Exhibit 04_ Guardrail mods.pdf

PDF 27 MB Posted

Attached to
Site Prep for EMS Compactors, Palo Alto, California
Solicitation number
36C26125R0089
Issued by

About this file

The document is an exhibit detailing guardrail modifications for a VA construction project at the Palo Alto Health Care System. The project involves relocating an existing trash compactor approximately 5 feet to the right, creating a new 17-foot wide platform, installing removable guardrails, and modifying existing guardrail infrastructure to accommodate new equipment placement. Stairs will also be repositioned to support the Fire Department Connection (FDC) relocation.

The solicitation is a Task Order Proposal Request specifically for Veterans Integrated Service Network 21 (VISN 21) Multiple-Award Construction Contract (MACC) Group 2 contractors. The project scope includes comprehensive construction services to modify the Building 100 Loading Dock area for Environmental Management Service (EMS), involving the relocation of one existing trash compactor, installation of two new trash compactors, and a new cart wash station. A mandatory site visit is scheduled for October 2nd, 2025, at 9:00 AM PDT at the Veterans Affairs Palo Alto Health Care System, with potential offerors strongly encouraged to attend and inspect the site.

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

17' wide new platform

Existing trash compactor to move ~5' to right. GC to coordinate w/ vendor.

New platform for new compactors by Sanipak. New removable guardrail to be installed.

See equipment spec sheets for length.

Waste bins to move to temporary location at side of loading dock.

Move coordinated by

EMS.

Demo existing platform. Modify existing guardrail to provide access to relocated trash compactor.

Exhibit 04 - Guardrail Modifications

Existing guardrail at location trash compactor is to be relocated.

Guardrail to be modified.

Platform to be removed.

Stairs will move to the right for FDC relocation. Coordinate guardrail location with new location of stairs.

File details come from the government source that posted it. Updated .