This is a pricing sheet exhibit for a construction project at West Virginia Schools for the Deaf and the Blind, specifically for work on Keller Hall. The document serves as the bidder's formal proposal to furnish all labor, material, equipment, supplies, and transportation necessary to complete the work in accordance with the bidding documents. The pricing sheet requires bidders to provide a base bid amount and unit prices for materials and services as specified in Section 012100 of the allowance section of the project specifications.

The base bid amount is left blank in the template, indicating bidders must complete this figure based on their cost analysis. Unit prices are requested for brick and cast stone, with both listed at zero in the template pending contractor input. The document specifies that unit prices are incorporated into the base bid and serve as prices per unit of measurement for materials, equipment, or services applicable throughout the duration of the work. Notably, contractor-provided unit prices are not considered by the owner when determining the lowest qualified bidder, meaning the base bid is the primary evaluation metric for award purposes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

West Virginia Schools for the Deaf and the Blind
Keller Hall
Exhibit A Pricing Sheet

The Bidder, being familiar with and understanding the bidding documents and also having examined the site and being familiar with all location conditions affecting the project, hereby proposes to furnish all labor, material, equipment, supplies and transportation and to perform all work in accordance with the Bidding Documents within the time set forth as follows:

Base Bid:$ - 0
Unit price is an amount incorporated into the Base Bid, as noted in Section 012100 of the Allowance section of the specification, applicable during the duration of the Work as a price per unit of measurement for materials, equipment, or services, or a portion of the Work. Contractor provided Unit Prices indicated below are not considered by the Owner when determining the lowest qualified bidder.

Unit Prices:

Per per liner foot
Brick$ - 0
Cast Stone$ - 0