhibit G - Cert of Final Recycling.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT A – COMPREHENSIVE RECYCLING PLAN

The Subcontractor must submit a Comprehensive Recycling Plan (CRP) for the materials covered by the contract. The CRP must:

· Include a list of all facilities used to process the recyclable materials into marketable product(s)

· Include a list of the recycled product(s) produced, and any by-products generated from the recycling process.

· Demonstrate a viable market exists for these product(s) in accordance with the requirements of 40 CFR 261.2(f)

· Include analysis data of contaminants contained in the product as a result of using the waste.

· The CRP must also identify the primary process, including material receiving and storage tracking, used at each facility to handle the recyclable materials or by-products. Flow charts should be used to describe the functional relationships between the facilities, if possible.

· Additionally, a Recycling Facility Questionnaire must be submitted for each facility used to process the recyclable materials.

An example Recycling Plan outline is provided below:

Plan Details image1.emf image2.emf

File details come from the government source that posted it. Updated .