This document is Appendix G, Attachment 2 of the PBS Leasing Desk Guide, containing seismic compliance forms and instructions for federal building leases. The attachment provides six standardized forms (A through F) that offerors and engineers must complete to demonstrate seismic safety compliance under RP 8 (Standards of Seismic Safety for Existing Federally Owned and Leased Buildings) standards when submitting proposals in response to Request for Lease Proposals (RLP).
Forms A through D are pre-award submittals required with the initial offer. Form A (Certificate of Seismic Compliance – Benchmark Building) applies to buildings designed and constructed under specified historical building codes that provide acceptable life-safety protection. Form B (Certificate of Seismic Compliance – Existing Building) requires engineering evaluation using ASCE/SEI 31 methodology at the Life Safety Performance Level, including structural, nonstructural, and geologic site hazard checklists. Form C comprises two parts: Part 1 addresses retrofit commitments requiring identification of the retrofit engineer and a Tier 1 report demonstrating conformance to ASCE/SEI 41 Basic Safety Objective standards, while Part 2 applies to new construction requiring specification of the applicable building code and engineer in charge. Form D allows offerors to claim exemptions based on either moderate seismicity with less than 10,000 ABOA square feet of federal space or high-seismicity one-story steel or wood-frame buildings under 3,000 ABOA square feet. Forms E and F are post-occupancy submittals required only when retrofit or new construction is performed, certifying compliance prior to government acceptance of the leased space. All engineer certifications must include the engineer's professional stamp, signature, and current license information for Civil or Structural Engineering in the applicable state.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix G: Seismic Safety in Leasing
Attachment 2: Seismic Offer Forms
Instructions to Leasing Specialists:
The following seismic forms are intended to be issued as an attachment to the RLP package. Therefore, unless the transaction is exempted as described under paragraph 3a of this Appendix, the LeO must attach the entire group of six Seismic Forms to the RLP package. The Offeror/Offeror's engineer must fill out the appropriate form(s) among the four pre-award submittals to complete his or her offer. The pre-occupancy submittals are also included as part of the RLP package, to inform Offerors of potential post-award obligations .
PBS Leas ing Desk Guide This page last revised: 911812012
G-13
RLP OFFER ATTACHMENT - SEISMIC OFFER FORMS
Instructions for Offeror:
Forms A through D are pre-award submittals . Depending upon the form, either the Offeror or the Offeror's engineer shall complete and sign the form to confirm seismic compliance with RP 8. When the engineer fills out a form, he or she is also required to stamp it. The Offeror's engineer shall represent whether the Building meets RP 8 standards, using Form A for Benchmark Buildings or Form B for other existing buildings.
If the engineer's certification indicates that the Building does not meet RP 8 standards, the Offeror shall agree to retrofit the building to meet the standards, using Form C, Part
1. Offerors providing new construction shall commit to a design code, using Form C, Part
2. Offerors may represent that their building meets an exemption criteria, using Form D.
Forms E and F are post-award submittals. They only apply when the Offeror has agreed to either retrofit an existing building (use Form E) or is constructing a new building (use Form F). Prior to the Government accepting leased space, the Lessor's engineer shall complete, stamp, and sign the appropriate representation.
The forms must include the supporting documentation stated in the RLP and Lease.
Below is a detailed explanation of each of the forms.
SEISMIC FORM A - CERTIFICATE OF SEISMIC COMPLIANCE BENCHMARK BUILDING
A benchmark building is one that was designed and built or retrofitted in accordance with structural provisions that are considered to provide acceptable life-safety protection. RP 8, Section 1.3, Table 1-1 shows the construction codes that qualify a building as a Benchmark Building. If a building qualifies, no additional hazards need be considered. If the seismicity of a region has changed since the benchmark dates listed in the table, the building must be evaluated in accordance with the now current or greater seismicity of the region to be compliant with the RP 8 Standards.
SEISMIC FORM B - CERTIFICATE OF SEISMIC COMPLIANCE EXISTING BUILDING
The engineer shall evaluate the building to determine compliance with the Life Safety Performance Level. He or she shall use RP 8 Chapter 3 and ASCE/SEI 31 to determine compliance. The evaluation must include the appropriate Structural, Nonstructural, and Geologic Site Hazard and Foundation Checklists with backup calculations.
