This document is an Exhibit 05 detailing Fire Department Connection (FDC) specifications and installation requirements. The technical drawing and accompanying photo provide detailed instructions for relocating and installing a fire department connection, with specific notes on implementation and testing. Key requirements include:

Installation specifications mandate 6-inch diameter bollards, clear signage identifying the FDC system type (e.g., "AUTOMATIC SPRINKLER," "STANDPIPE"), 36-inch clearance around the connection for fire department access, and ability to handle required flow rate and pressure. The contractor must verify dimensions, add specific bollards, and perform critical testing steps including system testing prior to relocation, ensuring check valves operate properly, connections are obstruction-free, and hydrostatic testing is completed following relocation.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHAPALDangL Ellipse

VHAPALDangL Image

VHAPALDangL Text Box Exhibit 05 - Fire Department Connection

VHAPALDangL Cloud

VHAPALDangL Callout FDC to move

VHAPALDangL Callout Contractor to remove bollards.

VHAPALDangL Callout Stairs to move 6' to the right.

VHAPALDangL Callout Modify handrails as needed for new location of stairs.

VHAPALDangL Rectangle

VHAPALDangL Rectangle

VHAPALDangL Rectangle

VHAPALDangL Rectangle

VHAPALOrtizI Cross-Out

VHAPALOrtizI Stamp

VHAPALDangL Text Box Exhibit 05 - Fire Department Connection

VHAPALDangL Text Box

NOTES

1. Bollards are to be 6 inches in diameter.

2. Provide clear, durable sign identifying the FDC. Sign must indicate the type of system it serves (e.g., “AUTOMATIC SPRINKLER,” “STANDPIPE”).

3. Allow clearance of 36" around FDC for fire department access.

4. Installation must be able to handle required flow rate and pressure for the system.

5. Provide inlet caps.

6. System to be tested prior to relocation. Ensure check valves operate properly and connections are free of obstructions.

7. Hydrostatic testing to be performed following relocation.