Exhibit 7-1 to Sample Contract_DEQ Permit Req.pdf
PDF 1 MB Posted
- Attached to
- US101: Trask River Bridge Proj.
- Solicitation number
- S-73000-00016851
- Issued by
- Tillamook County, Oregon
About this file
This is an Erosion and Sediment Control Plan (ESCP) cover sheet and permit requirements document for the Oregon Department of Transportation (ODOT) US 101 Trask River Bridge Project located in unincorporated Tillamook County, Oregon. The project involves repair and stabilization work on a 336-foot bridge built in 1949 that has experienced significant erosion and channel migration, with scour holes on the south side of Bent 5. The scope includes extending riprap at the abutments for scour repair, placement of large woody material and willow stakes to reduce scour and redirect flow, and riprap toe anchor placement. The total disturbed area is 0.85 acres. The project is divided into two phases with distinct Erosion and Sediment Control Plan sheets (DEQ03 through DEQ03 and FA01-FA02 for final landscaping stabilization). The receiving water body is the Trask River, and the soil classification is Nehalem Silt Loam. The engineering and survey firm is DOWL (Lake Oswego, OR), with contact Tyler Klein at (503) 620-6103.
The ESCP must comply with Oregon's NPDES 1200-CA permit requirements and Oregon Standard Specifications Section 00280. The contractor is responsible for constructing, maintaining, and upgrading all erosion and sediment control measures throughout project duration. Inspection requirements include daily inspections when practicable at discharge points, weekly inspections during active stormwater runoff periods, and monthly inspections at minimum regardless of weather. The document specifies 42 distinct permit requirements covering BMPs including sediment fencing, inlet protection, slope drains, stabilization measures, concrete washout areas, spill prevention, dewatering plans, and dust control. The ESCP and all revisions must be retained on site and made available to DEQ, agents, or local municipalities upon request. Pre-construction meetings must be held with all project personnel to discuss erosion and sediment control measures, and inspection logs must be maintained in accordance with 1200-CA permit requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00016231_Att B_Sample Public Improvement Contract~1.docx | DOCX document | |
| Exh 5 to Sample Contract_Specs.docx | DOCX document | |
| Exhibit 7-4 to Sample Contract_County Floodway Development Permit.pdf | ||
| Exhibit 7-2 to Sample Contract_DSL Permit.pdf | ||
| 00016851_Att B_Sample Public Improvement Contract.docx | DOCX document | |
| K20448_HG02_Add2.pdf | ||
| Exhibit 7-3 to Sample Contract_Army Corps Permit.pdf | ||
| 00016851_ITB.docx | DOCX document | |
| Exh 6 to Sample Contract_Plans.pdf | ||
| 00016851_Q and A_6.15.docx | DOCX document | |
| 00016851_Att A-2_Bid Pricing Form.xlsx | XLSX spreadsheet | |
| Updated Contaminated Soil Location Table 00294-1.docx | DOCX document | |
| 00016851_Att A-2_Bid Pricing Form_REVAdd6.xlsx | XLSX spreadsheet |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET NO.
DEQ01
EE_K20448_ecdt_000.dgn :: Default 12/16/2025 1:10:36 PM rduerst Full Size 1=1 Scale: Rotation: 0°
PREPARED FOR:
NARRATIVE DESCRIPTIONS
INSPECTION FREQUENCY:
runoff from snow melt, is occurring.
Weekly when stormwater runoff, including
1. Active period in anticipation of site inaccessibility.
2. Prior to the site becoming inactive or teen (14) consecutive calendar days.
3. Inactive periods greater than four-weather.
inaccessible due to inclement
4. Periods during which the site is unlikely due to frozen conditions.
5. Periods during which discharge is
ATTENTION EXCAVATORS
EROSION AND SEDIMENT CONTROL GENERAL NOTES
must be made prior to leaving the site.
Any necessary maintenance and repair control measures are in working order.