SEISMIC FORM C - BUILDING RETROFIT OR NEW CONSTRUCTION PRE-AWARD
COMMITMENT
Part 1 only applies to planned retrofit of an existing building. The Offeror shall identify the engineer in charge of the seismic retrofit and commit that the retrofit's design and construction will conform to the requirements of ASCE/SEI 41, Basic Safety Objective.
The commitment must also include a Tier 1 report with supporting documentation, a narrative, scope, and schedule of the proposed renovations .
PBS Leas ing Desk Guide
G-14
Attachment 2: Seismic Offer Forms <Y
Part 2 only applies to new construction . The Offeror shall identify the engineer in charge of the design of the building and specify which building code he or she is using to design and construct.
SEISMIC FORM D - OFFEROR'S REPRESENTATION OF EXEMPTION FROM SEISMIC
STANDARDS
The Offeror may claim an exemption from seismic compliance if representing that the offered building meets either of the following exemptions:
• In an area of moderate seismicity, the total space leased in the building by the Federal government, including the offered space, will be less than 10,000 ABOA SF upon commencement of the lease term.
• In an area of high to very high seismicity, the offered building is a one-story building of steel light frame or wood construction with less than 280 m2 (3,000
ABOA SF).
SEISMIC FORM E - CERTIFICATE OF SEISMIC COMPLIANCE RETROFITTED BUILDING
The engineer in charge of the building's structural retrofit of the leased building shall certify that the design standard was the Basic Safety Objective as set forth in ASCE/SEI 41, Seismic Rehabilitation of Existing Buildings, and that the building was retrofitted to that standard.
SEISMIC FORM F - CERTIFICATE OF SEISMIC COMPLIANCE NEW BUILDING
The engineer shall certify that the design and construction of new buildings or additions to existing buildings conforms to the seismic provisions of the latest edition of the applicable State or local government codes under which it was built.
DEFINITIONS - The following definitions apply to the completion of the above-referenced forms:
1. Engineer means a professional engineer who is licensed in Civil or Structural Engineering and qualified in the structural design of buildings. They must be licensed in the state where the property is located.
2. ASC E/SEI 31 means the American Society of Civil Engineers standard, Seismic Evaluation of Existing Buildings." ASCE/SEI 31 can be purchased from ASCE at
(800) 548-2723, or by visiting http://www.pubs.asce.org .
3. ASCE/SEI41 means American Society of Civil Engineers standard, Seismic Rehabilitation of Existing Buildings." ASCE/SEI 41 can be purchased from ASCE at (800) 548-2723, or by visiting http://www.pubs.asce.org.
4. Seismic Certificate means a certificate executed and stamped by an Engineer on the appropriate Certificate of Seismic Compliance form included with this solicitation together with any required attachments.
PBS Leasing Desk Guide This page last revised: 911812012
G-15 http:http://www.pubs.asce.org http:http://www.pubs.asce.org
5. RP 8 means "Standards of Seismic Safety for Existing Federally Owned and Leased Buildings ICSSC Recommended Practice 8 (RP 8)," issued by the Interagency Committee on Seismic Safety in Construction as ICSSC RP 8 and the National Institute of Standards and Technology as NIST GCR 11 -917-12.
You can obtain RP 8 from the Building and Fire Research Laboratory, National Institute of Standards and Technology, Gaithersburg, MD 20899, or download copy athttp://www.wbdg .org/ccb/NIST/nist_gcr11 _917_12.pdf.
PBS Leasing Desk Gu ide
G-16
Appendix G:Seismic Safety in Leasing
SEISMIC FORM A
CERTIFICATE OF SEISMIC COMPLIANCE
BENCHMARK BUILDING
Date: ____
This affirms that ___________ served as engineer in charge of the seismic evaluation of the building located at ____________________
The building has the following characteristics:
~SCE Building Type: No. of Stories: IApprox. Area :
Building Design Code: Year of Design Code: lYear of Construction :
On the basis of the building characteristics and to the extent permitted by this level of evaluation, it is my opinion that the subject Building qualifies as a Benchmark Building as indicated in ASCE/SEI 31, Table 1-1 .
