Ex A - A20 Anti Tamper Program Protection Plan.pdf

PDF 868 KB Posted

Attached to
Wireless AT Platform Test Set (WATS) AMENDMENT 0002 Federal contract opportunity
Solicitation number
W31P4Q21R0058
Issued by
Department of the Army Materiel Command Contracting Command Redstone Arsenal

About this file

This solicitation requests proposals for a Wireless AT Platform Test Set contract. The Army Materiel Command seeks to award an indefinite delivery, indefinite quantity contract for a period of five years to procure Wireless At-Platform Test Adapter Kits. The solicitation includes exhibits for contract data requirement lists and attachments for the statement of work, contractor information, pricing spreadsheets, and a past performance questionnaire. Offerors must submit proposals by June 3, 2021 at 4:00 PM Central Time for consideration. The competition is restricted to small businesses.

View the file

Other files for this federal contract opportunity

Other files attached to Wireless AT Platform Test Set (WATS) AMENDMENT 0002, newest first.
File Type Posted
Attachment 0006 -DRAFT WATS Government Furnished Equipment.pdf PDF
Attachment 0005 - Responses to Offerors Questions.pdf PDF
W31P4Q21R0058-0002.pdf PDF
W31P4Q-21-R-0058 0001.pdf PDF
Attachment 0003 Pricing Spreadsheet for Out Years.xlsx XLSX spreadsheet
Ex A - A16 Technical Report - Study Services - First Article Inspection Report.pdf PDF
Ex A - A06 Notice of Revision - Configuration Control Document.pdf PDF
Ex A - A05 Engineering Change Proposal - Configuration Control Document.pdf PDF
Ex A - A11 Conference Minutes.pdf PDF
Ex A - A03 Test Procedure - Product Acceptance Inspection Test Plan.pdf PDF
W31P4Q-21-R-0058 4 May 2021.pdf PDF
Ex A - A17 Engineering Release Record.pdf PDF
Ex A - A13 Technical Report - Study Services - Serial Number Reporting.pdf PDF
Ex A - A10 Production Status Report.pdf PDF
Ex A - A15 Contractor Status Accounting Information - CSA.pdf PDF
Ex A - A01 Test Procedure - Pilot Lot Test Plan.pdf PDF
Attachment 0001 Statement of Work (SOW).pdf PDF
Ex A - A14 Contractor CMP - Obsolescence Management Plan.pdf PDF
Ex A - A08 FACAR.pdf PDF
Ex A - A04 Test Inspection Report - Product Acceptance Inspection Report.pdf PDF
Ex A - A02 Test Inspection Report - Pilot Lot Test Report.pdf PDF
Attachment 0004 - Past Performance Questionnaire Form.pdf PDF
Attachment 0002 DCMA and CAGE Code Info.xlsx XLSX spreadsheet
Ex A - A19 Hazardous Material Management Program.pdf PDF
Ex A - A09 Warranty Performance Report.pdf PDF
Ex A - A07 Request For Deviation - Configuration Control Document.pdf PDF
Ex A - A18 Production Control Report (PCR).pdf PDF
Ex A - A12 GFE Report.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages Adobe Professional 8.0

TDP:
TM:
OTHER:
E CONTRACTPR NO:
F CONTRACTOR:
2 TITLE OF DATA ITEM: Anti-Tamper Program Protection Plan
3 SUBTITLE:
5 CONTRACT REFERENCE: SOW Para 3.2.7.11
6 REQUIRING OFFICE: SFAE-CSS-FP-TM-APA
10 FREQUENCY: SEE BLK 16
12 DATE OF FIRST SUBMISSION: SEE BLK 16
14 DISTRIBUTION:
11 AS OF DATE: SEE BLK 16
13 DATE OF SUBSEQUENT SUBMISSION: SEE BLK 16
H DATE:
I APPROVED BY:
J DATE: 4 June 2020
17 PRICE GROUP:
Page:
of:
18 ESTIMATED TOTAL PRICE:
B EXHIBIT:
9 DIST STATEMENT REQUIRED: A
a ADDRESSEERow1: SFAE-CSS-FP-TM-APA

DraftRow1:

RegRow1:

ReproRow1:

ContractNo:
SysItem: Wireless At-Platform Test Sets (WATS)
DataItem: A20
Authority: AR-70-77
DD250: NO
APPCODE: N/A
PreparedBy:
Text3: Block #10, 11, 12, and #13: Initial report due 30 days after the Government identifies Critical Program Information (CTI) or Critical Technology (CT).

Allow 30 days for Government review and acceptance. If rejected, re-submissions are due 15 days after Government notification. Allow 15 days after receipt of re-submission for acceptance by the Government.

Block #14: Documents shall be delivered in Microsoft Word 2013 or compatible format on a CD-ROM, DVD, or as an attached file through electronic mail sent to usarmy.redstone.peo-cs-css.mbx.pd-tmde-apats@mail.mil

Distribution Statement A. Approved for public release; distribution is unlimited

Export - Control Act Warning - Not Required

Text4: 0
Text5: 1
Text6: 0
2020-06-04T17:03:05-0500
CARNES.PHILLIP.J.1259307780

File details come from the government source that posted it. Updated .