Once to ensure that erosion and sediment
SITE CONDITION MINIMUM FREQUENCY
Once every month.
point or downstream location.
at a relevant and accessible discharge
If practical, inspections must occur daily make discharges likely.
upon melt, or when weather conditions
Monthly. Resume monitoring immediately
SHEET NO. DESCRIPTION
DEQ - ESCP Cover SheetDEQ01
DEQ - 1200CA Permit RequirementsDEQ02
Total Disturbed Area = 0.85 Acres
SURVEYING FIRM
PLANNING / ENGINEERING /
SITE SOIL CLASSIFICATION:
Install measures within the the right-of-way unless directed otherwise.
applicable water standard laws.
water does not enter the roadway or drainage system, or violate in such a manner to ensure that sediment and sediment laden activities and in segments applicable to each staging phase. Construct for Construction. Implement this plan for all clearing and grading as required by Section 00280 of the Oregon Standard Specifications
Develop a revised plan of the Erosion and Sediment Control measures laden water does not leave the site.
unexpected storm events to ensure that sediment and sediment-anticipated site conditions. Adjust or upgrade these measures for
Erosion and Sediment Control measures shown on this plan are for and the NPDES 1200-CA permit.
or Constructionof the Oregon Standard Specifications f contractor for the duration of the project to comply with Section 00280 erosion and sediment control measures is the responsibility of the
The construction, adjustment, maintenance, and upgrading of these
STANDARD DRAWINGS
RD1070
RD1065
RD1060
RD1055
RD1050
RD1045
RD1040
RD1033
RD1032
RD1031
RD1030
RD1015
RD1010
RD1006
RD1005
RD1000
Concrete Truck Wash Out
Sediment Trap
Tire Wash Facility Type 1 and 2
Slope and Channel Matting
Temporary Scour Basin / Energy Dissipator
Temporary Slope Drain With Energy Dissipator
Sediment Fence
Sediment Barrier Type 9
Sediment Barrier Type 8
Sediment Barrier Type 5 and 6
Sediment Barrier Type 2, 3 and 4
Inlet Protection Type 4
Inlet Protection Type 2, 3, 6, 7 10 and 11
Check Dams Type 2 and 6
Check Dams Type 1, 3 and 4
Construction Entrances
** Signifies BMP that will be installed prior to any ground disturbing activity.
* Signifies additional BMP's required for work within 50' of water of the state.
RATIONALE STATEMENT
EROSION AND SEDIMENT CONTROL SHEET INDEX
Phone: 503- 229-5279
Portland, OR 97232
700 NE Multnomah St. Stuite 600
Oregon Dept. of Environmental Quality consecutive calendar days, retain the ESCP at the construction site or at another location.
DEQ, agent, or the local municipality. During inactive periods of greater than seven (7)
Retain a copy of the ESCP and all revisions on site and make it available on request to
Inspection logs must be kept in accordance with DEQ's 1200-CA permit requirements.
All inspections must be made in accordance with DEQ 1200-CA permit requirements.
inspector to discuss erosion and sediment control measures and construction limits.
Hold a pre-construction meeting of project construction personnel that includes the whether stormwater runoff is occurring.
At least once every month, regardless of
BMP MATRIX FOR CONSTRUCTION PHASES
for a comprehensive list of available BMP's
Refer to DEQ Guidance Manual and ODOT's Erosion Control Manual
OF TRANSPORTATION
OREGON DEPARTMENT F
O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
Drafted By:
Prepared By:
these rules by calling 503-232-1987.
commencing an excavation. Call 503-246-6699. You may obtain copies of two business days before you to notify the utility notification center at least
Oregon law, OAR 952-001-0010 through OAR 952-001-0090, requires
ST. HELENS
ASTORIA
TILLAMOOK
MCMINNVILLE
ALBANYNEWPORT
CORVALLIS
HOOD
RIVER
DALLES
THE
MADRAS
PRINEVILLE
BEND
COQUILLE
GRANTS
PASS
Ashland
BURNS
KLAMATH
FALLS
CONDON
MORO
PENDLETON
LA GRANDE
ENTERPRISE
VALE Ontario
PORTLAND
SALEM
MEDFORD
EUGENE
ROSEBURG
Athena
N. Powder
Unity Dayville
Sisters
Juntura
Frenchglen
Burns Jct.
