This Contract Data Requirements List (CDRL) outlines reporting requirements for a pilot lot test of the Wireless At-Platform Test Sets (WATS). The contractor must submit a draft pilot lot test report within 15 days of completing pilot lot testing. This report will document test and inspection results, findings, and analysis to enable the government to evaluate compliance with the Technical Data Package. The final report is due 10 days after government review of the draft. Distribution of the report shall be to SFAE-CSS-FP-TM-APA and include one electronic copy. The estimated total price for this CDRL is not to exceed $1,000.
This solicitation seeks a 5-year Indefinite Delivery-Indefinite Quantity contract for Wireless At-Platform Test Adapter Kits. The solicitation includes 20 Contract Data Requirements Lists, the Statement of Work, contractor information, pricing spreadsheets for spare parts in out years, and a past performance questionnaire. Responses are due by June 3, 2021. This is a Small Business set-aside being issued by the Department of the Army Materiel Command Contracting Command at Redstone Arsenal.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages Adobe Professional 8.0
| TDP: |
| TM: |
| OTHER: |
| E CONTRACTPR NO: |
| F CONTRACTOR: |
| 2 TITLE OF DATA ITEM: Test/Inspection Report |
| 3 SUBTITLE: Pilot Lot Test Report |
| 5 CONTRACT REFERENCE: SOW Para 3.2.1.5 |
| 6 REQUIRING OFFICE: SFAE-CSS-FP-TM-APA |
| 10 FREQUENCY: ONE/R |
| 12 DATE OF FIRST SUBMISSION: SEE BLK 16 |
| 14 DISTRIBUTION: |
| 11 AS OF DATE: N/A |
| 13 DATE OF SUBSEQUENT SUBMISSION: ASGEN |
| H DATE: |
| I APPROVED BY: |
| J DATE: 4 June 2020 |
| 17 PRICE GROUP: |
| Page: |
| of: |
| 18 ESTIMATED TOTAL PRICE: |
| B EXHIBIT: |
| 9 DIST STATEMENT REQUIRED: A |
| a ADDRESSEERow1: SFAE-CSS-FP-TM-APA |
DraftRow1:
RegRow1:
ReproRow1:
| ContractNo: |
| SysItem: Wireless At-Platform Test Sets (WATS) |
| DataItem: A02 |
| Authority: DI-NDTI-80809B |
| DD250: NO |
| APPCODE: A |
| PreparedBy: |
| Text3: Block #8: Allow 10 days for Government review/approval. If disapproved, re-submissions APA due 5 days after receipt of Government notification. Allow 5 days after receipt of re-submissions for Government approval. |
Block# 12: Draft Pilot Lot Test Report is due 15 days after completion of Pilot Lot Testing. The contractor shall submit a pilot lot test report to document test/inspection results, findings, and analysis that will enable the Government to evaluate compliance with the Technical Data Package (TDP).
Block #14: Documents shall be delivered in Microsoft Word 2013 or compatible format on a CD-ROM, DVD, or as an attached file through electronic mail sent to usarmy.redstone.peo-cs-css.mbx.pd-tmde-apats@mail.mil
Distribution Statement A. Approved for public release; distribution is unlimited
Export - Control Act Warning - Not Required
| Text4: 1 | |
| Text5: 1 | |
| Text6: 0 | |
| 2020-06-04T16:34:05-0500 | |
| CARNES.PHILLIP.J.1259307780 |
File details come from the government source that posted it. Updated .