Affix Stamp and Sign Here
Engineer's Name:
Firm:
Address:
Telephone:
License No.:
License State:
Expiration Date:
PBS Leasing Desk Gu ide This page last revised: 9/18/2012
G-17
SEISMIC FORM B
EXISTING BUILDING
Date: _____
This affirms that __----,--________ served as engineer in charge of the seismic evaluation of the building located at ____________________
The building has the following characteristics:
fi\SCE Building Type: No. of Stories: Approx. Area :
Building Design Code: Year of Design Code: Year of Construction:
I have evaluated this building at the Life Safety Performance Level as set forth in the ICSSC RP 8, Standards of Seismic Safety for Existing Federally Owned and Leased Buildings, using ASCE/SEI 31 methodology:
_Tier 1 Evaluation
_ Tier 2 Evaluation
_Tier 3 Evaluation
_ Other (please explain below)
Documentation of this evaluation must be attached to this Certificate.
On the basis of the building characteristics and to the extent permitted by this level of evaluation it is my opinion that subject Building (check one) 0 does / 0 does not meet the Life Safety Performance Level of ICSSC RP 8.
Affix Stamp and Sign Here
Engineer's Name:
Firm:
Address:
Telephone:
License State:
Comments:
Attach : ASCE/SEI 31 Checklist(s) Structural , Nonstructural, and Geologic Site Hazards and Foundation.
PBS Leasing Desk Guide This page last revised: 9/18/2012
G-18
SEISMIC FORM C
BUILDING RETROFIT OR NEW CONSTRUCTION
PREAWARD COMMITMENT
PART 1
PREAWARD COMMITMENT TO RETROFIT BUILDING:
Date: _____
This affirms that shall serve as the engineer in charge of the seismic retrofit of the building located at . The retrofit must be designed to meet the Basic Safety Objective, as set forth in ASCE/SEI 41 Seismic Rehabilitation of Existing Buildings.
In accordance with the requirements of this Standard and the seismic paragraph in the Request for Lease Proposals (RLP), our offer includes a commitment to retrofit the building to satisfy all of the Basic Safety Objective requirements of ASCE/SEI 41 . The offer includes a Tier 1 report with all supporting documents, a narrative explaining the process, scope of renovations, and a schedule for the seismic retrofit.
Documentation shall be provided before award that demonstrates the seismic retrofit will meet the seismic standards and be completed within the time frame required.
PART 2
PREAWARD COMMITMENT TO CONSTRUCT A NEW BUILDING:
Date: _____
This affirms that _----:_________ will serve as the engineer in charge of the structural design of the building located at . The criteria for design must be the ___ edition of the __________ building code.
In accordance with the requirements of this code, we prepared a quality assurance plan that included requirements for testing and inspecting critical elements of the structure and also periodic observation by our staff. We reviewed special inspection and testing reports prepared by the inspection agency and contractor submittals. On the basis of this, and to the extent permitted by this level of construction surveillance, it is my opinion that the Building was designed and constructed in conformance with the requirements of the above code.
The building has the following characteristics:
Building Type: Building Height: ~pprox . Area:
Building Design Code: [Year of Design Code: Year of Construction:
OFFEROR
SIGNATURE INAME OF SIGNER
PBS Leasing Desk Guide
G-19
SEISMIC FORM D
OFFEROR'S REPRESENTATION OF EXEMPTION FROM SEISMIC STANDARDS
Date: ____
I represent that my building is exempt from the requirements of RP 8 because:
D The Building is located in an area of medium seismicity and the Building will have less than 10,000 ABOA SF of space leased to the Federal Government upon commencement of the lease term.
D The Building is located in an area of high to very high seismicity, and it is a one-story building with a steel light frame or wood construction with less than 3,000 ABOA SF of space in the building.
OFFEROR
SIGNATURE iAM' 0' "0""
PBS Leasing Desk Guide
G-20
SEISM IC FORM E
RETROFITTED BUILDING
PRE-OCCUPANCY CERTIFICATE:
Date: _____
This affirms that served as the engineer in charge of the structural retrofit of the building located at . The standard for design was the Basic Safety Objective as set forth in ASCE/SEI 41 Seismic Rehabilitation of Existing Buildings.