McDermitt
Paisley
La Pine
Crescent
Biggs
Lexington
Hermiston Boardman
Ukiah
Arlington
Malin
Brookings
Coos Bay
Drain
Canyonvil le
Reedsport
Oakridge
Goshen Florence
Lincoln City
Waldport
Home Sweet
Detroit Antelope
Maupin
Forest Grove
Hebo
Cannon Beach
Seaside Rainier
Milton-Freewater
W
26 35 197
39519
3953197
Bonanza
Junction City
BAKER CITY
HEPPNER
Copperfield
Lake Silver
Junction CaveBEACH
GOLD
Orford Port
LAKEVIEW
CANYON
CITY
Day John
CITY
OREGON
HILLSBORO
DALLAS
Redmond
Val ley Jordan
VICINITY MAP
Phase 1
Phase 1 ESCP Sheets
DEQ03 DEQ - Contractor's Notes
FA01- FA02
& Landscape Stabilization
Final
Soil description: Nehalem Silt Loam
RECEIVING WATER BODIES: Trask River
HAZARDOUS MATERIALS: N/A
redirect flow.
well as willow stakes will be installed to reduce scour and placement of a riprap toe anchor. Large woody material as abutment protection upstream at the abutments and
Proposed scour repair includes extending the riprap
Developed Conditions:
depositional mound between Bents 5 and 6.
revealed a scour hole on the south side of Bent 5 with and channel migration. A recent hydraulic site observation bridge built in 1949 has been subject to significant erosion unincorporated Tillamook County. The 336-foot long located approximately two miles south of Tillamook in
The US 101 (Oregon Coast Highway) Trask River bridge is
Existing Site Conditions:
Erosion Control Details
Phase 2 ESCP Sheets
Roadside Development Restoration Plan
DATE: January 2026 submitted by the prime contractor for the on-site work.
progresses and there is a need to revise the ESC plan, an action plan will be constraints, accessibility to the site, and other related conditions, as the project this project based on specific site conditions, including soil conditions topographic determined to not effectively manage erosion prevention and sediment control for control plan. Some of the above listed BMP's were not chosen because they were
DEQ's guidance manual has been reviewed to complete this erosion and sediment
A comprehensive list of available best management practices (BMP) options based on
Matthew Phillips
Rachel Duerst
US101: TRASK RIVER BRIDGE PROJ.
DEQ COVER SHEET
OREGON COAST HWY.
TILLAMOOK COUNTY
1200-CA permit supercedes requirements of this plan.
ESCP and general conditions have been developed to facilitate compliance with the
The permittee is required to meet all the conditions of the 1200-CA permit. This
WWW.DOWL.COM
X
SITE MAP
Concrete washout area
Spill kit onsite
Hazard waste management
Construction entrance
Inlet protection
Straw wattles
Permanent stabilization hydroseed)
(Straw mulch/
Temporary stabilization
Dust control
Plastic sheeting
X
X
X
X
X
X
X
X
X
X
X
X
FB02
FB03
FB01
Phase 2
Phone: (503) 620-6103
Address: Lake Oswego, OR 97035
Address: 5 Centerpointe Dr. #350
Contact: Tyler Klein
Engineering & Survey Firm: DOWL
Earthwork, Clearing, Demolition, BMP Name
For Information Only
NOT TO SCALE
For Information Only
NOT TO SCALE
EE_K20448_ecdt_000.dgn :: Default 12/16/2025 1:10:36 PM rduerst
DEQ02
EE_K20448_ecdt_00.dgn :: Default 12/16/2025 1:11:51 PM rduerst Full Size 1=1 Scale: Rotation: 0°
OF TRANSPORTATION
OREGON DEPARTMENT F
O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
Drafted By:
Prepared By:
Matthew Phillips
Rachel Duerst
US101: TRASK RIVER BRIDGE PROJ.
