Exhibit 8 - Project Experience.pdf
PDF 18 KB Posted
- Solicitation number
- EQ10PCPB1-21-0016
About this file
This solicitation is for construction services to upgrade accessibility and renovate tenant spaces in the Seattle Federal Office Building. The General Services Administration requires the contractor to bring the building into compliance with ABAAS accessibility standards and consolidate office spaces for the Housing and Urban Development and Department of Labor agencies. Specifically, HUD will reduce its space from 67,360 square feet to approximately 30,534 square feet on the third and part of the fourth floors. DOL will reduce its space from 74,832 square feet to approximately 28,000 square feet on part of the lower level, part of the first floor, and all of the second floor after relocating from its current leased location. The contractor must coordinate construction phasing to maintain no fewer than two means of egress from occupied spaces at all times. Substantial completion for the DOL tenant improvements is required by August 15, 2023 to allow for its full occupancy and vacation of its current leased location prior to the expiration of that lease.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Title
Date Completed or % Complete to date
Location
Original Contract Amount $
Final Contract Amount: $
Design Contract Type: _____FFP ___Cost ____ Other (Specify)
Construction Project Contract Type: ____FFP ____Cost _____Other (Specify)
Number of Change Orders:
Total Dollar Value of Change Orders $
Construction Project Delivery Method:
___DB or Bridging ____DBB ___CMc ____ Other (Specify)
Complexity of Project
______Difficult _____Routine
Construction Project Size :
(a) Total Gross Square Footage (b) $ Amount:
Designer Role: Primary or Subcontractor
Project Owner Contact Information:
POC Individual Name POC Title
POC Organization Name
POC Address
POC Phone Number POC Email
Summary of Actual Performance Under Scope Describe type of project, tasks performed, and challenges
(State how the project meets the Relevant Experience Criteria of similar construction projects)
Note: Continuation pages up to 2 additional may be added
Work Performed Expressed as a Percentage (%) of the Total Project Scope
RELEVANT PROJECT EXPERIENCE
| 3. Draft DB Agreement_FOB Ext.pdf |
| (1) FAR 52.222-99 Establishing a Minimum Wage for Contractor (JUL 2014) (DEVIATION) |
| (2) FAR 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts (SEP 2013) |
| (3) FAR 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items (MAY 08) |
| 1e.Exhibit 4_Interrelationship Matrix_FOB Ext.pdf |
| Exhibit 4 – Inter-relationship Matrix |
| 1b. Exhibit 1B_Designer Proj Exp.PP Eval.pdf |
| Project Title |
| Work Performed Expressed as a Percentage (%) of the Total Project Scope |
File details come from the government source that posted it. Updated .