In accordance with this Standard, we prepared a quality assurance plan, which requires staff to observe, test, and inspect the seismic retrofit work. We have also reviewed special inspection and testing reports prepared by the inspection agency and contractor submittals. On the basis of this, and to the extent permitted by this level of construction surveillance, it is my opinion that building was designed and constructed to conform with the requirements of the Standard listed above.
The building has the following characteristics:
IASCE Building Type: No. of Stories: Approx. Area:
Building Design Code : Year of Design Code: Year of Construction:
Retrofit Design Standard: Year of Retrofit Standard: Year of Retrofit:
Documentation of this retrofit must be available to GSA.
On the basis of the above, it is my opinion that subject Building _ does, _ does not meet the Basic Safety Objective - Performance Level as set forth in ASCE/SEI 41, Seismic Rehabilitation of Existing Buildings.
Affix Stamp and Sign Here
Engineer's Name:
State:
PBS Leasing Desk Guide
G-21
SEISMIC FORM F
NEW BUILDING
PRE-OCCUPANCY CERTIFICATE:
Date: ____ _
This affirms that served as the engineer in charge of the structural design of the building located at ___________. The criteria for design were the edition of the _____ ____ code.
In accordance with the requirements, we prepared a quality assurance plan, which requires staff to observe, test, and inspect the structure's critical elements. We have also reviewed special inspection and testing reports prepared by the inspection agency and contractor submittals. On the basis of this, and to the extent permitted by this level of construction surveillance, it is my opinion that the building was designed and constructed to conform with the requirements of the code listed above.
The building has the following characteristics:
Building Type: Bldg . Height: Approx. Area:
Building Design Code: lYear of Design Code: Year of Construction:
Affix s tamp and sign here
Engineer's Name:
State:
Comments :
PBS Leas ing Desk Guide Tilis page last revised: 911812012
G-22
NOVEMBER 1, 2016
Very High
High
Seattle Moderate High American Lake Spokane
Moderate Low Vancouver Walla Walla
White River Fort Harrison Portland Miles City Low Junction Togus
U.S. Department of Veterans Affairs Seismic Zone Map H 18-8 Note: Seismicity is based on Spectral acceleration listed in ASCE 7-10
Fargo Iron Mountain
St. Cloud Manchester Roseburg
Sheridan
Durham
Fayetteville
Coatsville
Canadaigua
Syracuse
Castle Point
Albany
Providence Newington
West Haven Northport Montrose Bronx Brooklyn/ St. Albans
NYC
East Orange
Lyons Philadelphia
Wilmington
Baltimore Perry Point
Bedford White City Tomah Batavia Boston/ Fort Meade Boise Minneapolis West Roxbury
Saginaw Hot Springs Milwaukee BuffaloSioux Falls Brockton Erie Northhampton Battle Creek Madison Detriot Wilkes-Barre
Ann Arbor Lebanon DesMoines ButlerChicagoReno Cleveland Cheyenne
Fort Wayne Pittsburgh Sacramento Iowa City OmahaSalt Lake City Dayton Columbia Grand Island Lincoln Marion Danville Martinez San Francisco Denver
Chillicothe Menlo Park Indianapolis Clarksburg Cincinnati Fresno Palo Alto Wash. DC Kansas City Grand Junction Huntington Topeka
St.Louis Richmond Columbia Marion Lexington Salem
Las Vegas Louisville Wichita Salisbury
Mt. Home Sepulveda Poplar Bluff Loma Linda Muskogee Nashville West Los Angeles Asheville
Long Beach Albuquerque Oklahoma City Fayetteville Murfreesboro Prescott Hampton Amarillo Memphis Columbia Little Rock
Phoenix Atlanta Birmingham Charleston San Diego Tuscaloosa Bonham Augusta
Tuskegee Tucson Shreveport Jackson Montgomery Dublin
El Paso Dallas
Big Spring Lake City Alexandria
Waco Biloxi New Orleans Temple Gainesville Kerryville
Houston Tampa Honolulu Orlando San Antonio
Bay Pines West Palm Beach
Miami Anchorage Hawaii
San Juan
Alaska Puerto Rico
CFM Office of Facilities Planning - 003C2
| EXHIBIT J - SEISMIC OFFER FORMS |
| SEISMIC ZONE MAP USA VHA CFM 11-01-2016 |
File details come from the government source that posted it. Updated .