DEQ COVER SHEET
OREGON COAST HWY.
TILLAMOOK COUNTY
WWW.DOWL.COM
1200CA PERMIT REQUIREMENTS
13.3.7) prevent the discharge of pollutants (e.g., secondary containment). (1200-CA Permit Section prevent exposure of wastes to precipitation, or (2) a similarly effective means designed to do not have lids, provide either (1) cover (e.g., a tarp, plastic sheeting, temporary roof) to day for those containers that are actively used throughout the day. For waste containers that
Keep waste container lids closed when not in use and close lids at the end of the business 19.
Permit Section 13.3.7)
Establish material and waste storage areas, and other non-stormwater controls. (1200-CA 18.
utility pole pads.(1200-CA Permit Sections 13.2.20 and 13.2.21) required for areas that are intended to be left unvegetated, such as dirt access roads or areas as grading progresses. Temporary or permanent stabilizations measures are not
Apply temporary and/or permanent soil stabilization measures immediately on all disturbed 17.
concrete work. (1200-CA Permit Section 13.2.14)
Establish concrete truck and other concrete equipment washout areas before beginning 16.
CA Permit Sections 13.2.6 and 13.2.13) drain inlets at all times during construction, both internally and at the site boundary. (1200-
Control sediment as needed along the site perimeter and at all operational internal storm 15.
13.2.16) and downstream channels and stream banks. (1200-CA Permit Sections 13.1.1. and
Control both peak flow rates and total stormwater volume, to minimize erosion at outlets 14.
13.1.3) sediment basins, traps, and barriers prior to land disturbance. (1200-CA Permit Sections
Install perimeter sediment control, including storm drain inlet protection as well as all 13.
(1200-CA Permit Section 13.2.4)
Maintain and delineate any existing natural buffer within the 50-feet of waters of the state. 12.
vegetative seed mix used. (1200-CA Permit Section 13.2.5) areas when practicable before and after grading or construction. Identify the type of
Preserve existing vegetation when practical and re-vegetate open areas. Re-vegetate open 11.
Section 13.2.1) wetlands), and other areas to be preserved, especially in perimeter areas. (1200-CA Permit to be preserved. Identify vegetative buffer zones between the site and sensitive areas (e.g., and vegetation including important trees and associated rooting zones, and vegetation areas
Identify, mark, and protect (by construction fencing or other means) critical riparian areas 10.
stormwater from bypassing controls and ponding. (1200-CA Permit Section 13.2.3)
Create smooth surfaces between soil surface and erosion and sediment controls to prevent 9.
areas from becoming a source of erosion. (1200-CA Permit Section 13.2.2)
Sequence clearing and grading to the maximum extent practical to prevent exposed inactive 8.
(1200-CA Permit Section 15.9) under specific conditions. Submit all necessary revision to DEQ or Agent within 10 days.
Submission of all ESCP revisions is not required. Submittal of the ESCP revisions is only 7.
The ESCP must be accurate and reflect site conditions. (1200-CA Permit Section 15.8)6.
Sections 15 and 15.11) measures or practices described in the ESCP is a violation of the permit. (1200-CA Permit
The permit registrant must implement the ESCP. Failure to implement any of the control 5.
Agent, or the local municipality. (1200-CA Permit Section 15.7)
Retain a copy of the ESCP and all revisions on site and make it available on request to DEQ, 4.
CA Permit Section 17.5.q)
Inspection logs must be kept in accordance with DEQ’s 1200-C permit requirements. (1200-3.
requirements. (1200-CA Permit Section 17.5) Visual monitoring inspection reports must be made in accordance with DEQ 1200-C permit 2.
