This document outlines a test plan for a cash packaging system. The plan details a four-day schedule for testing the system, including visual inspections, setup activities, speed and temperature tests, package verification, and production runs using dummy bricks and cash paks. The testing will evaluate components like the seal bar, oven, cooling system, labeler, and central control station. The related federal contract opportunity is solicitation number 2031ZA23R00015 for a Cash PAK System from the Department of the Treasury Bureau of Engraving and Printing. The opportunity does not include any further pricing, response date, or award date details.

View the file

Other files for this federal contract opportunity

Other files attached to Cash PAK System, newest first.
File Type Posted
2031ZA23R00015 RFP Amendment 0001.pdf PDF
Exhibit 005 - BL-1301_Datasheet.pdf PDF
Attachment 005- 75W-08.0-04 Restricted Materials at WCF.pdf PDF
Attachment 007 site prep drawing.pdf PDF
Exhibit 004 - Drawing 30083 Cash Pak of 16000 Notes.pdf PDF
Exhibit 021 Pictures of Cash PAK System.pdf PDF
Exhibit 012 - NIST.SP.800-53r4.pdf PDF
RFP 2031ZA23R00015 Cash PAK.pdf PDF
Attachment 004 75W-08.0-02 EHS Contractor Requirements.pdf PDF
Attachment 001 Non-Disclosure Agreement.pdf PDF
Exhibit 014- FIPS-PUB-199-final.pdf PDF
Exhibit 002 - BestFlex Power BFP 1.5 and BFP 1.9 Conveyor System.pdf PDF
Attachment 008 - 75D-07.0-07 Restricted Materials at DCF.pdf PDF
Exhibit 006 - Cash Pak Holes.pdf PDF
Exhibit 010 - Cash-pak machine area.pdf PDF
Exhibit 018 - Cash-pak Drop Test.pdf PDF
Exhibit 003- Brick of 4000 Notes.pdf PDF
Exhibit 015 - DOJ Ref Mapping PIVCard Certificates to a Privileged Account Open Version.pdf PDF
Exhibit 017 - Unprinted Cashpak Label Layout Thermal Transfer Printer.pdf PDF
Exhibit 011 -TD P 85-01.xlsx XLSX spreadsheet
Attachment 006 - 75W-04.0-02 HotWorkPermits.pdf PDF
Attachment 003 - 75D-07.0-04 EHS Contractor Requirements for DCF.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hrs Day 1 Hrs Day 2 Hrs Day 3 Hrs Brick Wrapper Test Day 4 (If Applicable)

0.5 Test Procedures Review 0.5 Review Daily Test Plan 0.5 Review Daily Test Plan 0.5 Review Daily Test Plan

0.5 Visual inspection / walk-thru

0.5 Fundamental System Set Up

0.5 Demo - Element / Thermocouples Adjustment

0.5 Safety checks, interlocks

0.5 E-Stop Test

Cool Down time Check

0.5 E-Stop Test

Cool Down time Check 0.5 Drop Test 0.5 Drop Test

0.5 Daily Debrief Meeting 0.5 Daily Debrief Meeting 0.5 Daily Debrief Meeting 0.5 Closing meeting

Bricks/ Cash Paks

Plastic Wrap

Labels

Hrs Day 2 Hrs Day 3 Hrs Day 4 Hrs Day 5

0.5 Review Daily Test Plan 0.5 Review Daily Test Plan 0.5 Review Daily Test Plan 0.5 Review Daily Test Plan

0.5 Visual inspection / walk-thru

0.5 Fundamental System Set Up

0.5 Safety checks, interlocks

0.5 E-Stop Test

Cool Down time Check

0.5 Drop Test 0.5 Drop Test

0.5 Daily Debrief Meeting 0.5 Daily Debrief Meeting 0.5 Daily Debrief Meeting 0.5 Closing Meeting

Bricks

Plastic Wrap

Labels

Friday

Day

Morning D em on st ra tio n

D ay

D em on st ra tio n D ay / P ro du ct on

R un

Pr od uc tio n R un D ay

Afternoon

FIT WK 1 Monday Tuesday Wednesday Thursday

BEP Travel Day

1.0 Visual inspection / walk-thru

3.0

Recovery verification Barcode Reader

Cash-Pak Labelers (option to buy)

6.5

Production Run Speed Test

Temperature Readings Package verification

1.0 Fundamental System Set Up

1.5 components overview.

-Seal bar

-Oven -Cooling system

-Labeler.

- Fill Set up Roll change desmostration (ergonomics)

2.5

Components Overview.

-Barcode reader

-Seal bar -Oven

-Cooling system -Compression Unit

-Labeler.

- Fill Set up Roll change desmostration

(ergonomics)

- Central Control Station

3.5

Speed Test Temperature Readings

Package verification

3.5 Production Run

Brick Wrapper

1.5 Safety checks, interlocks

Jam and Error recovery

D em on st ra tio n D ay / P ro du ct on

R un

Drop Test 10 cash paks

Brick Wrap Unit. 320 Bricks = 1 skid Paper Bank Note Cream Paper Bank Note Cream Paper Bank Note Cream Paper Bank Note Cream Paper

1 roll - blue plastic wrap 1 roll - blue plastic wrap

Materials Required

80 Dummy Bricks - 20 Cash-Pak 160 Dummy Bricks - 40 Cash-Pak 320 Dummy bricks - 80 Cash-Paks

1 roll - blue plastic warp 1 roll - green plastic wrap 1 roll - green plastic wrap

BAT WK 1 Monday Tuesday Wendesday Thursday Friday unprinted labels printed labels serial number printed labels serial number printed lables federal bank eagle printed lables federal bank eagle

Day

Pr od uc tio n R un D ay

Pr od uc tio n R un D ay

Pr od uc tio n R un D ay

Pr od uc tio n R un D ay

D em on st ra tio n D ay

Morning

3.0

Afternoon 4.0

Speed Test Temperature Readings Package Verification

3.5 Production Run

Brick Wrapper

Recovery verification Barcode Readers

Cash-Pak Labelers (Option to buy)

6.5

Production Run Speed Test

Temperature Readings Package verification

Cash-Pak Labelers (Option to buy)

6.5

Production Run 1600 SNI bricks

1600 Regular production Durability

Package verification Cash-Pak Labelers (Option to buy)

3200 Bricks regular production $100, $20 1600 $100 regular production- 400 Cash-Paks 1600 SNI bricks - 400 Cash-Paks 1600 SNI bricks - 400 Cash-Paks 1600 $20 regular production - 400 Cash-Paks 1600 Regular production - 400 Cash-Paks

1.5 components overview.

-Seal bar

-Oven -Cooling system

-Labeler.

- Fill Set up Roll change desmostration (ergonomics)

BEP FIT

BEP BAT

unprinted unprinted labels printed labels serial number printed labels serial number printed lables federal bank eagle printed lables federal bank eagle

1 roll - blue plastic warp 1 roll - blue plastic warp 1 roll - green plastic wrap 1 roll - green plastic wrap

1 roll - blue plastic wrap 1 roll - blue plastic wrap

Materials Required

Sheet1