Ex A - A05 Engineering Change Proposal - Configuration Control Document.pdf
PDF 869 KB Posted
- Attached to
- Wireless AT Platform Test Set (WATS) AMENDMENT 0002 Federal contract opportunity
- Solicitation number
- W31P4Q21R0058
About this file
This document contains a Contract Data Requirements List (CDRL) and details for a solicitation seeking a Wireless AT Platform Test Set. The CDRL outlines requirements for Engineering Change Proposals, requiring submissions as needed to address performance, obsolescence, new technology insertion, or contractor-proposed changes. Submissions are due 30 days after requirement identification or 10 days after government notification of required resubmission. Distribution of the CDRL and any submissions shall be to the Army project office via email.
The solicitation seeks a 5-year Indefinite Delivery/Indefinite Quantity contract for Wireless AT Platform Test Adapter Kits. As a Small Business set-aside, the solicitation expires on June 3, 2021. The statement of work, past performance questionnaire, pricing sheets for outyears, and contractor cage code information are provided as attachments. The Army Materiel Command Contracting Command at Redstone Arsenal is the contracting agency.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages Adobe Professional 8.0
| TDP: |
| TM: |
| OTHER: |
| E CONTRACTPR NO: |
| F CONTRACTOR: |
| 2 TITLE OF DATA ITEM: Engineering Change Proposal (ECP) |
| 3 SUBTITLE: Configuration Control Document |
| 5 CONTRACT REFERENCE: SOW Para 3.2.1.6, 3.2.3, 3.2.3.1 and 3.2.2.3 |
| 6 REQUIRING OFFICE: SFAE-CSS-FP-TM-APA |
| 10 FREQUENCY: SEE BLK 16 |
| 12 DATE OF FIRST SUBMISSION: SEE BLK 16 |
| 14 DISTRIBUTION: |
| 11 AS OF DATE: N/A |
| 13 DATE OF SUBSEQUENT SUBMISSION: ASGEN |
| H DATE: |
| I APPROVED BY: |
| J DATE: 4 June 2020 |
| 17 PRICE GROUP: |
| Page: |
| of: |
| 18 ESTIMATED TOTAL PRICE: |
| B EXHIBIT: |
| 9 DIST STATEMENT REQUIRED: A |
| a ADDRESSEERow1: SFAE-CSS-FP-TM-APA |
DraftRow1:
RegRow1:
ReproRow1:
| ContractNo: |
| SysItem: Wireless At-Platform Test Sets (WATS) |
| DataItem: A05 |
| Authority: DI-SESS-80639D |
| DD250: NO |
| APPCODE: A |
| PreparedBy: |
| Text3: Block #8: Allow 30 days for Government review/approval. Notification of Government disapproval of ECPs will be by letter of transmittal (LT) or electronically. The Government will incorporate approved ECPs into the contract by modification. |
If disapproved, re-submissions due 10 days after receipt of Government notification. Allow 10 days after receipt of re-submissions for Government approval.
Block# 10 and # 12: As required. When an Engineering Change Proposals submission is required as outlined in the SOW to address Performance and Obsolescence, New Technology Insertion, and/or contractor proposed Engineering Change Proposal requirements.
Block #14: Documents shall be delivered in Microsoft Word 2013 or compatible format on a CD-ROM, DVD, or as an attached file through electronic mail sent to usarmy.redstone.peo-cs-css.mbx.pd-tmde-apats@mail.mil
Distribution Statement A. Approved for public release; distribution is unlimited
Export - Control Act Warning - Not Required
| Text4: 0 | |
| Text5: 1 | |
| Text6: 0 | |
| 2020-06-04T16:42:06-0500 | |
| CARNES.PHILLIP.J.1259307780 |
File details come from the government source that posted it. Updated .