(1200-CA Permit Section 15.4.c.ii) BMP installer (see 1200-CA Permit Section 15.10), as well as their individual responsibilities.
design, installation and maintenance of stormwater control measures (e.g. ESCP developer, addition, include a list of all personnel (by name and position) that are responsible for the Revise the list as appropriate until project cpompletion (1200-CA Permit Section 15.4.c.i). In site, and the areas of the site where the contractor(s) will engage in construction activities.
Once known, include a list of all contractors that will engage in construction activities on 1.
reduced by fifty percent and at completion of project. (1200-CA Permit Section 13.1.5.d) basins and sediment traps: remove trapped sediments before design capacity has been Catch basins: clean before retention capacity has been reduced by fifty percent. Sediment 37.
depth above ground height and before BMP removal. (1200-CA Permit Section 13.1.5.c) Other sediment barriers (such as biobags): remove sediment before it reaches two inches 36.
fence height and before fence removal. (1200-CA Permit Section 13.1.5.b) Sediment fence: remove trapped sediment before it reaches one third of the above ground 35.
waters or conveyance systems leading to surface waters. (1200-CA Permit Section 13.2.8) stabilized or covered, or other BMPs must be implemented to prevent discharges to surface As needed based on weather conditions, at the end of each workday soil stockpiles must be 34.
of the year. (1200-CA Permit Section 13.2) The registrant is responsible for ensuring that soils are stable during rain events at all times Temporarily stabilize soils at the end of the shift before holidays and weekends, if needed. 33.
manufacturer’s specifications. (1200-CA Permit Section 6) operating the treatment system. Operate and maintain the treatment system according to the treatment system. Obtain Environmental Management Plan approval from DEQ before discharge dispersion device design, and a sampling plan and frequency) before operating plan (including system schematic, location of system, location of inlet, location of discharge, for sediment or other pollutant removal is employed, submit an operation and maintenance If an active treatment system (for example, electro-coagulation, flocculation, filtration, etc.) 32.
13.3.5) using time-release fertilizers within any waterway riparian zone. (1200-CA Permit Section recommendations to minimize nutrient release to surface waters. Exercise caution when The application rate of fertilizers used to reestablish vegetation must follow manufacturer’s 31.
blown soil. (1200-CA Permit Section 13.2.9) Use water, soil-binding agent or other dust control technique as needed to avoid wind-30.
supplies. (1200-CA Permit Section 13.3) and storage controls, training and signage, and covered storage areas for waste and in all vehicles, regular maintenance schedule for vehicles and machinery, material delivery procedures, employee training on spill prevention and proper disposal procedures, spill kits Implement the following BMPs when applicable: written spill prevention and response 29.
13.4) groundwater seepage due to shallow excavation activities. (See 1200-CA Permit Section Provide a dewatering plan for accumulated water from precipitation and uncontaminated 28.
(See 1200-CA Permit Sections 13.2.17 and 13.2.18) If engineered soils are used on site, a sedimentation basin/impoundment must be installed. 27.
13.2.17.a)
13.2.17 and stamped by an Oregon Professional Engineer. (See 1200-CA Permit Section Provide plans for sedimentation basins that have been designed per 1200-CA Permit Section 26.
Sections 13.2.15 and 13.3) solvents, curing compounds and adhesives from construction operations. (1200-CA Permit from vehicles and machinery, as well as debris, fertilizer, pesticides and herbicides, paints, and waste handling activities. These pollutants include fuel, hydraulic fluid, and other oils equipment fueling, maintenance, and storage; other cleaning and maintenance activities;
Use BMPs to prevent or minimize stormwater exposure to pollutants from spills; vehicle and 25.
installed. (1200-CA Permit Section 13.2.12) Prevent soil compaction in areas where post-construction infiltration facilities are to be 24.
disturbed. (1200-CA Permit Section 13.2.10) Ensure that steep slope areas where construction activities are not occurring are not 23.
12 and 13.3.9) wastewater from cleanout of stucco, paint and curing compounds. (1200-CA Permit Sections Control prohibited discharges from leaving the construction site, i.e., concrete wash-out, 22.
site. (1200-CA Permit Section 13.2.7.f) When trucking saturated soils from the site, either use water-tight trucks or drain loads on 21.
activities. (1200-CA Permit Section 13.2.7) onsite, or use an exit tire wash. These BMPs must be in place prior to land- disturbing entrance, graveled (or paved) exits and parking areas, gravel all unpaved roads located Prevent tracking of sediment onto public or private roads using BMPs such as: construction 20.
13.2.21) unless needed for long term use following project completion. (1200-CA Permit Section stabilized, all temporary erosion controls and retained moved and disposed of properly, cover of exposed areas is established. Once construction is complete and the site is Do not remove temporary sediment control practices until permanent vegetation or other 42.
CA Permit Section 13.2.20) adequate covering of compost mulch until work resumes on that portion of the site. (1200-cease for 14 days or more with a covering of blown straw and a tackifier, loose straw, or an Provide temporary stabilization for that portion of the site where construction activities 41.
Section 17.5.f.)
ceased or will be temporarily inactive for 14 or more calendar days. (1200-CA Permit Document any portion(s) of the site where land disturbing activities have permanently 40.
sediments. (1200-CA Permit Section 13.2.19) Vacuuming or dry sweeping and material pickup must be used to cleanup released The intentional washing of sediment into storm sewers or drainage ways must not occur. 39.
(1200-CA Permit Section 13.2.19.a) shall be performed according to the Oregon Department of State Lands required timeframe.
recurrence of the discharge within the same 24 hours. Any in-stream clean-up of sediment remediated. Investigate the cause of the sediment release and implement steps to prevent a Within 24 hours, significant sediment that has left the construction site, must be 38.
DEQ03
EE_K20448_ecdt_0.dgn :: Default 12/16/2025 1:12:28 PM rduerst Full Size 1=1 Scale: Rotation: 0°
OF TRANSPORTATION
OREGON DEPARTMENT F
O
T N
E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
Drafted By:
Prepared By:
Matthew Phillips
Rachel Duerst
US101: TRASK RIVER BRIDGE PROJ.
DEQ COVER SHEET
OREGON COAST HWY.
TILLAMOOK COUNTY
WWW.DOWL.COM
TABLE:
NATURE OF CONSTRUCTION ACTIVITY AND ESTIMATED TIME PRIME CONTRACTOR/DEVELOPER:
Description of experience:
Certification #
E-mail:
Fax:
Phone:
Company/Agency:
Permittee's Site Inspector
INSPECTOR INFORMATION:
Phase to be used:
Material name:
SITE:
POLLUTANT GENERATING MATERIALS ON
Fax:
Phone:
Address 2
Address 1
Contact:
Company:
Final Stabilization (Dates, From - To)
Street Construction (Dates, From - To)
Utility Installation (Dates, From - To)
Mass Grading (Dates, From - To)
Clearing (Dates, From - To)
IN-SITU RAIN GAUGE:
Or NO YES
Provide URL for Nearest Rain Gauge
ENGINEERED SOILS:
NO Used on site - YES
If yes, provided retention plan and pH monitoring schedule
EXPECTED:
LIST ALL AUTHORIZED NON-STORMWATER DISCHARGES
Construction To Contain Runoff From The Work Site.
List Any Stormwater Facilities That Will Be Used During
N/A
Construction ESCP Revisions During
DATENo. BY
, Oregon County
, R. S. , T. located in the Sec.
Tax Map#
Tax Lots
PROPERTY DESCRIPTION:
LOCATION OF OFF-SITE STAGING AREA
LOCATION OF CONCRETE TRUCK WASHOUT
County
, Oregon
File details come from the government source that posted it. Updated .